Bldg. E25-6th flr/Penthouse Emergency Power Panel Shutdown Request

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Tue May 21 15:14:01 2013

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <bdrink@MIT.EDU>, <shutdowns@MIT.EDU>, <sgilliga@MIT.EDU>,
        <whomeyer@MIT.EDU>, <ksemerj@plant.mit.edu>
Date: Tue, 21 May 2013 15:13:53 -0400
Message-ID: <B6EEF1B8E9C444219E7F3A46C626B31D@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Emergency Power Panel LS2-6 & vesda smoke control panel shutdown request for Bldg. E25-6th flr/penthouse/clean room on Friday, May 24, 2013 is for your information and response. Any questions please contact Billy Homeyer x3-0482. 

Would you please let us know whether this does or does not have your approval.

Thank you,
Bernadette Drinkwater
Repair and Maintenance
x3-0938

We request a bldg E25-6th floor emergency power panel LS2-6 shutdown from 5 AM to 7 AM on Friday morning, May 24th, 2013 for EG Sawyer (Ed Murphy 781-974-0679) to install (1) circuit breaker in LS2-6 for new emergency control circuit feed.  This shutdown will affect 6th floor and/or penthouse, lab/office emergency lights and Vesda smoke control panel as part of the Prof. McGee lab cleanroom project by DC Beane (Ryan Kucinski 617-997-9498).  Biss Teelucksingh 2-5972 and Paul Murphy 4-6163 are the MIT project managers on behalf of Billy Homeyer.

Type: Normal
Date: May 24, 2013
Day: Friday
Time: 5:00am - 7:00am
Building(s): E25
Room(s): 6th flr/penthouse/
System: Emergency Power Panel
Duration: 2 hours
Reason: 
Install (1) circuit breaker for new emerg. control circuit feed.

Effect: 
Loss of emergency power/lighting/corridor/stairs.