[158352] in Hotline Meeting
Approved - Bldg. E25-All, Heating Hot Water & E23/E25 lab process
daemon@ATHENA.MIT.EDU (Bernadette Drinkwater)
Wed May 9 11:05:03 2012
From: Bernadette Drinkwater <BDrink@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
"jmganno@MIT.EDU" <jmganno@mit.edu>, "craigp@MIT.EDU" <craigp@mit.edu>,
"OPS
RM Campus Services East" <rm-ecs@mit.edu>,
Ops Custodial Admin & Support
Staff <cust-staff@mit.edu>,
"smaram@mit.edu" <smaram@mit.edu>, "adaz@mit.edu"
<adaz@mit.edu>,
"ninadm@mit.edu" <ninadm@mit.edu>, Michael Smith
<masmith@mit.edu>,
"brig@med.mit.edu" <brig@med.mit.edu>,
"fris@med.mit.edu"
<fris@med.mit.edu>,
MIT Schedules Office <schedules@mit.edu>,
"heatherg@mit.edu" <heatherg@mit.edu>,
"bengel@mit.edu" <bengel@mit.edu>, "tquinn@mit.edu" <tquinn@mit.edu>
CC: "whomeyer@mit.edu" <whomeyer@mit.edu>,
"shutdowns@mit.edu"
<shutdowns@mit.edu>,
Michael Correira <mmcorrei@plant.mit.edu>,
"cp-command@mit.edu" <cp-command@mit.edu>,
"safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
DOF Customer Service Center
<dof-csc@mit.edu>,
Ops RM Shutdown <rm-shutdown@mit.edu>
Date: Wed, 9 May 2012 11:04:59 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF0CE139B76B@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 8bit
The following Approved shutdown for E25-All Heating Hot Water & E23/E25-All , lab process hot/cold for Saturday, May 12, 2012 from 6:00am to 6:00pm is for your information. Any questions, please contact Billy Homeyer x8-0432.
Thank you,
Bernadette Drinwkater
Repair and Maintenance
x3-0938
We request bldg E25 heating hot water and bldgs E23/E25 lab process hot/cold water shutdowns from 6 AM to 6 PM on Saturday, May 12th, 2012 for the installation of a new summer/winter heating/cooling system blending valve in the 006 mech room and for continued work on the underslab lab waste drain piping in the main construction area as part of the E25-bsmt AQ's renovation project by Bond Brothers (Andy Cogliano 617-839-8965). Jon Himmel 2-2402 is the MIT project manager.
FYI E23 LPH/C water needs to go down due to the new forced main being part of E25 lab waste.
Type: Normal
Date: May 12, 2012
Day: Saturday
Time: 6:00AM - 6:00PM
Building(s): E23 & E25
Room(s): ALL
System: E25 Heating Hot Water/E23 & E25 lab process hot/cold water
Duration: 12 hours
Reason:
Install new summer/winter mixing valve, work underslab lab waste piping
Effect:
Loss of heating hot water & hot/cold lab process.