[24549] in Hotline Meeting
[VP] Power shutdown
daemon@ATHENA.MIT.EDU (jjmorey@MIT.EDU)
Fri Sep 30 15:25:04 1994
From: jjmorey@MIT.EDU
To: shutdowns@MIT.EDU
Date: Fri, 30 Sep 1994 15:24:56 EDT
------- Forwarded Message
Received: from MIT.MIT.EDU by po8.MIT.EDU (5.61/4.7) id AA28521; Fri, 30 Sep 94 14:27:55 EDT
Received: from TCM-MAC-21.MIT.EDU by MIT.EDU with SMTP
id AA29949; Fri, 30 Sep 94 14:27:47 EDT
Message-Id: <9409301827.AA29949@MIT.EDU>
Date: Fri, 30 Sep 94 14:36:33
From: dmprevit@MIT.EDU (Donna M. Previte)
To: opsnote@MIT.EDU, telecom-duty@MIT.EDU, nethelp@MIT.EDU
Subject: Shutdown Request
Cc: 5help@MIT.EDU, mtobin%mitppl@mitvma.mit.edu
The following notice has been received today from Physical Plant:
EMERGENCY ELECTRICAL POWER
Date: Monday, Oct.3
Time: 7:00AM - 8:00AM
Location: Bldg. 66
Reason for shutdown: New 2400 volt emergency cable - Ames St. duct
problem.
NOTE: Any equipment on emergency electrical power only will be
affected. Wire closets located in this area - 66-151T, 66-251T,
66-451T.
Donna Previte
Telecom Repair Help Desk
------- End of Forwarded Message