[5828] in APO Printshop

home help back first fref pref prev next nref lref last post

Re: Qualifying press run?

daemon@ATHENA.MIT.EDU (Leonard H Tower Jr.)
Mon Aug 31 21:21:33 2009

Date: Mon, 31 Aug 2009 21:21:29 -0400 (EDT)
From: "Leonard H Tower Jr." <tower@alum.mit.edu>
To: Kristin Kuhn <kkuhn@mit.edu>
cc: apo-printshop <apo-printshop@mit.edu>
In-Reply-To: <9c92c16e0908311814i77cbf0cfl5700a9acdb90fca2@mail.gmail.com>

  This message is in MIME format.  The first part should be readable text,
  while the remaining parts are likely unreadable without MIME-aware tools.

--8323329-1222711785-1251768089=:6448
Content-Type: TEXT/PLAIN; charset=ISO-8859-1
Content-Transfer-Encoding: QUOTED-PRINTABLE

you need the push-push solvent can?
(and the old one doesn't work very well)
and type cleaning brushes?

maybe not, if you're all set up and ready to print

yiLFS -len=20

   Date: Mon, 31 Aug 2009 21:14:07 -0400
   From: Kristin Kuhn <kkuhn@MIT.EDU>
   To: Leonard H Tower Jr. <tower@alum.mit.edu>
   Cc: apo-printshop <apo-printshop@mit.edu>
   Subject: Re: Qualifying press run?
  =20
   I don't think the mini-press took anything super-necessary from the
   big press, when we used it at CPW. We used different rollers, and a
   different chaise... I think only quoins and those paper-holding clip
   things* overlap.
  =20
   *one day my press shop vocabulary will be a little less embarassing... ;=
)
  =20
   -Kristin
  =20
   On Tue, Aug 25, 2009 at 8:21 PM, Leonard H Tower Jr.<tower@alum.mit.edu>=
 wrote:
   > svp, pvp, book exchange chair
   >
   > please make sure rkw has all event info to go on the reg day schedule
   > cards
   >
   > project names, date, time, place, room number/place to meet at, etc.
   >
   > thanx
   > =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
   >
   > kkuhn et al
   >
   > please correct me about dates etc.
   > =3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
   >
   > press ops
   >
   > looks like there will be a lot of printing done by reg day
   >
   > this is a heads-up and start @ coordination, so it can all get done,
   > with no one being bumped
   >
   > five jobs, all unusual/complex
   >
   > * rkw, with assistance from me on the hard parts, will supervise
   > =A0printing the reg day schedule cards. =A0ideally they be printed thi=
s
   > =A0weekend, but to the best of my knowledge, the svp, the pvp, and boo=
k
   > =A0ex chair do not have all the event info yet
   >
   > =A0they need to be done by sunday evening 6 sep to be sufficiently dry
   > =A0for tue 8 sep - that means we need all the info by early fri 4 sep
   >
   > =A0even for me, the reg day card can be a infinite time sink to reset
   >
   > * the small press will be out of the APOffice on 1 sep and again on 4
   > =A0sep with sufficient equipment to print with it. =A0that may leave t=
he
   > =A0large press difficult or impossible to use
   >
   > =A0i expect it will make the trips on the new small press cart.
   > =A0more on that later
   >
   > * lori has a job, that keven riggle can qualify with.
   >
   > =A01,100, so it's a long job and a long qualifying run
   >
   > * alan will be doing wedding invites for brother jesse cox and his
   > =A0fiance danielle. =A0it's @ least a 2 piece job. =A0i don't know if =
he's
   > =A0also doing envelopes for them
   >
   > yiLFS -len
   >
  =20
--8323329-1222711785-1251768089=:6448--

home help back first fref pref prev next nref lref last post