[171606] in Hotline Meeting
NEED APPROVAL - EXTENDED: Approved: Bldg. 1- All Fire Alarm
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Aug 20 08:16:52 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "mbuehler@MIT.EDU" <mbuehler@MIT.EDU>,
"patdixon@mit.edu"
<patdixon@MIT.EDU>,
"jgermain@mit.edu" <jgermain@MIT.EDU>,
"ghavidel@MIT.EDU"
<ghavidel@MIT.EDU>,
"savicki@mit.edu" <savicki@MIT.EDU>,
"OPS RM Campus
Services Main" <rm-mcs@MIT.EDU>,
"sbghosh@MIT.EDU" <sbghosh@MIT.EDU>, "fenner@mit.edu" <fenner@MIT.EDU>,
MIT Schedules Office <schedules@MIT.EDU>,
"shutdowns@mit.edu" <shutdowns@MIT.EDU>,
"whomeyer@mit.edu"
<whomeyer@MIT.EDU>,
"ksemerj@mit.edu" <ksemerj@MIT.EDU>,
Ops RM Shutdown
<rm-shutdown@MIT.EDU>,
Ops RM Shutdown <rm-shutdown@MIT.EDU>
CC: "jennygar@mit.edu" <jennygar@MIT.EDU>, "healyb@mit.edu" <healyb@MIT.EDU>
Date: Tue, 20 Aug 2013 08:16:47 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C7DD1D54@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D54dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D54dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following EXTENDED Fire Alarm Shutdown/3rd Party Live Audible Testing i=
s for bldg. 1 - All on Sunday, August 4, 2013 at 11:00pm til Friday, August=
9, 2013/ *EXTENDED to include from Tuesday, August 20 - Friday, August 23,=
2013 - then Sunday, August 23, 2013 - Tuesday, August 27, 2013* 11:00pm t=
il 7:00am is for your information and approval. Any questions please contac=
t Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 4, 2013
Day: Sunday<
Time: 11:00pm (Sun) - 7:00am (Fri)
Building(s): 1
Room(s): All
System: Fire Alarm
Duration: 11:00pm (Sun) - 7:00am (Fri)
Reason:
*EXTENDED AGAIN: We would like to extend the bldg 1-all fire alarm shutdown=
s from 11 PM to 7 AM starting on Tuesday evening, August 20th through Thurs=
day evening August 22nd (into Friday morning) and Sunday evening, August 25=
th through Monday evening August 26th, 2013 (into Tuesday morning) to fix =
punch list items and to complete and conduct *3rd party live audible testin=
g of the bldg 1 fire alarm system* by DEI (Phil Deneault 508-341-4184) as p=
art of the bldg 1 life-safety fire alarm upgrade project by Tishman Constru=
ction (Dennis Ryan 617-594-0664). Both the shutdown request form and work =
order #5204362 have been modified to reflect this extension on behalf of Bi=
lly Homeyer.
**EXTENDED - We would like to extend the bldg 1-all fire alarm shutdowns fr=
om 11 PM to 7 AM to include Sunday evening, August 11th through Thursday, A=
ugust 15th, 2013 (into Friday morning) to conduct *3rd party live audible t=
esting of the bldg 1 fire alarm system* and to be witnessed by DEI (Phil De=
neault 508-341-4184) as part of the bldg 1 life-safety fire alarm upgrade p=
roject by Tishman Construction (Dennis Ryan 617-594-0664). Both the shutdo=
wn request form and work order #5204362 have been modified to reflect this =
extension.
We request bldg 1-all fire alarm shutdowns from 11 PM to 7 AM on Sunday eve=
ning, August 4th through Thursday, August 8th, 2013 (into Friday morning) t=
o conduct *3rd party live audible testing of the bldg 1 fire alarm system* =
and to be witnessed by DEI Systems (Phil Deneault 508-341-4184) as part of =
the bldg 1 life-safety fire alarm upgrade project by Tishman Construction (=
Dennis Ryan 617-594-0664). Brian Healy 8-8565 is the MIT project manager on=
behalf of Billy Homeyer.
Effect:
Loss of fire alarms for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D54dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following<font color=3D"#1F497D"> </font><b>EXTENDED</b> Fire Alar=
m Shutdown/3rd Party Live Audible Testing is for bldg. 1 - All on Sunday, A=
ugust 4, 2013 at 11:00pm til Friday, August 9, 2013/ *EXTENDED to include f=
rom<font color=3D"#1F497D"> Tuesday,
August 20 - Friday, August 23, 2013 - then Sunday, August 23, 2013 - Tuesda=
y, August 27, 2013*</font><font color=3D"#1F497D"> </font> 11:00pm til 7:00=
am is for your information<font color=3D"#1F497D"> and approval</font>. Any=
questions please contact Billy Homeyer
x8-0432.</div>
<div><font color=3D"#1F497D"> </font></div>
<div><font face=3D"Calibri, sans-serif" size=3D"3" color=3D"#1F497D"><b>Wou=
ld you please let us know if this does or does not have your approval.</b><=
/font></div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 4, 2013</div>
<div>Day: Sunday<</div>
<div>Time: 11:00pm (Sun) - 7:00am (Fri)</div>
<div>Building(s): 1</div>
<div>Room(s): All</div>
<div>System: Fire Alarm</div>
<div>Duration: 11:00pm (Sun) - 7:00am (Fri)</div>
<div>Reason: </div>
<div><font color=3D"#1F497D"> </font></div>
<div><font face=3D"Calibri, sans-serif" color=3D"#1F497D">*EXTENDED AGAIN: =
<font face=3D"Calibri, sans-serif">We would like to extend the bldg 1-all f=
ire alarm shutdowns from </font><font face=3D"Calibri, sans-serif"><u><b>11=
PM to 7 AM</b></u></font><font face=3D"Calibri, sans-serif"><b>
starting on Tuesday evening, August 20</b></font><font face=3D"Calibri, san=
s-serif" size=3D"1"><sup><b>th</b></sup></font><font face=3D"Calibri, sans-=
serif"><b> through Thursday evening August 22nd (into Friday morning)</b></=
font><font face=3D"Calibri, sans-serif">
and </font><font face=3D"Calibri, sans-serif"><b>Sunday evening, August 25<=
/b></font><font face=3D"Calibri, sans-serif" size=3D"1"><sup><b>th</b></sup=
></font><font face=3D"Calibri, sans-serif"><b> through Monday evening=
August 26</b></font><font face=3D"Calibri, sans-serif" size=3D"1"><sup><b>=
th</b></sup></font><font face=3D"Calibri, sans-serif"><b>,
2013 (into Tuesday morning) </b></font><font face=3D"Calibri, sans-serif">t=
o fix punch list items and to complete and conduct *</font><font face=3D"Ca=
libri, sans-serif"><b>3</b></font><font face=3D"Calibri, sans-serif" size=
=3D"1"><sup><b>rd</b></sup></font><font face=3D"Calibri, sans-serif"><b>
party live audible testing of the bldg 1 fire alarm system</b></font><font =
face=3D"Calibri, sans-serif">* by DEI (Phil Deneault 508-341-4184) as part =
of the bldg 1 life-safety fire alarm upgrade project by Tishman Constructio=
n (Dennis Ryan 617-594-0664). Both
the shutdown request form and work order #5204362 have been modified to ref=
lect this extension on behalf of Billy Homeyer.</font></font></div>
<div><font color=3D"#1F497D"> </font></div>
<div> </div>
<div>**<b>EXTENDED - We would like to extend the bldg 1-all fire alarm shut=
downs from 11 PM to 7 AM to include Sunday evening, August 11th through Thu=
rsday, August 15th, 2013 (into Friday morning) to conduct *3rd party live a=
udible testing of the bldg 1 fire
alarm system* and to be witnessed by DEI (Phil Deneault 508-341-4184) as pa=
rt of the bldg 1 life-safety fire alarm upgrade project by Tishman Construc=
tion (Dennis Ryan 617-594-0664). Both the shutdown request form and w=
ork order #5204362 have been modified
to reflect this extension.</b></div>
<div> </div>
<div> </div>
<div>We request bldg 1-all fire alarm shutdowns from 11 PM to 7 AM on Sunda=
y evening, August 4th through Thursday, August 8th, 2013 (into Friday morni=
ng) to conduct *3rd party live audible testing of the bldg 1 fire alarm sys=
tem* and to be witnessed by DEI
Systems (Phil Deneault 508-341-4184) as part of the bldg 1 life-safety fire=
alarm upgrade project by Tishman Construction (Dennis Ryan 617-594-0664). =
Brian Healy 8-8565 is the MIT project manager on behalf of Billy Homeyer.</=
div>
<div> </div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown.</div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D54dofexchmbx01f_--