Hi,

After talking to database services this afternoon, here is what I 
believe to be the current status and some concerns:

1.  Oracle on team-usa is installed at release 7.1.6, some post
    processing needs to be done.  Issues on space planning still
    exist.
 
2.  After the Help Desk Tuesday testing, we will make a decision on
    exporting/importing the test/development database to production.

    Possible timeframe is Thursday or Friday this week.  Will make
    decision on Wednesday.

3.  Wade will send the Scopus account script to database services
    for evaluation.  It's possible that we may need to give
    "create" privs to an existing account with less access than currently
    used on the test database.

4.  Still need to tar the /u1/scopus files and move them to production.
    Is this o&s-facmgt responsibility or wade?

5.  Need to generate a backup of the test database prior to the 
    export/import.  I presume this has been happening, but we need to
    be sure before proceeding.

6.  Generate a scopus userid on the production machine.  I can give
    further specifics on access.

7.  After creating an initial production environment (scopus running on
    Solaris 2.5 with Oracle 7.1.6 and sufficient testing on this
    machine), we will then install SNS.  This ensures fewer variables
    prior to an initial testing.