[169529] in Hotline Meeting
RE: Bldg. E25-6th flr/Penthouse Emergency Power Panel Shutdown
daemon@ATHENA.MIT.EDU (John MacDonald)
Tue May 21 15:20:59 2013
From: John MacDonald <macdonaj@MIT.EDU>
To: "shutdown-response@MIT.EDU" <shutdown-response@MIT.EDU>,
"undisclosed_recipients@MIT.EDU" <undisclosed_recipients@MIT.EDU>
CC: Bernadette T Drinkwater <bdrink@MIT.EDU>,
"shutdowns@MIT.EDU"
<shutdowns@MIT.EDU>,
Steven R Gilligan <sgilliga@MIT.EDU>,
Billy Homeyer
<whomeyer@MIT.EDU>,
"ksemerj@plant.mit.edu" <ksemerj@plant.mit.edu>
Date: Tue, 21 May 2013 19:20:40 +0000
Message-ID: <A1BBBB0DE0BFF94FA2732D8DEA6ACEE7889DC7@OC11EXPO30.exchange.mit.edu>
In-Reply-To: <B6EEF1B8E9C444219E7F3A46C626B31D@facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit
OK DCM
John MacDonald
Facilities Coordinator
Division of Comparative Medicine
77 Mass Ave Bldg 16-825
Cambridge, MA 02139
Phone (617) 324-4385
Cell (617) 999-2886
macdonaj@mit.edu
-----Original Message-----
From: shutdown-response@MIT.EDU [mailto:shutdown-response@MIT.EDU]
Sent: Tuesday, May 21, 2013 3:14 PM
To: undisclosed_recipients@MIT.EDU
Cc: Bernadette T Drinkwater; shutdowns@MIT.EDU; Steven R Gilligan; Billy Homeyer; ksemerj@plant.mit.edu
Subject: Bldg. E25-6th flr/Penthouse Emergency Power Panel Shutdown Request
Importance: High
The following Emergency Power Panel LS2-6 & vesda smoke control panel shutdown request for Bldg. E25-6th flr/penthouse/clean room on Friday, May 24, 2013 is for your information and response. Any questions please contact Billy Homeyer x3-0482.
Would you please let us know whether this does or does not have your approval.
Thank you,
Bernadette Drinkwater
Repair and Maintenance
x3-0938
We request a bldg E25-6th floor emergency power panel LS2-6 shutdown from 5 AM to 7 AM on Friday morning, May 24th, 2013 for EG Sawyer (Ed Murphy 781-974-0679) to install (1) circuit breaker in LS2-6 for new emergency control circuit feed. This shutdown will affect 6th floor and/or penthouse, lab/office emergency lights and Vesda smoke control panel as part of the Prof. McGee lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498). Biss Teelucksingh 2-5972 and Paul Murphy 4-6163 are the MIT project managers on behalf of Billy Homeyer.
Type: Normal
Date: May 24, 2013
Day: Friday
Time: 5:00am - 7:00am
Building(s): E25
Room(s): 6th flr/penthouse/
System: Emergency Power Panel
Duration: 2 hours
Reason:
Install (1) circuit breaker for new emerg. control circuit feed.
Effect:
Loss of emergency power/lighting/corridor/stairs.