[171607] in Hotline Meeting
EXTENDED: Bldg. E25-6th fl. Fire Alarm Shutdown (*live audible
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Tue Aug 20 08:31:12 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
"macdonaj@mit.edu" <macdonaj@mit.edu>,
"craigp@MIT.EDU" <craigp@mit.edu>,
"OPS RM Campus Services East" <rm-ecs@mit.edu>,
Ops Custodial Admin & Support
Staff <cust-staff@mit.edu>,
"bengel@mit.edu" <bengel@mit.edu>, "rdfadel@MIT.EDU" <rdfadel@mit.edu>,
"tquinn@mit.edu" <tquinn@mit.edu>, "ninadm@mit.edu" <ninadm@mit.edu>,
Michael Smith <masmith@mit.edu>, "brig@med.mit.edu" <brig@med.mit.edu>,
MIT Schedules Office
<schedules@mit.edu>,
"scottide@MIT.EDU" <scottide@mit.edu>,
"heatherg@mit.edu" <heatherg@mit.edu>,
"shutdowns@mit.edu"
<shutdowns@mit.edu>,
"whomeyer@mit.edu" <whomeyer@mit.edu>,
"ksemerj@mit.edu"
<ksemerj@mit.edu>,
Steven Gilligan <sgilliga@plant.mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "biss@mit.edu" <biss@mit.edu>
Date: Tue, 20 Aug 2013 08:31:06 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C7DD1D87@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D87dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D87dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following Extended Fire Alarm Shutdown (*live audible testing on 8/7 an=
d 8/8) is for bldg. E25- 6th fl on Wednesday, August 7, 2013 til Thursday, =
August 8, 2013/ EXTENDED to include Wednesday, August 21, 20132 from 6:00a=
m til 7:30am to conduct *live audible 3rd party test of the new E25 - 6th f=
l fir ealarm system*. Any questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 7, 2013//EXTENDED to include Wednesday, August 21, 2013
Day: Wednesday
Time: 6:00am - 7:30am
Building(s): E25
Room(s): 6th fl.
System: fire alarm
Duration: 6:00am - 7:30am
Reason:
**EXTENDED: We would like to extend the E25-all fire alarm shutdown from 6 =
AM to 7:30 AM on Wednesday, August 21st, 2013 for JMBCo (Wayne Maginnis 617=
-212-2059/Rich Cucchi 617-522-6800) to complete tie-in, programming and tes=
ting the new speaker/strobes and exhaust fan HOA switches; and we will cond=
uct a *live audible 3rd party test of the new E25-6th floor fire alarm syst=
em* as part of the Prof. McGee lab cleanroom renovation project by DC Beane=
(Ryan Kucinski 617-997-9498). Both the shutdown request form and work ord=
er #5206749 have been modified to reflect this extension on behalf of Billy=
Homeyer.**
We request bldg E25-6th floor fire alarm shutdowns as follows;from 6 AM to =
2 PM on Wednesday, August 7th, 2013, Simplex (Rich Perron 781-603-7799) wil=
l program HOA switches for the new exhaust fans and from 6 AM to 7:30 AM, w=
e will conduct a *live audible 1st party test of the new E25-6th floor fire=
alarm devices*. On Thursday, August 8th, 2013 from 6 AM to 7:30 AM, JMB=
Co (Rich Cucchi 617-522-6800) will conduct a *live audible 3rd party test o=
f the E25-6th floor fire alarm system* as part of the Prof. McGee lab clean=
room renovation project by DC Beane (Ryan Kucinski 617-997-9498). Biss Tee=
lucksingh 2-5972 and Paul Murphy 4-6361 are the MIT project managers on beh=
alf of Billy Homeyer.
Effect:
Loss of fire alarms for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D87dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <b>Extended </b>Fire Alarm Shutdown (*live audible testi=
ng on 8/7 and 8/8) is for bldg. E25- 6th fl on Wednesday, August 7, 2013 ti=
l Thursday, August 8, 2013/ <b>EXTENDED to include Wednesday, August =
21, 20132 </b><b>from 6:00am til 7:30am</b><b>
to conduct *live audible 3rd party test of the new E25 - 6th fl fir ealarm =
system</b>*. Any questions please contact Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div>Would you please let us know if this does or does not have your approv=
al.</div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 7, 2013//EXTENDED to include Wednesday, August 21, 2013</=
div>
<div>Day: Wednesday</div>
<div>Time: 6:00am - 7:30am</div>
<div>Building(s): E25</div>
<div>Room(s): 6th fl.</div>
<div>System: fire alarm</div>
<div>Duration: 6:00am - 7:30am</div>
<div>Reason: </div>
<div> </div>
<div><font face=3D"Calibri, sans-serif">**<b>EXTENDED: </b><font face=3D"Ca=
libri, sans-serif" color=3D"#1F497D"><b>We would like to extend the E25-all=
fire alarm shutdown from </b></font><font face=3D"Calibri, sans-serif" col=
or=3D"#1F497D"><u><b>6 AM to 7:30 AM</b></u></font><font face=3D"Calibri, s=
ans-serif" color=3D"#1F497D"><b>
on Wednesday, August 21</b></font><font face=3D"Calibri, sans-serif" size=
=3D"1" color=3D"#1F497D"><sup><b>st</b></sup></font><font face=3D"Calibri, =
sans-serif" color=3D"#1F497D"><b>, 2013</b></font><font face=3D"Calibri, sa=
ns-serif" color=3D"#1F497D"><b> for JMBCo (Wayne
Maginnis 617-212-2059/Rich Cucchi 617-522-6800) to complete tie-in, program=
ming and testing the new speaker/strobes and exhaust fan HOA switches; and =
we will conduct a *</b></font><font face=3D"Calibri, sans-serif" color=3D"#=
1F497D"><b>live audible 3</b></font><font face=3D"Calibri, sans-serif" size=
=3D"1" color=3D"#1F497D"><sup><b>rd</b></sup></font><font face=3D"Calibri, =
sans-serif" color=3D"#1F497D"><b>
party test of the new E25-6</b></font><font face=3D"Calibri, sans-serif" si=
ze=3D"1" color=3D"#1F497D"><sup><b>th</b></sup></font><font face=3D"Calibri=
, sans-serif" color=3D"#1F497D"><b> floor fire alarm system</b></font><font=
face=3D"Calibri, sans-serif" color=3D"#1F497D"><b>*
as part of the Prof. McGee lab cleanroom renovation project by DC Beane (Ry=
an Kucinski 617-997-9498). Both the shutdown request form and work or=
der #5206749 have been modified to reflect this extension on behalf of Bill=
y Homeyer</b></font><font face=3D"Calibri, sans-serif" color=3D"#1F497D">.<=
/font><font face=3D"Calibri, sans-serif" color=3D"#1F497D">**</font></font>=
</div>
<div> </div>
<div>We request bldg E25-6th floor fire alarm shutdowns as follows;from 6 A=
M to 2 PM on Wednesday, August 7th, 2013, Simplex (Rich Perron 781-603-7799=
) will program HOA switches for the new exhaust fans and from 6 AM to 7:30 =
AM, we will conduct a *live audible
1st party test of the new E25-6th floor fire alarm devices*. On=
Thursday, August 8th, 2013 from 6 AM to 7:30 AM, JMBCo (Rich Cucchi =
617-522-6800) will conduct a *live audible 3rd party test of the E25-6th fl=
oor fire alarm system* as part of the Prof. McGee
lab cleanroom renovation project by DC Beane (Ryan Kucinski 617-997-9498).&=
nbsp; Biss Teelucksingh 2-5972 and Paul Murphy 4-6361 are the MIT project m=
anagers on behalf of Billy Homeyer.</div>
<div> </div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown. </div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C7DD1D87dofexchmbx01f_--