[950] in I/T Delivery

home help back first fref pref prev next nref lref last post

5ESS upgrade and replacement Project

daemon@ATHENA.MIT.EDU (Joan Cyr)
Tue Dec 3 16:41:32 2002

Message-Id: <5.1.0.14.2.20021203160736.0239bed8@hesiod>
Date: Tue, 03 Dec 2002 16:42:28 -0500
To: delivery@mit.edu
From: Joan Cyr <jcyr@MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_27931703==_.ALT"

--=====================_27931703==_.ALT
Content-Type: text/plain; charset="us-ascii"; format=flowed

Project Name: 5ESS upgrade and replacement
Project Leader: Lu Keohane
Report Date December 6, 2002
Submitted by: Lu Keohane/Joan Cyr
Project Notebook URL: http://web.mit.edu/is/delivery/5ess/

Accomplishments in November 2002:
Discovered a problem in SM006...number privacy feature was not 
functioning.  Contacted Lucent and worked to resolve the issue (feature now 
works);

Completed the reconstruction of the NW12 switchroom;

Continued planning the E19 reconstruction (now in concert with construction 
around E19 5th floor HVAC work, where ducts will be run through floor 6 and 
7 to the E19 roof)

Continued negotiations around final payments for Lucent Integration travel 
and living expenses, and transportation costs;
Next Month's plan:

Finailize the redesign and construction plans for the E19's switchroom, 
(e.g. this includes the surrounding offices and equipment that had been 
moved prior to the start of this project.  This will include the addition 
of 4 new staff members and possibly 4 new contracted members).  This 
redesign process will occur in conjunction with Christine Cavanna (I/S 
Space Planning) and encompass all TNS staff in E19, as well as the HVAC 
work being performed on floor 5 that will go through our space on floor 6.

Begin the planning process for the training for the Operations team and 
technician.  (e.g. 5E architecture, maintenance, translations, DDM 2000 and 
other newly installed equipment).

Issues:

None.

Key Learnings:

"Know when to say when" (learned that on Thanksgiving...;o)

Joni  :o) 
--=====================_27931703==_.ALT
Content-Type: text/html; charset="us-ascii"

<html>
Project Name: 5ESS upgrade and replacement<br>
Project Leader: Lu Keohane<br>
Report Date December 6, 2002<br>
Submitted by: Lu Keohane/Joan
Cyr<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
<font size=2>Project Notebook URL:
</font><a href="http://web.mit.edu/is/delivery/5ess/" eudora="autourl"><font size=2 color="#0000FF"><u>h</a></font><a href="http://web.mit.edu/is/delivery/5ess/" eudora="autourl"><font face="Arial Narrow, Helvetica" color="#0000FF">ttp://web.mit.edu/is/delivery/5ess/</a><br><br>
</font><b>Accomplishments in November 2002:</u></b> 
<dl>
<dd>Discovered a problem in SM006...number privacy feature was not
functioning.&nbsp; Contacted Lucent and worked to resolve the issue
(feature now works);<br><br>

<dd>Completed the reconstruction of the NW12 switchroom; <br><br>

<dd>Continued planning the E19 reconstruction (now in concert with
construction around E19 5th floor HVAC work, where ducts will be run
through floor 6 and 7 to the E19 roof)<br><br>

<dd>Continued negotiations around final payments for Lucent Integration
travel and living expenses, and transportation costs; 
</dl><b><u>Next Month’s plan:<br><br>
</u></b>Finailize the redesign and construction plans for the E19’s
switchroom, (e.g. this includes the surrounding offices and equipment
that had been moved prior to the start of this project.&nbsp; This will
include the addition of 4 new staff members and possibly 4 new contracted
members).&nbsp; This redesign process will occur in conjunction with
Christine Cavanna (I/S Space Planning) and encompass all TNS staff in
E19, as well as the HVAC work being performed on floor 5 that will go
through our space on floor 6.<br><br>
Begin the planning process for the training for the Operations team and
technician.&nbsp; (e.g. 5E architecture, maintenance, translations, DDM
2000 and other newly installed equipment).<br><br>
<b><u>Issues:<br><br>
</u></b><font size=2>None.<br><br>
</font><b><u>Key Learnings:</u></b> <br><br>
&quot;Know when to say when&quot; (learned that on
Thanksgiving...;o)<br>
<br>
Joni&nbsp; :o)