[1150] in I/T Delivery
DW Delivery Monthly Report
daemon@ATHENA.MIT.EDU (Mary Weisse)
Thu May 8 11:47:22 2003
Message-Id: <4.3.2.7.2.20030508114123.018d8008@hesiod>
Date: Thu, 08 May 2003 11:47:03 -0400
To: delivery@mit.edu
From: Mary Weisse <mca@MIT.EDU>
Cc: warehouse@mit.edu
In-Reply-To: <5.1.0.14.2.20030428132154.018b2fd8@po9.mit.edu>
Mime-Version: 1.0
Content-Type: multipart/alternative;
boundary="=====================_270350223==_.ALT"
--=====================_270350223==_.ALT
Content-Type: text/plain; charset="iso-8859-1"; format=flowed
Content-Transfer-Encoding: quoted-printable
Team Name: Data Warehouse
Team Leader: Mary Weisse
Report Date: May 8, 2003
URL: http://web.mit.edu/warehouse/
This month's accomplishments (April, 2003)
=B7 EHS
o Completed implementation of EHS labs data in the Data=20
Warehouse.
o Finalize conceptual model of EHS training data.
o Begin prototype of EHS training data.
o Completed required DW database maintenance for EHS=
reporting.
=B7 Continued work with the Project Intersections Team..
=B7 Continue work on SAP/HR.
o Complete verification of the HR Conceptual data model(s).
o Begin design of the DW HR reporting model(s)/data stars.
o Implemented new functionality in extracting SAP data:=20
encrypting (pgp)
files before they are ftp'd from the SAP server to the=20
warehouse. This
functionality is critical for the HR implementation. Mark=
=20
Sprague and
David Rosenberg worked on this on the FSS side.
o Worked with FSS HR team to help them test the new=20
enterprise structure
(to be implemented in SAP production on May 19th).=20
Modified warehouse
structures and programs, and loaded data from SAP test=20
server into the
test warehouse, so that the HR team can do the testing.
o Completed writing and testing shell scripts to monitor=20
Cyborg personnel
load and Krb mapping load.
o Begin working on HR reporting authorizations.
=B7 Continue working on joining HR data and "Who is Teaching What=
data"=20
for
Deans & Provost to answer questions about faculty teaching loads.
=B7 Worked with CAO and FSS assisting in SAP integration testing:=
loaded
data into the test warehouse for CAO testing.
=B7 Continue working with Giri S. on the web application to display=20
employees' MIT card pictures.
=B7 AAUDE
o Deliver 1-day training class for AAUDE at COFFEE=20
Conference in Chicago.
o Complete AAUDE release II analysis, budget, and=20
implementation plans.
o Implemented and loaded University of Delaware survey data=
=20
for teaching load and expenditures.
o Implemented and loaded Faculty Profile by CIP.
o Refreshed "2000 Edition" CIP data.
o Cleaned up the basic CIP table which includes all CIP=20
codes used in AAUDE.
o Loaded 2002-2003 AAUP Faculty Salary data.
o Started analysis work on IPEDS Institution Characteristics=
=20
data.
o Attended Annual Conference at Ohio State University (April=
=20
29th-May1st).
o Prepared and deliver Brio 6 training class for AAUDE at=20
Conference in Ohio.
=B7 Continue loading Student Degree Candidate data.
=B7 Worked with ASST to set up and configure 2 second Warehouse Web=
Server.
=B7 Continue testing of the brio 6 pc installer.
=B7 Brio
o Finished work needed for Brio 6 web pages.
o Prepared and delivered three demos on Brio 6 to the MIT=20
community.
o Prepared Brio 6 classes for CAO.
o Prepared & delivered Brio 6 class for Lincoln Labs=20
Benefits Office.
o Continue working with training & Pubs to identify and=20
create new Brio 6 Classes.
=B7 Implemented and loaded mitid_db_person data from the MIT ID=
database
for the Parking & Transportation Office.
=B7 Completed and signed off on all DW Team member performance=
reviews.
Next Month's Plans (May, 2003)
=B7 Continue with Web Hits change processing procedures to=20
include a new web
browser (Mozilla) and a couple of new browser versions for=
=20
Netscape in Web
Hits reporting. Create 3 dimension tables for the Web Hits=
=20
Star/Data Model.
=B7 Continue working with Giri S. on the web application to display=20
employees' MIT card pictures.
=B7 Continue AAUDE work
=B7 Begin work on Student Activities Web Reporting Application.
=B7 Begin to look into moving the data files around to enhance=
database=20
performance.
=B7 Continue work on EHS Training.
=B7 Present work on Project Intersections Team to ASPCC.
=B7 Continue work on SAP/HR.
=B7 Implement changes to Sloan School of Management Tuition Sharing=20
project.
=B7 Implement Graduate Admissions Survey data. Implement access=
control
(using Roles Database) on Graduate Admissions data.
=B7 Continue with Brio 6 rollout.
Next Community Milestones:
=B7 Rollout of Student Activities Web Reporting Application - July=
2003.
=B7 Rollout of the SAP/HR/CYBORG - September 2003.
=B7 Rollout EHS Training Reporting June 2003.
=B7 Load summary (by service) MIT Medical data into the DW. On Hold.
=B7 Load TLO case data into the DW On Hold.
=B7 Load MIT Card Office data (including pictures) into the DW.
--=====================_270350223==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable
<html>
<font size=3D4><b>Team Name</b>: Data Warehouse<br>
<b>Team Leader:</b> Mary Weisse<br>
<b>Report Date:</b> May 8, 2003<br>
<b>URL:</b>
</font><a href=3D"http://web.mit.edu/warehouse/" eudora=3D"autourl"><font=
size=3D4 color=3D"#0000FF"><u>http://web.mit.edu/warehouse/</a><br>
<br>
<br>
</u></font><font size=3D4><b>This month's accomplishments (April, 2003)<br>
</b></font><font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>EHS<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Completed=
implementation of EHS labs data in the Data Warehouse. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Finalize=
conceptual model of EHS training data. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Begin=
prototype of EHS training data. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Completed=
required DW database maintenance for EHS reporting.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continued work with the Project Intersections Team..<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue work on SAP/HR.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Complete=
verification of the HR Conceptual data model(s). <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Begin design=
of the DW HR reporting model(s)/data stars. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Implemented=
new functionality in extracting SAP data: encrypting (pgp) <br>
<x-tab> </x-tab><x-tab> =
</x-tab>files before they are=
ftp'd from the SAP server to the warehouse. This <br>
<x-tab> </x-tab><x-tab> =
</x-tab>functionality is critical=
for the HR implementation. Mark Sprague and <br>
<x-tab> </x-tab><x-tab> =
</x-tab>David Rosenberg worked on=
this on the FSS side.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Worked with=
FSS HR team to help them test the new enterprise structure <br>
<x-tab> </x-tab><x-tab> =
</x-tab>(to be implemented in SAP=
production on May 19th). Modified warehouse <br>
<x-tab> </x-tab><x-tab> =
</x-tab>structures and programs,=
and loaded data from SAP test server into the <br>
<x-tab> </x-tab><x-tab> =
</x-tab>test warehouse, so that=
the HR team can do the testing.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Completed=
writing and testing shell scripts to monitor Cyborg personnel <br>
<x-tab> </x-tab><x-tab> =
</x-tab>load and Krb mapping=
load.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Begin working=
on HR reporting authorizations.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue working on joining HR data and "Who is Teaching What=
data" for <br>
<x-tab> </x-tab>Deans &=
Provost to answer questions about faculty teaching loads.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Worked with CAO and FSS assisting in SAP integration testing: loaded <br>
<x-tab> </x-tab>data into the=
test warehouse for CAO testing.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue working with Giri S. on the web application to display employees'=
MIT card pictures.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>AAUDE<x-tab> </x-tab><br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Deliver 1-day=
training class for AAUDE at COFFEE Conference in Chicago.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Complete AAUDE=
release II analysis, budget, and implementation plans.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Implemented=
and loaded University of Delaware survey data for teaching load and=
expenditures.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Implemented=
and loaded Faculty Profile by CIP.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Refreshed=
"2000 Edition" CIP data.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Cleaned up the=
basic CIP table which includes all CIP codes used in AAUDE.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Loaded=
2002-2003 AAUP Faculty Salary data.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Started=
analysis work on IPEDS Institution Characteristics data.<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Attended=
Annual Conference at Ohio State University (April 29th-May1st).<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Prepared and=
deliver Brio 6 training class for AAUDE at Conference in Ohio.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue loading Student Degree Candidate data.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Worked with ASST to set up and configure 2 second Warehouse Web Server.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue testing of the brio 6 pc installer.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Brio<br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Finished work=
needed for Brio 6 web pages. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Prepared and=
delivered three demos on Brio 6 to the MIT community. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Prepared Brio=
6 classes for CAO. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Prepared =
& delivered Brio 6 class for Lincoln Labs Benefits Office. <br>
<font face=3D"Courier New, Courier"=
size=3D4><x-tab> </x-tab>o<x=
-tab> </x-tab></font>Continue=
working with training & Pubs to identify and create new Brio 6 Classes.=
<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Implemented and loaded mitid_db_person data from the MIT ID database<br>
<x-tab> </x-tab> for the=
Parking & Transportation Office.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Completed and signed off on all DW Team member performance reviews.<br>
<br>
<br>
<br>
<b>Next Month's Plans (May, 2003)<br>
</b><font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab><x-tab=
> </x-tab></font>Continue=
with Web Hits change processing procedures to include a new web <br>
<x-tab> </x-tab><x-tab> =
</x-tab>browser (Mozilla) and a=
couple of new browser versions for Netscape in Web <br>
<x-tab> </x-tab><x-tab> =
</x-tab>Hits reporting. Create 3=
dimension tables for the Web Hits Star/Data Model.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue working with Giri S. on the web application to display employees'=
MIT card pictures.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue AAUDE work<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Begin work on Student Activities Web Reporting Application.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Begin to look into moving the data files around to enhance database=
performance.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue work on EHS Training.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Present work on Project Intersections Team to ASPCC.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Continue work on SAP/HR.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Implement changes to Sloan School of Management Tuition Sharing=
project.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Implement Graduate Admissions Survey data. Implement access control <br>
<x-tab> </x-tab>(using Roles=
Database) on Graduate Admissions data.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab><x-tab=
> </x-tab></font>Continue=
with Brio 6 rollout.<br>
<br>
<br>
<br>
<b>Next Community Milestones:<br>
</b><font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Rollout of Student Activities Web Reporting Application - July 2003.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Rollout of the SAP/HR/CYBORG - September 2003.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Rollout EHS Training Reporting June 2003.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Load summary (by service) MIT Medical data into the DW. On Hold.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Load TLO case data into the DW On Hold.<br>
<font face=3D"Symbol"=
size=3D4>=B7<x-tab> </x-tab></font=
>Load MIT Card Office data (including pictures) into the DW.<br>
<br>