[158353] in Hotline Meeting
tempered water? Re: Approved - Bldg. E25-All, Heating Hot Water
daemon@ATHENA.MIT.EDU (Barbara Engel)
Wed May 9 11:09:52 2012
Message-ID: <4FAA88BA.7050904@mit.edu>
Date: Wed, 09 May 2012 11:09:46 -0400
From: Barbara Engel <bengel@MIT.EDU>
MIME-Version: 1.0
To: Bernadette Drinkwater <BDrink@plant.mit.edu>
CC: "jdoughty@mit.edu" <jdoughty@MIT.EDU>, "swade@mit.edu" <swade@MIT.EDU>,
"jmganno@MIT.EDU" <jmganno@MIT.EDU>, "craigp@MIT.EDU" <craigp@MIT.EDU>,
OPS RM Campus Services East <rm-ecs@MIT.EDU>,
Ops Custodial Admin & Support Staff <cust-staff@MIT.EDU>,
"smaram@mit.edu" <smaram@MIT.EDU>, "adaz@mit.edu" <adaz@MIT.EDU>,
"ninadm@mit.edu" <ninadm@MIT.EDU>, Michael Smith <masmith@MIT.EDU>,
"brig@med.mit.edu" <brig@med.mit.edu>,
"fris@med.mit.edu" <fris@med.mit.edu>,
MIT Schedules Office <schedules@MIT.EDU>,
"heatherg@mit.edu" <heatherg@MIT.EDU>,
"tquinn@mit.edu" <tquinn@MIT.EDU>,
"whomeyer@mit.edu" <whomeyer@MIT.EDU>,
"shutdowns@mit.edu" <shutdowns@MIT.EDU>,
Michael Correira <mmcorrei@plant.mit.edu>,
"cp-command@mit.edu" <cp-command@MIT.EDU>,
"safety@mit.edu" <safety@MIT.EDU>, Operators <Operators@plant.mit.edu>,
DOF Customer Service Center <dof-csc@MIT.EDU>,
Ops RM Shutdown <rm-shutdown@MIT.EDU>
In-Reply-To: <4EEA516695C10541B7CB963FF54A56AF0CE139B76B@dof-exchmbx01.facilities.ms.mit.edu>
Content-Type: multipart/alternative;
boundary="------------000803020707000106020308"
This is a multi-part message in MIME format.
--------------000803020707000106020308
Content-Type: text/plain; charset=ISO-8859-1; format=flowed
Content-Transfer-Encoding: 7bit
Am I correct in assuming that it will also involve the TEMPERED water
(SAFETY SHOWERS/EYEWASHES), as was spelled out in the revised shutdown
request dated 5/4/12? If so, please re-issue this approved notice, so
we have the full picture.
Thanks!
Barbara Engel
On 5/9/12 11:04 AM, Bernadette Drinkwater wrote:
> The following Approved shutdown for E25-All Heating Hot Water& E23/E25-All , lab process hot/cold for Saturday, May 12, 2012 from 6:00am to 6:00pm is for your information. Any questions, please contact Billy Homeyer x8-0432.
>
> Thank you,
> Bernadette Drinwkater
> Repair and Maintenance
> x3-0938
>
> We request bldg E25 heating hot water and bldgs E23/E25 lab process hot/cold water shutdowns from 6 AM to 6 PM on Saturday, May 12th, 2012 for the installation of a new summer/winter heating/cooling system blending valve in the 006 mech room and for continued work on the underslab lab waste drain piping in the main construction area as part of the E25-bsmt AQ's renovation project by Bond Brothers (Andy Cogliano 617-839-8965). Jon Himmel 2-2402 is the MIT project manager.
>
> FYI E23 LPH/C water needs to go down due to the new forced main being part of E25 lab waste.
>
>
> Type: Normal
> Date: May 12, 2012
> Day: Saturday
> Time: 6:00AM - 6:00PM
> Building(s): E23& E25
> Room(s): ALL
> System: E25 Heating Hot Water/E23& E25 lab process hot/cold water
> Duration: 12 hours
> Reason:
> Install new summer/winter mixing valve, work underslab lab waste piping
>
> Effect:
> Loss of heating hot water& hot/cold lab process.
>
--
Barbara Engel
Administrative Officer and EHS Coordinator
MIT Whitaker College
E25-525
(617) 253-4317
bengel@mit.edu
In Office: Tues., Wed., Fri.
--------------000803020707000106020308
Content-Type: text/html; charset=ISO-8859-1
Content-Transfer-Encoding: 7bit
<html>
<head>
<meta content="text/html; charset=ISO-8859-1"
http-equiv="Content-Type">
</head>
<body bgcolor="#FFFFFF" text="#000000">
<font face="Times New Roman">Am I correct in assuming that it will
also involve the TEMPERED water (SAFETY S</font>HOWERS/EYEWASHES),
as was spelled out in the revised shutdown request dated 5/4/12?
If so, please re-issue this approved notice, so we have the full
picture.<br>
<br>
Thanks!<br>
Barbara Engel<br>
<br>
<br>
On 5/9/12 11:04 AM, Bernadette Drinkwater wrote:
<blockquote
cite="mid:4EEA516695C10541B7CB963FF54A56AF0CE139B76B@dof-exchmbx01.facilities.ms.mit.edu"
type="cite">
<pre wrap="">The following Approved shutdown for E25-All Heating Hot Water & E23/E25-All , lab process hot/cold for Saturday, May 12, 2012 from 6:00am to 6:00pm is for your information. Any questions, please contact Billy Homeyer x8-0432.
Thank you,
Bernadette Drinwkater
Repair and Maintenance
x3-0938
We request bldg E25 heating hot water and bldgs E23/E25 lab process hot/cold water shutdowns from 6 AM to 6 PM on Saturday, May 12th, 2012 for the installation of a new summer/winter heating/cooling system blending valve in the 006 mech room and for continued work on the underslab lab waste drain piping in the main construction area as part of the E25-bsmt AQ's renovation project by Bond Brothers (Andy Cogliano 617-839-8965). Jon Himmel 2-2402 is the MIT project manager.
FYI E23 LPH/C water needs to go down due to the new forced main being part of E25 lab waste.
Type: Normal
Date: May 12, 2012
Day: Saturday
Time: 6:00AM - 6:00PM
Building(s): E23 & E25
Room(s): ALL
System: E25 Heating Hot Water/E23 & E25 lab process hot/cold water
Duration: 12 hours
Reason:
Install new summer/winter mixing valve, work underslab lab waste piping
Effect:
Loss of heating hot water & hot/cold lab process.
</pre>
</blockquote>
<br>
<pre class="moz-signature" cols="72">--
Barbara Engel
Administrative Officer and EHS Coordinator
MIT Whitaker College
E25-525
(617) 253-4317
<a class="moz-txt-link-abbreviated" href="mailto:bengel@mit.edu">bengel@mit.edu</a>
In Office: Tues., Wed., Fri.</pre>
</body>
</html>
--------------000803020707000106020308--