[54930] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. E19 - 6th and 7th floors - 5/8 - Emergency Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 8 10:06:53 2001

Message-ID: <82F0D564C5ADD31180EF00508B556451BD23D5@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'cschultz@mit.edu'" <cschultz@mit.edu>,
        "'dcairns@mit.edu'"
	 <dcairns@mit.edu>,
        "'dlking@mit.edu'" <dlking@mit.edu>, "'dshea@mit.edu'" <dshea@mit.edu>,
        "'dturn@mit.edu'" <dturn@mit.edu>, E-Zone <E-Zone@mit.edu>,
        "'e19site@mit.edu'" <e19site@mit.edu>,
        "'elsagt@mit.edu'" <elsagt@mit.edu>, "'esico@mit.edu'" <esico@mit.edu>,
        "'hallisey@mit.edu'" <hallisey@mit.edu>,
        "'honiker@mit.edu'"
	 <honiker@mit.edu>,
        "'joconor@mit.edu'" <joconor@mit.edu>,
        "'kelley@mit.edu'" <kelley@mit.edu>,
        "'kshooter@mit.edu'"
	 <kshooter@mit.edu>,
        "'lambert@mit.edu'" <lambert@mit.edu>,
        "'mbowers@mit.edu'" <mbowers@mit.edu>,
        Michael Sherman
	 <MSherman@PLANT.MIT.EDU>,
        "'narbonne@MIT.EDU'" <narbonne@mit.edu>,
        "'opsnote@mit.edu'" <opsnote@mit.edu>,
        "'rberlin@mit.edu'"
	 <rberlin@mit.edu>,
        "'safety@mit.edu'" <safety@mit.edu>,
        "'sfalconi@mit.edu'" <sfalconi@mit.edu>,
        "'tdalton@mit.edu'"
	 <tdalton@mit.edu>,
        "'tmeehan@mit.edu'" <tmeehan@mit.edu>,
        "'wbarrett@mit.edu'" <wbarrett@mit.edu>,
        "'wganger@mit.edu'"
	 <wganger@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        "'jis@mit.edu'"
	 <jis@mit.edu>
Date: Tue, 8 May 2001 10:06:46 -0400 
MIME-Version: 1.0
Content-Type: text/plain

> To: 	cschultz@mit.edu; dcairns@mit.edu; dlking@mit.edu; dshea@mit.edu;
> dturn@mit.edu; E-Zone; e19site@mit.edu; elsagt@mit.edu; esico@mit.edu;
> hallisey@mit.edu; honiker@mit.edu; joconor@mit.edu; kelley@mit.edu;
> kshooter@mit.edu; lambert@mit.edu; mbowers@mit.edu; Michael Sherman;
> narbonne@MIT.EDU; opsnote@mit.edu; rberlin@mit.edu; safety@mit.edu;
> sfalconi@mit.edu; tdalton@mit.edu; tmeehan@mit.edu; wbarrett@mit.edu;
> wganger@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; jis@mit.edu
> Subject: 	Bldg. E19 - 6th and 7th floors - 5/8 - Emergency Shutdown
> 
> 
The following Emergency shutdown for Bldg. E19 - 6th and 7th floors on
Tuesday, 5/8 is for your information.

Thank you,

Andrea Nichols
Operations Center
8-7872

> Status: Emergency
> Building: E19 - 6th and 7th floors
> Date: 5/8/2001
> Day: Tuesday
> Time: 12 PM - 1 PM
> System: Air Handler 7-1
> Duration: 3 minutes within time frame above
> Reason: 
> Sometime between 12 PM and 1 PM, Supply Fan AH7-1 will be off for 3
> minutes to meet IT needs.
> 
> Effect: 
> Loss of supply ventilation (air from outside), supply cooling and supply
> heating in E19 - 6th and 7th floors for 3-minute shutdown period.
> 
> 

home help back first fref pref prev next nref lref last post