[5829] in APO Printshop
Re: Qualifying press run?
daemon@ATHENA.MIT.EDU (Leonard H Tower Jr.)
Mon Aug 31 23:35:14 2009
Date: Mon, 31 Aug 2009 23:35:06 -0400 (EDT)
From: "Leonard H Tower Jr." <tower@alum.MIT.EDU>
To: Kristin Kuhn <kkuhn@MIT.EDU>
cc: apo-printshop <apo-printshop@MIT.EDU>
In-Reply-To: <9c92c16e0908311814i77cbf0cfl5700a9acdb90fca2@mail.gmail.com>
This message is in MIME format. The first part should be readable text,
while the remaining parts are likely unreadable without MIME-aware tools.
---559023410-1804928587-1251776106=:18114
Content-Type: TEXT/PLAIN; charset=X-UNKNOWN
Content-Transfer-Encoding: QUOTED-PRINTABLE
Date: Mon, 31 Aug 2009 21:14:07 -0400
From: Kristin Kuhn <kkuhn@MIT.EDU>
=20
those paper-holding clip things* overlap.
guage pins
some versions actually have guages or rulers on them
=20
*one day my press shop vocabulary will be a little less embarassing... ;=
)
=20
-Kristin
APOster is into concepts, safety, and quality
vocabulary is secondary ; - }
yiLFS -len=20
=20
On Tue, Aug 25, 2009 at 8:21 PM, Leonard H Tower Jr.<tower@alum.mit.edu>=
wrote:
> svp, pvp, book exchange chair
>
> please make sure rkw has all event info to go on the reg day schedule
> cards
>
> project names, date, time, place, room number/place to meet at, etc.
>
> thanx
> =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
>
> kkuhn et al
>
> please correct me about dates etc.
> =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
>
> press ops
>
> looks like there will be a lot of printing done by reg day
>
> this is a heads-up and start @ coordination, so it can all get done,
> with no one being bumped
>
> five jobs, all unusual/complex
>
> * rkw, with assistance from me on the hard parts, will supervise
> =A0printing the reg day schedule cards. =A0ideally they be printed thi=
s
> =A0weekend, but to the best of my knowledge, the svp, the pvp, and boo=
k
> =A0ex chair do not have all the event info yet
>
> =A0they need to be done by sunday evening 6 sep to be sufficiently dry
> =A0for tue 8 sep - that means we need all the info by early fri 4 sep
>
> =A0even for me, the reg day card can be a infinite time sink to reset
>
> * the small press will be out of the APOffice on 1 sep and again on 4
> =A0sep with sufficient equipment to print with it. =A0that may leave t=
he
> =A0large press difficult or impossible to use
>
> =A0i expect it will make the trips on the new small press cart.
> =A0more on that later
>
> * lori has a job, that keven riggle can qualify with.
>
> =A01,100, so it's a long job and a long qualifying run
>
> * alan will be doing wedding invites for brother jesse cox and his
> =A0fiance danielle. =A0it's @ least a 2 piece job. =A0i don't know if =
he's
> =A0also doing envelopes for them
>