Bldg. 18 - 5/10 PM - 11 AM - Approved Building Electrical Power S

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 8 09:56:42 2001

Message-ID: <82F0D564C5ADD31180EF00508B556451BD23D4@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'jcollins@mit.edu'" <jcollins@mit.edu>,
        Paul Stordy
	 <PStordy@PLANT.MIT.EDU>,
        James Sullivan <jsulliva@PLANT.MIT.EDU>,
        Manuel Moreira <mmoreira@PLANT.MIT.EDU>,
        "'mmahoney@mit.edu'"
	 <mmahoney@mit.edu>,
        "'opsnote@mit.edu'" <opsnote@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        Billy Homeyer
	 <whomeyer@PLANT.MIT.EDU>,
        "'safety@mit.edu'" <safety@mit.edu>,
        Howard  Harrison <HHarriso@PLANT.MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        Cust-Coach
	 <cust-coach@mit.edu>, A-Zone <A-Zone@mit.edu>,
        "'rjwilk@mit.edu'"
	 <rjwilk@mit.edu>
Date: Tue, 8 May 2001 09:56:34 -0400 
MIME-Version: 1.0
Content-Type: text/plain

> To: 	jcollins@mit.edu; Paul Stordy; James Sullivan; Manuel Moreira;
> mmahoney@mit.edu; opsnote@mit.edu; shutdowns@mit.edu; Billy Homeyer;
> safety@mit.edu; Howard  Harrison
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Cust-Coach; A-Zone;
> rjwilk@mit.edu
> Subject: 	Bldg. 18 - 5/10 PM - 11 AM - Approved Building Electrical
> Power Shutdown
> 
> 
The following approved building electrical power shutdown for Bldg. 18 on
Thursday, 5/10 PM to Friday, 5/11 AM is for your information.

Thank you,

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: 18
> Date: 5/10/2001
> Day: Thursday
> Time: 6 PM (5/10) - 6 AM (5/11)
> System: Building Electrical Power
> Duration: 12 hours
> Reason: 
> To install the remainder of the new sub-station.
> 
> Effect: 
> Loss of Power: access controls; building power, elevators, computers,
> telephones, lighting/corridors/stairs;  Water:  chilled water (air
> conditioning), condenser water, pure water, hot domestic, hot lab process,
> heating hot water,  cold domestic, cold  lab process and de-ionized water;
> Air:  supply ventilation (air from outside), supply cooling, supply
> heating, exhaust-laboratory, exhaust-general, exhaust-toilet, compressed
> control, compressed lab air and lab vacuum air;  Steam:  high, medium and
> low pressure as well as condensate return;  Other: fire alarm, fire
> protection water, natural gas (affects boiler room & heat), bunsen
> burners, odors, smoke detectors and exhaust hood (exhaust-laboratory air)
> during the 12-hour shutdown period.  The Safety Office has been advised of
> this - they will notify the Fire Department.  
> 
> 