[849] in I/T Delivery

home help back first fref pref prev next nref lref last post

End of July report for IS Web Redesign Project

daemon@ATHENA.MIT.EDU (Christine M. Cavanna)
Fri Aug 9 12:30:06 2002

Mime-Version: 1.0
Message-Id: <p05010401b9799b7c80b9@[18.90.1.57]>
Date: Fri, 9 Aug 2002 12:29:58 -0400
To: delivery@mit.edu
From: "Christine M. Cavanna" <cavanna@MIT.EDU>
Cc: isweb@mit.edu
Content-Type: multipart/alternative; boundary="============_-1183211893==_ma============"

--============_-1183211893==_ma============
Content-Type: text/plain; charset="us-ascii" ; format="flowed"

Project Name: IS Web Redesign Project
Project Leader: Christine Cavanna
                 Jeff Reed
Report Date: August 9, 2002
URL: http://web.mit.edu/is/delivery/isweb/

Accomplishments in July
- Finalized the Scope Document.
- Collected final feedback from Advisory Council and some IS staff on wire
   frame options.
- Usability of paper wire frames.
- Reviewed site map and wire frames with Sponsors for feedback.
- Finalized site map and wire frames.
- Scheduled design presentations and next rounds of usability tests.
- Met with staff in the Libraries to get feedback on the guidelines they
   use in updating and maintaining their web site.


Goals for August
- Complete 1st draft of Guidelines and Policies for adding, maintaining and
   auditing IS web pages (probably closer to September).
- Communicate status of project to infosys (August 9)
- Hold working session with Core Team to talk about content for NEW pages
   and Templates needed.
- Design Presentation 1 to Sponsors and Advisory Council -- scheduled for
   Monday, August 12.
- Presentation to ITLT on Thursday, August 15 of the design directions.
- Work with Barrett to refine designs.
- Work with staff on content for Topic Pages of the web site.
- Begin development, research and data gathering for content of various
   web site pages.
- Solicit feedback on Products and Services for an alphabetic listing to
   be including in the new web site.



Next Community Milestone
- NOTE:  There will not be a milestone that is visible to the community (MIT)
   until the implementation of the new pages.  However, there are planned check
   in's with the Advisory Council, IS staff and with Usability testers during
   the project.


Issues/Learnings (ongoing)
- Project is very large based on size of Web site
- There will need to be many sub-teams to keep critical check-ins for usability
   testing, quality assurance and information architecture throughout 
the project
- These initial phases of developing the wire frames and site map are critical
   to the overall site and although it has pushed the time line out a bit; the
   time spent refining these will benefit the site redesign in the long run.
- Team will need to propose an implementation plan regarding how the
   content will be converted/transferred into the newly designed site; by whom;
   and by when (this will need to be a phased approach).  This may be the
   largest part of the task.
- No matter what direction is finally decided on with the site, we will not
   be able to please everyone.


Team Dynamics
- Need to keep energy levels up as we move into the next phase; a lot of
   content to be reviewed, written and decisions to be made.
-- 
=============================================================================
Christine M. Cavanna                                    cavanna@mit.edu
Senior Project Manager and                              617.253.9814    Voice
   Special Asst to the VP for Information Systems        617.253.0750    Fax
Massachusetts Institute of Technology
77 Massachusetts Avenue  Room 10-219
Cambridge, MA 02139-4307
============================================================================= 
 
--============_-1183211893==_ma============
Content-Type: text/html; charset="us-ascii"

<!doctype html public "-//W3C//DTD W3 HTML//EN">
<html><head><style type="text/css"><!--
blockquote, dl, ul, ol, li { margin-top: 0 ; margin-bottom: 0 }
 --></style><title>End of July report for IS Web Redesign
Project</title></head><body>
<div>Project Name: IS Web Redesign Project</div>
<div>Project Leader: Christine Cavanna</div>
<div
>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span>&nbsp;&nbsp;&nbsp;&nbsp; Jeff Reed</div>
<div>Report Date: August 9, 2002</div>
<div>URL:<font color="#0000FF"><u>
http://web.mit.edu/is/delivery/isweb/</u></font></div>
<div><u><br></u></div>
<div><u>Accomplishments in July</u></div>
<div>- Finalized the Scope Document.</div>
<div>- Collected final feedback from Advisory Council and some IS
staff on wire</div>
<div>&nbsp; frame options.</div>
<div>- Usability of paper wire frames.</div>
<div>- Reviewed site map and wire frames with Sponsors for
feedback.</div>
<div>- Finalized site map and wire frames.</div>
<div>- Scheduled design presentations and next rounds of usability
tests.</div>
<div>- Met with staff in the Libraries to get feedback on the
guidelines they</div>
<div>&nbsp; use in updating and maintaining their web site.</div>
<div><br></div>
<div>&nbsp;</div>
<div><u>Goals for August</u></div>
<div>- Complete 1st draft of Guidelines and Policies for adding,
maintaining and</div>
<div>&nbsp; auditing IS web pages (probably closer to
September).</div>
<div>- Communicate status of project to infosys (August 9)</div>
<div>- Hold working session with Core Team to talk about content for
NEW pages</div>
<div>&nbsp; and Templates needed.</div>
<div>- Design Presentation 1 to Sponsors and Advisory Council --
scheduled for</div>
<div>&nbsp; Monday, August 12.</div>
<div>- Presentation to ITLT on Thursday, August 15 of the design
directions.</div>
<div>- Work with Barrett to refine designs.</div>
<div>- Work with staff on content for Topic Pages of the web
site.</div>
<div>- Begin development, research and data gathering for content of
various</div>
<div>&nbsp; web site pages.</div>
<div>- Solicit feedback on Products and Services for an alphabetic
listing to</div>
<div>&nbsp; be including in the new web site.</div>
<div><br></div>
<div><br></div>
<div>&nbsp;</div>
<div><u>Next Community Milestone</u></div>
<div>- NOTE:&nbsp; There will not be a milestone that is visible to
the community (MIT)</div>
<div>&nbsp; until the implementation of the new pages.&nbsp; However,
there are planned check</div>
<div>&nbsp; in's with the Advisory Council, IS staff and with
Usability testers during</div>
<div>&nbsp; the project.</div>
<div><br></div>
<div>&nbsp;</div>
<div><u>Issues/Learnings (ongoing)</u></div>
<div>- Project is very large based on size of Web site</div>
<div>- There will need to be many sub-teams to keep critical check-ins
for usability</div>
<div>&nbsp; testing, quality assurance and information architecture
throughout the project</div>
<div>- These initial phases of developing the wire frames and site map
are critical</div>
<div>&nbsp; to the overall site and although it has pushed the time
line out a bit; the</div>
<div>&nbsp; time spent refining these will benefit the site redesign
in the long run.</div>
<div>- Team will need to propose an implementation plan regarding how
the</div>
<div>&nbsp; content will be converted/transferred into the newly
designed site; by whom;</div>
<div>&nbsp; and by when (this will need to be a phased approach).&nbsp;
This may be the</div>
<div>&nbsp; largest part of the task.</div>
<div>- No matter what direction is finally decided on with the site,
we will not</div>
<div>&nbsp; be able to please everyone.</div>
<div><br></div>
<div><br></div>
<div><u>Team Dynamics</u></div>
<div>- Need to keep energy levels up as we move into the next phase; a
lot of</div>
<div>&nbsp; content to be reviewed, written and decisions to be
made.</div>

<div>-- <br>
=====================================================================<span
></span>========<br>
Christine M.
Cavanna&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span
>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span
>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span>&nbsp;&nbsp;&nbsp; cavanna@mit.edu<br>
Senior Project Manager
and&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span
>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<span
></span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
617.253.9814&nbsp;&nbsp;&nbsp; Voice<br>
&nbsp; Special Asst to the VP for Information
Systems&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
617.253.0750&nbsp;&nbsp;&nbsp; Fax<br>
Massachusetts Institute of Technology<br>
77 Massachusetts Avenue&nbsp; Room 10-219<br>
Cambridge, MA 02139-4307<br>
=====================================================================<span
></span>========&nbsp;&nbsp; </div>
</body>
</html>
--============_-1183211893==_ma============--

home help back first fref pref prev next nref lref last post