[160082] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. W2 - All Fire Alarm w/live audible testing shuttdown request

daemon@ATHENA.MIT.EDU (shutdown-response@MIT.EDU)
Thu Jul 12 12:58:30 2012

From: shutdown-response@MIT.EDU
To: <undisclosed_recipients@MIT.EDU>
Cc: <shutdowns@MIT.EDU>, <whomeyer@plant.mit.edu>
Date: Thu, 12 Jul 2012 12:53:51 -0400
Message-ID: <C0B060CF8AA5470A930EAA35682ECAD5@facilities.ms.mit.edu>
MIME-Version: 1.0
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
Content-Class: urn:content-classes:message

The following Fire Alarm Testing with live Audible shutdown request for Bldg. W2 - All on Friday, July 13, 2012 is for your information and response. Any questions, please contact Billy Homeyer x8-0432.

Would you please let us know whether this does or does not have your approval.

Thank you,
Bernadette Drinkwater
Repair and Maintenance
x3-0938


We request a bldg W2-all fire alarm shutdown from 6 AM to 2 PM for JMBCo to identify fire alarm panel wiring in preparation for the installation of a new panel. JMBCo requests MIT jack-out the DGP and power down of the main fire alarm panel as part of the W2 life-safety and suite upgrades/renovation project by Shawmut Construction (Pat Coburn 617-594-1500). Sudy Nally 8-8010 and Biss Teelucksingh 2-5972 are the MIT project managers.

We will conduct *live audible testing of the bldg W2 fire alarm system once the system has been restored, 1 PM to 2 PM*.


Type: Normal
Date: July 13, 2012
Day: Friday
Time: 6:00am - 2:00pm
Building(s): W2
Room(s): All
System: Fire Alarms
Duration: 8 hours
Reason: 
JMBCO to power down panel, pull cards, identify wiring. live test.

Effect: 
Fire Alarms.

This message was sent the following recipients: rm-wcs@mit.edu; src@MIT.EDU; hmgr@mit.edu; kcn@mit.edu; mwhelan@mit.edu; 

home help back first fref pref prev next nref lref last post