[53327] in Hotline Meeting
RE: Building 18 shutdown request for 1/11/01
daemon@ATHENA.MIT.EDU (Dawn Simonelli)
Fri Jan 5 11:29:15 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451D2BCC8@PLANT.MIT.EDU>
From: Dawn Simonelli <dsimone@PLANT.MIT.EDU>
To: A-Zone <A-Zone@MIT.Edu>, akelsey@MIT.Edu,
Cust-Coach
<cust-coach@MIT.Edu>, mbj@MIT.Edu,
"schedule@mit.edu" <rjwilk@mit.eduL>, shutdowns@MIT.Edu
Cc: shutdown@PLANT.MIT.EDU
Date: Fri, 5 Jan 2001 11:29:08 -0500
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
There has been a change in this shutdown. It will start at 6pm instead of
3pm and will last until 6 am. Also to make things clearer this is for the
11th, there was a typo on the original notification subject line saying the
22nd but the correct date is the 11th.
Thank you
Dawn Simonelli
>
The following shutdown request for builidng 18 is for building 18. This is
for all of the builidng power. Please let me know if this does or does meet
with your approval.
Thank you
Dawn Simonelli
Repair and Maintenance
2-1599
> Status: Normal
> Building: 18 Entire building
> Date: 1/11/01
> Day: Thursday
> Time: 6:00 pm - 6 am
> System: All builidng power & lights for the building (except for emergency
> system)
> Duration: 16 hours
> Reason:
> To replace 13,800 volt feeders and remove first switchboard.
>
> Effect:
> There will be no access controls, no building power, no elevators,
> computers, telephones, or lights. The water systems that will be down
> are chilled water, condenser water, pure water, hot and cold domestic, hot
> and cold lab processed, heating water, and de-ionized. The supply
> ventilation air, supply cooling air, supply heating, exhaust-laboratory
> air. exhaust general air, exhaust toilet, compressed control air,
> compressed lab air and lab vacuum air. Also the condensate return steam
> and exhaust hoods will be down.
>
>