5ESS upgrade and replacement project

daemon@ATHENA.MIT.EDU (Louise T. Keohane)
Fri May 10 11:41:11 2002

Message-Id: <5.0.2.1.2.20020510113259.009ff740@hesiod>
Date: Fri, 10 May 2002 11:39:18 -0400
To: delivery@mit.edu
From: "Louise T. Keohane" <lu@MIT.EDU>
Cc: telecom-ops@mit.edu, njj@mit.edu
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_7652119==_.ALT"

--=====================_7652119==_.ALT
Content-Type: text/plain; charset="iso-8859-1"; format=flowed
Content-Transfer-Encoding: quoted-printable

Project Name: 5ESS upgrade and replacement
Project Leader: Lu Keohane
Report Date May 6, 2002
Submitted by: Lu Keohane
Project Notebook URL:  http://web.mit.edu/is/delivery/5ess/

Accomplishments in April:
%       Lucent continues testing the lines on the new equipment.  Status of=
=20
Lucent=92s testing of the new 5ESS is as follows:

                 ANALOG  Lines complete  Lines accurate  %
                 E19=3D            3500                    3465=20
      99.0%
                 24=3D             3475                    3440=20
      99.0%
                 NW12=3D           4426                    4382=20
      99.0%

                 ISDN            Lines complete  Lines accurate  %
                 E19=3D            3621                    3584=20
      98.0%
                 24=3D             2742                    2714=20
      99.0%
                 NW12=3D           1093                    1082=20
      99.0%

* NOTE:  E19=92s SM21 is not being verified.  This SM2K will become part of=
=20
the new switch on cut over.


%       Special circuits continued to be cross wired.  Progress is as=
 follows:
         Special Circuits:       431 modem pool lines compete and 100%=
 accurate
         (100% complete) 100 voice mail lines complete and accurate
                                 203 misc. modems, alarms, etc to be=20
completed   by 4/30/02


%       The equipment for EXM6 is in place in the =93holding room=94 across=
=20
from the 24 switch room=85 It is 50% complete.  The       cabling to the=20
power plant is complete and the jumpers are being placed in their temporary=
=20
positions until after the old        equipment is removed from the 24=20
switchroom.  Our expectations are that this SM will be 100% complete before=
=20
cutover    and prepared for the hot slide when we accept the new=20
switch.  This should expedite growth capabilities within 30 days=20
of       cutover.

%       The 5ESS Team continues to randomly validate the cable/pair records=
=20
and Lucent=92s frame verification sheets for accuracy         on all three=
=20
switching frames.  We are running close to 98% accurate (of the things we=20
can know)=85 The cutover could     result in unexpected service outages.  We=
=20
are trying to pro actively remove all known obstacles and have a plan in=20
place for    the unplanned should they occur..


%       The validity checks on the MDF=92s vs. the ICE 9 database:
o       NW12 is 100% up-to-date and as accurate as the database
o       24 is 98% up-to-date and as accurate as the database
o       E19 is 96% complete and accurate.  MIT found all inaccuracies and=20
presented a running list to Lucent.  MIT performed tracing and spreadsheets=
=20
for Lucent.  These spreadsheets assisted Lucent in becoming closer to 100%=
=20
accurate in all 3 switch sites.  The running sheets are analyzed daily by=20
Steve Morris and updated into ICE 9 by Annette Smith.  Thank you Steve for=
=20
being so meticulous and focused and assisting Lucent with this process (we=
=20
would not be 100% otherwise).  Thanks to Annette we have had ICE 9 updated=
=20
faster then Lucent performed all of these changes=85 Thanks!

%       Continue to update cable and pairs found within frame verification=
=20
and day-to-day repair changes.  (Approximately 5 - 10 cable/pair changes=20
per day).
%       Continue to trace anomalies and update spreadsheets and databases=20
(ongoing until cutover)
%       Continue to oversee all telephone moves, adds, changes and trouble=
=20
tickets.  Mapping and updating the 5E database       with cable and pair=20
changes in chronological order (for a more accurate database at cut=20
over).   Lucent has caught up to the    daily MAC=92s and the database is=
 now=20
in sync and service orders will not be written during the =93freeze=94=
 period=20
(starting         Friday, May 10, 2002).
%       Established visibility with our Remote monitoring maintenance=20
center (they are currently watching both switches.
%       Recorded all announcement (e.g the number you dial at MIT is not in=
=20
service), on the  5ESS and loaded them into the     16RA.  Precut testing=20
of these recordings went well.
%        Continue testing ICE 9=92s new database and prepare for cut over.
%       ISDN conversion from the E19 switch room continues.  This work is=20
service affecting therefore 3-down is updated daily and       most of the=20
work takes place after hours. The remaining testing on ISDN is=20
troubleshooting known anomalies.
%       The testing of ICE 9 continues as modifications of the ICE 9 code=20
are changed.  Newest issue is LCC change updates all  records and reassigns=
=20
all current equipment on the 5ESS.
%       Worked on the billing issues in which we dumped the calling data=20
from the new switch (after dialing all types of calls).  The   old switch=20
used 9mm tapes and the new switch uses dat tapes.  We were successful in=20
having the data loaded onto the     dat tape, but reading it was impossible=
=20
(aside from the headings).  Worked with Lucent and resolved this issue on=20
5/10/02.      thank you mad dog Cyr for staying on Lucent with this and=20
Jana for doing all possible testing of the dat tape here and at       W91.
%       The ACD was removed from the Classic 5ESS system and installed on=20
the new 5ESS (after hours) and although this took     two nights on=20
troubleshooting, the test work successfully.  Thank you Mary Ziegler and=20
your team for making this test   possible and for assisting us in the=20
testing.
%       Clean-up of ISDN lines continues.  Some old Multiline hunt groups=20
have been found and removed.
%       Testing of analog is almost complete (all old services are complete=
=20
and MAC=92s are very close to being complete).
%       The Plan for U-A to U-B conversion for NW12 and 24 are being shared=
=20
with the appropriate customers.  Most of this work  can start on Friday=20
5/24 but will not be completed until Saturday 5/25.  Steve, Collin and Dave=
=20
will be completing this work    on cutover weekend.
%       Tina Sands had obtained all the necessary equipment and=20
preparations needed for this cutover (e.g. spare cell=20
phones,   walkie-talkies, food, NT1=92s, etc=85).   Thank you Tina for an=20
outstanding job.  Working with you is a pleasure.  It is nice to    have=20
someone who is thorough, skillful and competent.  Thank you.
%       Nate has completed a document detailing the =93MAC=92s moratorium=94=
 and=20
it has been distributed.  All feedback to date from  customers have been=20
positive.  They are appreciative of the details surrounding the moratorium=
=20
as well as getting this  information in a timely manner.
%       Notification has been updated and distributed via Tech Talk, IS=20
Newsletter, Spotlight and the website.  Thank you Robyn         Fizz and=20
Lee Ridgeway.
%       Notification to our vendors has begun.  AT&T, Qwest, PaeTec are=20
aware of the cutover, Verizon is still being worked on.         We will=20
also notify customers running from PBX=92s and/or our Tie line connections=
=20
before 5/24/02.
%       Setup a procedure for =93help=94 calls to be completed before=
 cutover=20
and also to have data modifications completed in all  databases.
%       Testing of new features is being completed.  Joni will work with=20
the volunteer crew to orient them with the lengthy testing     procedure=20
(we will test features, routing, call restrictions, voice mail, ACD,=20
operator services, just to name a few). This     should provide a more=20
efficient feature testing on 5/25/02.
%       Plans to work the Memorial Day weekend have been established.   The=
=20
command Center has been setup and the TL will       provide process and=20
strategy with volunteers for that weekend (5/16/02).    Campus Police and=20
Medical have been supplied         3 cell phones each incase of an=20
emergency.  We have them set up in a critical path and do not expect=20
problems.  If there       are problems, we will know before they will and=20
will be on site immediately.

                                 CUTOVER
         =B7       Print out office records of classic 5ESS (snap=20
shot)  doing for one full week before cutover and during=20
the                     day on the 24th.
         =B7       Setup off campus audio bridge to regroup and discuss any=
=20
outstanding issues.  This call will include, 5ESS              engineers,=20
specialists, the installation team, the Implementation, software experts,=20
and the MIT team.

         =B7       Cut over begins at 6pm  and is expected to be complete=20
with phase one at 1a.m.
    *  Transfer all telephone services from old to new switch; bring new=20
switch on line, accept phase one process and bring the       old off line=20
(the database will be available if information is needed).
    * Bring the new ICE 9 database on line. Test, write TT & SO=92s.
    * All current ISDN users on the classic 5ESS have to have their cards=20
physically receded.  Scripts have been written for the night of cutover to=
=20
shut off the shelves these cards sit on.  If the software modifications=20
don't fix this bug, then we will need to recede all equipment served by the=
=20
ISLU in all three switch locations.  We are writing up a procedure to=20
perform this efficiently and effectively.
    * Saturday 8am through Tuesday at 6am
                 =A7       Managing the help desk and providing records from=
=20
ICE 9 for corrections
                 =A7       Testing of all new and old features
                 =A7       Testing the routing from all three switch rooms
                 =A7       Performing Operator functions (testing of=20
switchboards, features, IVR, Audio Conference bridge, etc.)
                 =A7       Tracing and Re-cross wiring cable and pairs
                 =A7       Changing old U-A cards in the center of Campus=20
with U-B cards
                 =A7       Updating the community via 3-down and emails
                 =A7       Testing Voice mail, ACD, Modem pool, video=20
conferencing, etc.
                 =A7       Troubleshooting in all areas (power, cable, oe=20
assignments, ICE-9, etc.)
                 =A7       Testing Recorded announcements,  Audio bridge,
                 =A7       Etc.  An implementation plan will be documented=
=20
prior to cut over.

%       Our 5ESS Database is approximately 99% built and being verified=20
(e.g. NNX=92s, OE=92s, TN=92s, Trunks,        Routing, etc.).
%       Meet with Lucent every Thursday in E19-732 and some Lucent=20
employees via a conference call.
%       Meeting with Lucent Management one Wednesday a month or as needed.

%       Providing Lucent with information that is needed for the new 5ESS=20
(e.g. software        releases, bmw=92s, etc.)

%       Resolving any issues that arise during this project.  Directing=20
Lucent through the modifications (most recent is creating a     script that=
=20
will assist us the night of cutover and save us hours of work).  Thank you=
=20
Artie for writing a procedure for our    maintenance folks and for staying=
=20
focused on resolving this issue with Lucent).

%       Amis terminals installed in E19, additional terminals are=20
forthcoming for E19, 24 and NW12. Tested ok.

%       Consulted VDIST on the wiring frame for the location of the demarc=
=20
for the new dorms (in the NW12 switch room).         Providing the=20
installation of the MDF equipment that is needed to extend the frame.  We=20
will also have this complete before     5/21/02.

%       Testing was completed off-hours on the integration equipment (3A=20
Translator) to the VMail System.  This test required   hardware=20
modifications which made the =93integration=94 of  the voice mail inoperable=
=20
for under an hour however, the test   proved successful.
%       Completed the telephone setup in all three sites for pre and post=20
cut over.  Had to re-do this since Lucent had accidentally    deleted the=20
details on the phone as well as removed the features for testing.



Next Month=92s plans:
=B7       Setup intercom network for the switchrooms.
=B7       Complete the "re-verification" all cross connects on SO and=
 repairs=20
that have taken place since January to test for accuracy on jumpers.
=B7       Continue to perform troubles on the existing 5ESS as well as a=20
mirror change on the new 5ESS.
=B7       Meet with volunteers and talk about the implementation and cutover=
=20
plans.
=B7       Continue preparation for adjunct systems (e.g. voice mail ACD,=
 IVR,=20
modem pool, etc)
=B7       Complete the building of the access codes for new remote features=
=20
and begin testing.
=B7       Investigate the setup of the music recorded announcement feature.
=B7       Complete the moving of analog trunks over to new switch and report=
=20
procedure for the night of cut over (2002)
=B7       Continue with test plans (begin testing the existing 5ESS for=20
features, capabilities modifying documentation for accuracy.      Test plan=
=20
to be used on the new 5ESS switch with additional features and higher=20
release of software.
=B7       Continue to work with the volunteers at the test telephone banks=
 to=20
perform the test procedures at least 3 times before cut     is complete.
=B7       Continue tracing all special software configurations, links and=20
other misc. equipment running off of the 5ESS
=B7       Move all trunks over to new DSX panel (off hours required) (night=
=20
of cut over)
=B7       Load all Switch Modules with current database, compare databases=
=20
until cut over
=B7       Perform dumps of new 5ESS OE=92s for new ICE 9 database
=B7       Install TTY and AMIS terminals for cut over
=B7       Discuss the cut over plan and strategy for the different teams=20
working.
=B7       Work with CSR=92s, Operators and the telephone help desk to=
 address=20
any anomalies and create a command center for cut     over.
=B7       Test video after trunks are cutover and verify their abilities to=
=20
hook up.
=B7       CUTOVER to the new 5ESS on 5/24  5/27

Issues:
The biggest challenge this month is the demands outside of this project=20
that are requiring additional time and effort from the 5E Ops team.  All=20
demands are important, but they are taking a toll on the team, especially=20
as we get closer to the 5/24/02.  The team really needs to remain fully=20
focused on the cutover, for it to be successful, especially since we have=20
only a few more weeks.

We had a few technical issues with the recorded announcement module, the=20
ACD equipment, the billing data and some software issues but all have been=
=20
resolved.

We had taken the entire ACD network (N42 Help Desk) off of the old classic=
=20
5ESS and placed them on the new switch.  The transition was smooth and the=
=20
results were excellent.  Again, thank you Mary Ziegler for assisting us in=
=20
doing this.



Team Dynamics:

The 5E team continues to give all they have to provide for a successful cut=
=20
over.  We definitely have a very accomplished team and I'm very proud to=20
work with each member.

The 5ESS Operations team is investigating and finding anomalies with the=20
new 5ESS system (e.g. cable/pair to traces).  MIT is then assisting and=20
providing consultation to Lucent on the resolutions and record modification.

Their efforts, drive, skills, and determination are making this project=20
appear to the outside world as simple though in reality it=92s very=20
complex.  This team is doing an outstanding job which will be visible=20
during the cut over period.


Key Learnings:


I feel very fortunate to be working with the unique individuals that make=20
up 5ESS team.  They, as individuals and as a whole are amazingly clever,=20
ambitious, motivated, and sincere.  They will all be the reason this=20
project is successful.
-Lu

         "Destiny is not a matter of chance, it is a matter of choice; it=20
is not a thing to be waited for, it is a thing to be achieved."
   --William Jennings Bryan

"Success is peace of mind that is a direct result of self-
satisfaction in knowing you gave your best effort to become
the best of which you are capable."
     -John Wooden

"Good humor is tonic for the mind and body. It is the best
antidote for anxiety and depression. It is a business asset.
It attracts and keeps friends. It lightens human burdens. It
is the direct route to serenity and contentment."
--Grenville Kleiser

--=====================_7652119==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<html>
Project Name: 5ESS upgrade and replacement<br>
Project Leader: Lu Keohane<br>
Report Date May 6, 2002<br>
Submitted by: Lu
Keohane<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<font size=3D2>Project Notebook URL:&nbsp;
</font><a href=3D"http://web.mit.edu/is/delivery/5ess/"=
 eudora=3D"autourl"><font size=3D2 color=3D"#0000FF"><u>h</a></font><a=
 href=3D"http://web.mit.edu/is/delivery/5ess/" eudora=3D"autourl"><font=
 face=3D"Arial Narrow, Helvetica"=
 color=3D"#0000FF">ttp://web.mit.edu/is/delivery/5ess/</a><br>
<br>
</font><b>Accomplishments in April:<br>
</u></b><font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;</x-tab></font>Lucent
continues testing the lines on the new equipment.&nbsp; Status of
Lucent=92s testing of the new 5ESS is as follows:<br>
<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><font=
 color=3D"#3366FF"><b><u>ANALOG</u></b></font><font color=3D"#FF0000"><x-tab=
>&nbsp;&nbsp;</x-tab><b><u>Lines
complete</u></b><x-tab>&nbsp;&nbsp;</x-tab><b><u>Lines accurate</u></b>
<x-tab>&nbsp;</x-tab></font><font=
 color=3D"#008000"><b><u>%</u></b></font><font=
 color=3D"#666699"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=
<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>E19=3D<=
x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&=
nbsp;&nbsp;&nbsp;</x-tab>3500<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>3465<x-tab>&nbsp;&nbsp;&nbsp;&nbsp=
;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-t=
ab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">99.0%<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>24=3D<x=
-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;&nbsp;</x-tab>3475<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nb=
sp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>3440<x-tab>&nbsp;&nbsp;&nbsp;=
&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">99.0%<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>NW12=3D=
<x-tab>&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;=
&nbsp;&nbsp;</x-tab>4426<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>4382<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-=
tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&n=
bsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">99.0%<br>
<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>=
<font color=3D"#3366FF"><b><u>ISDN</u></b></font><font color=3D"#FF0000"><x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nb=
sp;&nbsp;&nbsp;</x-tab><b><u>Lines
complete</u></b><x-tab>&nbsp;&nbsp;</x-tab><b><u>Lines accurate</u></b>
<x-tab>&nbsp;</x-tab></font><font=
 color=3D"#008000"><b><u>%</u></b></font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=
<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>E19=3D<x-tab>&nbsp;&nbsp;&=
nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab>3621<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nb=
sp;&nbsp;&nbsp;</x-tab>3584<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nb=
sp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">98.0%<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>24=3D<x=
-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;&nbsp;</x-tab>2742<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nb=
sp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>2714<x-tab>&nbsp;&nbsp;&nbsp;=
&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">99.0%<br>
</font><font=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>NW12=3D=
<x-tab>&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;=
&nbsp;&nbsp;</x-tab>1093<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>1082<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-=
tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&n=
bsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><font=
 color=3D"#008000">99.0%<br>
<br>
</font><font size=3D2 color=3D"#993366">* NOTE:&nbsp; E19=92s SM21 is not be=
ing
verified.&nbsp; This SM2K will become part of the new switch on cut
over.<br>
<br>
<br>
</font><font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nb=
sp;&nbsp;</x-tab></font>Special
circuits continued to be cross wired.&nbsp; Progress is as follows:<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><font color=
=3D"#0000FF">Special
Circuits</font>:<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>431
modem pool lines compete and 100% accurate<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><font color=
=3D"#008080"><b>(100%
complete)</b></font><font color=3D"#008000"><x-tab>&nbsp;</x-tab></font>100
voice mail lines complete and accurate<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;</x-tab>203
misc. modems, alarms, etc to be completed <x-tab>&nbsp;&nbsp;</x-tab>by
4/30/02<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>The
equipment for EXM6 is in place in the =93holding room=94 across from the 24
switch room=85 It is 50% complete.&nbsp; The
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>cabling to the power
plant is complete and the jumpers are being placed in their temporary
positions until after the old
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>equipment is
removed from the 24 switchroom.&nbsp; Our expectations are that this SM
will be 100% complete before cutover <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>and
prepared for the hot slide when we accept the new switch.&nbsp; This
should expedite growth capabilities within 30 days of
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>cutover.<br>
<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>The
5ESS Team continues to randomly validate the cable/pair records and
Lucent=92s frame verification sheets for accuracy
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>on all
three switching frames.&nbsp; We are running close to 98% accurate (of
the things we can know)=85 The cutover could
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>result in unexpected service
outages.&nbsp; We are trying to pro actively remove all known obstacles
and have a plan in place for <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>the
unplanned should they occur..<br>
<br>
<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>The
validity checks on the MDF=92s vs. the ICE 9 database:
<dl>
<dl><font face=3D"Courier New, Courier">
<dd>o<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>NW12
is 100% up-to-date and as accurate as the
database<font face=3D"Courier New, Courier">
<dd>o<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>24
is 98% up-to-date and as accurate as the
database<font face=3D"Courier New, Courier">
<dd>o<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>E19
is 96% complete and accurate.&nbsp; MIT found all inaccuracies and
presented a running list to Lucent.&nbsp; MIT performed tracing and
spreadsheets for Lucent.&nbsp; These spreadsheets assisted Lucent in
becoming closer to 100% accurate in all 3 switch sites.&nbsp; The running
sheets are analyzed daily by Steve Morris and updated into ICE 9 by
Annette Smith.&nbsp; Thank you Steve for being so meticulous and focused
and assisting Lucent with this process (we would not be 100%
otherwise).&nbsp; Thanks to Annette we have had ICE 9 updated faster then
Lucent performed all of these changes=85 Thanks!
<dd>&nbsp;
</dl><font face=3D"ZapfDingbats">
<dd>%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Continu=
e
to update cable and pairs found within frame verification and day-to-day
repair changes.&nbsp; (Approximately 5 - 10 cable/pair changes per=20
day).
</dl><font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp=
;&nbsp;</x-tab></font>Continue
to trace anomalies and update spreadsheets and databases (ongoing until
cutover)<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Continue
to oversee all telephone moves, adds, changes and trouble tickets.&nbsp;
Mapping and updating the 5E database
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>with cable and pair
changes in chronological order (for a more accurate database at cut
over).&nbsp;&nbsp; Lucent has caught up to the
<x-tab>&nbsp;&nbsp;&nbsp;</x-tab>daily MAC=92s and the database is now in
sync and service orders will not be written during the =93freeze=94 period
(starting
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Friday,
May 10, 2002).<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Established
visibility with our Remote monitoring maintenance center (they are
currently watching both switches.<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab></font>Recorded
all announcement (e.g the number you dial at MIT is not in service), on
the&nbsp; 5ESS and loaded them into the
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>16RA.&nbsp; Precut testing of
these recordings went well.<br>
<font face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab>
</font>Continue testing ICE 9=92s new database and prepare for cut over.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>ISDN conversion from the E19 switch room continues.&nbsp; This=
 work is service affecting therefore 3-down is updated daily and=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>most of the work takes=
 place after hours. The remaining testing on ISDN is troubleshooting known=
 anomalies.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>The testing of ICE 9 continues as modifications of the ICE 9=
 code are changed.&nbsp; Newest issue is LCC change updates all=
 <x-tab>&nbsp;</x-tab>records and reassigns all current equipment on the=
 5ESS.&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Worked on the billing issues in which we dumped the calling data=
 from the new switch (after dialing all types of calls).&nbsp; The=
 <x-tab>&nbsp;&nbsp;</x-tab>old switch used 9mm tapes and the new switch=
 uses dat tapes.&nbsp; We were successful in having the data loaded onto the=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>dat tape, but reading it was=
 impossible (aside from the headings).&nbsp; Worked with Lucent and resolved=
 this issue on 5/10/02.&nbsp;&nbsp; <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>thank=
 you mad dog Cyr for staying on Lucent with this and Jana for doing all=
 possible testing of the dat tape here and at=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>W91.&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>The ACD was removed from the Classic 5ESS system and installed=
 on the new 5ESS (after hours) and although this took=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>two nights on troubleshooting, the=
 test work successfully.&nbsp; Thank you Mary Ziegler and your team for=
 making this test <x-tab>&nbsp;&nbsp;</x-tab>possible and for assisting us=
 in the testing.&nbsp;&nbsp;&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Clean-up of ISDN lines continues.&nbsp; Some old Multiline hunt=
 groups have been found and removed.&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Testing of analog is almost complete (all old services are=
 complete and MAC=92s are very close to being complete).&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>The Plan for U-A to U-B conversion for NW12 and 24 are being=
 shared with the appropriate customers.&nbsp; Most of this work=
 <x-tab>&nbsp;</x-tab>can start on Friday 5/24 but will not be completed=
 until Saturday 5/25.&nbsp; Steve, Collin and Dave will be completing this=
 work <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>on cutover weekend.&nbsp; <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Tina Sands had obtained all the necessary equipment and=
 preparations needed for this cutover (e.g. spare cell phones,=
 <x-tab>&nbsp;&nbsp;</x-tab>walkie-talkies, food, NT1=92s,=
 etc=85).&nbsp;&nbsp; Thank you Tina for an outstanding job.&nbsp; Working=
 with you is a pleasure.&nbsp; It is nice to=
 <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>have someone who is thorough, skillful and=
 competent.&nbsp; Thank you.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Nate has completed a document detailing the =93MAC=92s=
 moratorium=94 and it has been distributed.&nbsp; All feedback to date from=
 <x-tab>&nbsp;</x-tab>customers have been positive.&nbsp; They are=
 appreciative of the details surrounding the moratorium as well as getting=
 this <x-tab>&nbsp;</x-tab>information in a timely manner. <br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Notification has been updated and distributed via Tech Talk, IS=
 Newsletter, Spotlight and the website.&nbsp; Thank you Robyn=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Fizz and Lee=
 Ridgeway.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Notification to our vendors has begun.&nbsp; AT&amp;T, Qwest,=
 PaeTec are aware of the cutover, Verizon is still being worked on.&nbsp;=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>We will also=
 notify customers running from PBX=92s and/or our Tie line connections=
 before 5/24/02.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Setup a procedure for =93help=94 calls to be completed before=
 cutover and also to have data modifications completed in all=
 <x-tab>&nbsp;</x-tab>databases.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Testing of new features is being completed.&nbsp; Joni will work=
 with the volunteer crew to orient them with the lengthy testing=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>procedure (we will test features,=
 routing, call restrictions, voice mail, ACD, operator services, just to=
 name a few). This <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>should provide a=
 more efficient feature testing on 5/25/02.<br>
<font=
 face=3D"ZapfDingbats">%</font><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;</x-tab>Plans to work the Memorial Day weekend have been=
 established.&nbsp;&nbsp; The command Center has been setup and the TL will=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>provide process and=
 strategy with volunteers for that weekend (5/16/02).&nbsp;&nbsp;&nbsp;=
 Campus Police and Medical have been=
 supplied<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab> 3=
 cell phones each incase of an emergency.&nbsp; We have them set up in a=
 critical path and do not expect problems.&nbsp; If there=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>are problems, we will=
 know before they will and will be on site immediately.<br>
<br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;&nbsp;&nbsp;</x-tab><b><u>CUTOVER<br>
</u></b><font=
 face=3D"Symbol"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-=
tab>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Print=
 out office records of classic 5ESS (snap shot)&nbsp; doing for one full=
 week before cutover and during the=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp=
;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;=
&nbsp;</x-tab>day on the 24<font size=3D1><sup>th</sup></font>.<br>
<font=
 face=3D"Symbol"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-=
tab>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Setup=
 off campus audio bridge to regroup and discuss any outstanding=
 issues.&nbsp; This call will include, 5ESS=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp=
;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>engineers, specialists, the installation=
 team, the Implementation, software experts, and the MIT team.<br>
<font face=3D"Symbol"=
 color=3D"#FF0000"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</=
x-tab><br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=B7<x-tab>&nb=
sp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font><b>Cut over begins at=
 6pm&nbsp; and is expected to be complete with phase one at 1a.m. </b>
<ul><font face=3D"Courier New, Courier">
<li>&nbsp;T</font>ransfer all telephone services from old to new switch;=
 bring new switch on line, accept phase one process and bring the=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>old off line (the=
 database will be available if information is needed).
<li>Bring the new ICE 9 database on line. Test, write TT &amp; SO=92s.
<li>All current ISDN users on the classic 5ESS have to have their cards=
 physically receded.&nbsp; Scripts have been written for the night of=
 cutover to shut off the shelves these cards sit on.&nbsp; If the software=
 modifications don't fix this bug, then we will need to recede all equipment=
 served by the ISLU in all three switch locations.&nbsp; We are writing up a=
 procedure to perform this efficiently and effectively.=20
<li>Saturday 8am through Tuesday at 6am=20
</ul><font=
 face=3D"Wingdings"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<=
/x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Managing the=
 help desk and providing records from ICE 9 for corrections<font=
 face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Testing of all new and old features=
 <br>
<font=
 face=3D"Wingdings"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<=
/x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Testing the=
 routing from all three switch rooms<font face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Performing Operator functions=
 (testing of switchboards, features, IVR, Audio Conference bridge,=
 etc.)<font face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Tracing and Re-cross wiring cable=
 and pairs<font face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Changing old U-A cards in the=
 center of Campus with U-B cards<font face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Updating the community via 3-down=
 and emails<br>
<font=
 face=3D"Wingdings"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<=
/x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Testing Voice=
 mail, ACD, Modem pool, video conferencing, etc. <br>
<font=
 face=3D"Wingdings"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<=
/x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Troubleshooting=
 in all areas (power, cable, oe assignments, ICE-9, etc.)<font=
 face=3D"Wingdings"> <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-tab>&nbsp;&nbsp;&nbs=
p;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Testing Recorded=
 announcements,&nbsp; Audio bridge, <br>
<font=
 face=3D"Wingdings"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<=
/x-tab><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>=A7<x-=
tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Etc.&nbsp; An=
 implementation plan will be documented prior to cut over.<br>
<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Our 5ESS Database is approximately 99% built and being verified=
 (e.g. NNX=92s, OE=92s, TN=92s, Trunks,=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Routing,=
 etc.).<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Meet with Lucent every Thursday in E19-732 and some Lucent=
 employees via a conference call.<br>
<font=
 face=3D"ZapfDingbats">%</font><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;</x-tab>Meeting with Lucent Management one Wednesday a month or as=
 needed.<br>
<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Providing Lucent with information that is needed for the new=
 5ESS (e.g. software=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>releases, bmw=92s,=
 etc.)<br>
<br>
<font=
 face=3D"ZapfDingbats">%</font><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&n=
bsp;</x-tab>Resolving any issues that arise during this project.&nbsp;=
 Directing Lucent through the modifications (most recent is creating a=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>script that will assist us the night=
 of cutover and save us hours of work).&nbsp; Thank you Artie for writing a=
 procedure for our <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>maintenance folks and=
 for staying focused on resolving this issue with Lucent).<br>
<font=
 face=3D"ZapfDingbats"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbs=
p;</x-tab><br>
%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Amis=
 terminals installed in E19, additional terminals are forthcoming for E19,=
 24 and NW12. Tested ok.<br>
<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Consulted VDIST on the wiring frame for the location of the=
 demarc for the new dorms (in the NW12 switch room).&nbsp;=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Providing the=
 installation of the MDF equipment that is needed to extend the frame.&nbsp;=
 We will also have this complete before=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>5/21/02.<br>
<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Testing was completed off-hours on the integration equipment (3A=
 Translator) to the VMail System.&nbsp; This test required=
 <x-tab>&nbsp;&nbsp;</x-tab>hardware modifications which made the=
 =93integration=94 of <x-tab>&nbsp;</x-tab>the voice mail inoperable for=
 under an hour however, the test <x-tab>&nbsp;&nbsp;</x-tab>proved=
 successful.<br>
<font=
 face=3D"ZapfDingbats">%<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x=
-tab></font>Completed the telephone setup in all three sites for pre and=
 post cut over.&nbsp; Had to re-do this since Lucent had accidentally=
 <x-tab>&nbsp;&nbsp;&nbsp;</x-tab>deleted the details on the phone as well=
 as removed the features for testing.<br>
<br>
&nbsp;<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<br>
<b><u>Next Month=92s plans:<br>
</u></b>
<dl><font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Setup=
 intercom network for the switchrooms.<font face=3D"Symbol">
<dd>=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Compl=
ete the &quot;re-verification&quot; all cross connects on SO and repairs=
 that have taken place since January to test for accuracy on jumpers.=20
</dl><font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue to perform troubles on the existing 5ESS as well as a=
 mirror change on the new 5ESS.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Meet with volunteers and talk about the implementation and cutover=
 plans.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue preparation for adjunct systems (e.g. voice mail ACD, IVR,=
 modem pool, etc) <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Complete the building of the access codes for new remote features=
 and begin testing.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Investigate the setup of the music recorded announcement=
 feature.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Complete the moving of analog trunks over to new switch and report=
 procedure for the night of cut over (2002) <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue with test plans (begin testing the existing 5ESS for=
 features, capabilities modifying documentation for accuracy.&nbsp;=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Test plan to be used on the new 5ESS=
 switch with additional features and higher release of software. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue to work with the volunteers at the test telephone banks to=
 perform the test procedures at least 3 times before cut=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>is complete.=
 <x-tab>&nbsp;&nbsp;&nbsp;</x-tab><br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue tracing all special software configurations, links and=
 other misc. equipment running off of the 5ESS <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Move all trunks over to new DSX panel (off hours required) (night of=
 cut over) <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Load all Switch Modules with current database, compare databases=
 until cut over <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Perform dumps of new 5ESS OE=92s for new ICE 9 database <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Install TTY and AMIS terminals for cut over <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Discuss the cut over plan and strategy for the different teams=
 working. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Work with CSR=92s, Operators and the telephone help desk to address=
 any anomalies and create a command center for cut=
 <x-tab>&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>over. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Test video after trunks are cutover and verify their abilities to=
 hook up.<br>
<font face=3D"Symbol"=
 color=3D"#FF0000">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-t=
ab></font><b>CUTOVER to the new 5ESS on 5/24&nbsp; 5/27<br>
<br>
<u>Issues:<br>
</u></b>
<dl>
<dd>The biggest challenge this month is the demands outside of this project=
 that are requiring additional time and effort from the 5E Ops team.&nbsp;=
 All demands are important, but they are taking a toll on the team,=
 especially as we get closer to the 5/24/02.&nbsp; The team really needs to=
 remain fully focused on the cutover, for it to be successful, especially=
 since we have only a few more weeks.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <br>
<br>

<dd>We had a few technical issues with the recorded announcement module, the=
 ACD equipment, the billing data and some software issues but all have been=
 resolved. <br>
<br>

<dd>We had taken the entire ACD network (N42 Help Desk) off of the old=
 classic 5ESS and placed them on the new switch.&nbsp; The transition was=
 smooth and the results were excellent.&nbsp; Again, thank you Mary Ziegler=
 for assisting us in doing this.<br>
<br>
<br>
<br>

</dl><b><u>Team Dynamics:</u> <br>
<br>
</b>The 5E team continues to give all they have to provide for a successful=
 cut over.&nbsp; We definitely have a very accomplished team and I'm very=
 proud to work with each member.<br>
<br>
The 5ESS Operations team is investigating and finding anomalies with the new=
 5ESS system (e.g. cable/pair to traces).&nbsp; MIT is then assisting and=
 providing consultation to Lucent on the resolutions and record=
 modification.&nbsp; <br>
<br>
Their efforts, drive, skills, and determination are making this project=
 appear to the outside world as simple though in reality it=92s very=
 complex.&nbsp; This team is doing an outstanding job which will be visible=
 during the cut over period.
<dl>
<dd>&nbsp; <br>
<br>

</dl><b><u>Key Learnings:<br>
</u></b>
<dl>
<dd><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<br>

<dd>I feel very fortunate to be working with the unique individuals that=
 make up 5ESS team.&nbsp; They, as individuals and as a whole are amazingly=
 clever, ambitious, motivated, and sincere.&nbsp; They will all be the=
 reason this project is successful.=20
<dd>-Lu<br>
<br>

</dl><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>&quot;De=
stiny is not a matter of chance, it is a matter of choice; it is not a thing=
 to be waited for, it is a thing to be achieved.&quot;
<dl>
<dd>&nbsp; --William Jennings Bryan<br>
<br>

<dd>&quot;Success is peace of mind that is a direct result of self-=20
<dd>satisfaction in knowing you gave your best effort to become=20
<dd>the best of which you are capable.&quot;=20
<dd>&nbsp;&nbsp;&nbsp; -John Wooden<br>
<br>

<dd>&quot;Good humor is tonic for the mind and body. It is the best=20
<dd>antidote for anxiety and depression. It is a business asset.=20
<dd>It attracts and keeps friends. It lightens human burdens. It=20
<dd>is the direct route to serenity and contentment.&quot;=20
<dd>--Grenville Kleiser
</dl></html>