[1044] in I/T Delivery

home help back first fref pref prev next nref lref last post

DW February Status Report

daemon@ATHENA.MIT.EDU (Mary Weisse)
Mon Feb 10 11:38:17 2003

Message-Id: <4.3.2.7.2.20030210113609.017b0810@hesiod>
Date: Mon, 10 Feb 2003 11:42:29 -0500
To: delivery@mit.edu
From: Mary Weisse <mca@MIT.EDU>
Mime-Version: 1.0
Content-Type: multipart/alternative;
	boundary="=====================_14783357==_.ALT"

--=====================_14783357==_.ALT
Content-Type: text/plain; charset="iso-8859-1"; format=flowed
Content-Transfer-Encoding: quoted-printable

Team Name: Data Warehouse
Team Leader: Scott Thorne
Report Date: February  10, 2002
URL: http://web.mit.edu/warehouse/

This month's accomplishments (January, 2003)
=B7       Finished designing tables and loaded data for AAUDE IPEDS Finance.
=B7       Worked with programmer in the Alumni Office to set up access of=20
Alumni biographic,
         address, and degree data by Course/Major.
=B7       Set up the new RCS (Revision Control System) on the new test=
 system=20
(Freewilly).
         Created scripts to check in SQL scripts, table load scripts, shell=
=20
scripts, perl scripts,
         C programs, etc. from different directories to the new RCS.
=B7       Worked with SSIT to load all subject enrollment data to the Data=
=20
Warehouse.
         (i.e. in addition to "registered" subjects, we also load all other=
=20
subject enrollment
         records, including: dropped, advanced placement, transfer.)
=B7       Added academic term and financial aid year fields to the TIME=
 MONTH=20
table.
=B7       Worked with Maria Fernandez (Graduate Award Simplification Task=20
Force) on
         analysis of variances between graduate award and payroll (student=
=20
monthly payroll).
=B7       Tested the new test system (Freewilly).
=B7       Started analysis work on improvements to querying Web hits data.
=B7       Began analyzing and implementing Oracle 8.1.7 functionality.
=B7       Began analyzing database performance issues.
=B7       Began analyzing and trying to resolve Listener problems.
         o        Analyze and try to resolve hung job problem on orca.
         o Analyzed and resolved snapshot too old error on rollback=
 segments.
         o Analyze problem with database link to the Libraries=20
machine  Grammy.
=B7       Worked on creating and populating the Master project History=
 Detail.
         Loaded the amounts for the respective account flags.
=B7       Gave two IAP demos on Brio 6
=B7       Working with IS training team to create several classes for Brio=
 6:=20
there will be at
         least four different classes:
         o        Migrating to Brio 6 for Brio 5 users -- pilot class will=
=20
be February 14
         o Basics 1 & 2 for new users
         o Advanced class for the more sophisticated new features --=20
combining queries etc.
=B7       Continued converting the web queries to Brio 6
=B7       Created an "historic chairs" query for Assistant Deans to help=
 DLCs=20
clean up historic
         HR data if not to be in SAP.
=B7       Began modeling, analyzing, loading EHS person data.
=B7       Continue working on the HR Conceptual data model(s)
=B7       Continued work with the Project Intersections Committee.
=B7       Gave a Data Warehouse demo to the Plasma Science Fusion Center.
=B7       Prepare 2-day training class for AAUDE at AIR Conference in=
 Orlando.
=B7       Designed developed and tested generic problem checking program to=
=20
automate
         detection and send email notification of data=20
problems/inconsistencies as a
         result of data loads.

Next Month's Plans (February, 2003)
=B7               Working on updating the is_terminated_master_project=
 column=20
in the
                 Master project History Detail.
=B7               Begin testing and loading samples of employee pictures (as=
=20
BLOB, Binary
                 Large Object, data type) from MIT Card Office to the test=
=20
database.
=B7       Continued work with SSIT to load pre-registration data to Data=20
Warehouse.
=B7       Continued work with Maria Fernandez on Graduate Award and student=
=20
monthly payroll.
=B7       Continued work with Alumni Office to load employment information=
 of=20
Alumni to Data Warehouse.
=B7       Web Hits: change processing procedure to include a new web browser=
=20
(Mozilla)
         and a couple of new browser versions for Netscape in Web Hits=20
reporting. Will
         also look at why we need to keep two tables which contains the web=
=20
hit detail
         data: webhits_detail and webhits_full_detail.
=B7       Finish converting queries and create a new set of rotating tips=
 for=20
Brio 6.
=B7       After reviewing feedback from Migration class pilot, plan a user=
=20
group demo to
         have ready in addition to W89 classes.
=B7       Begin preparation for three Library classes - one for "button=20
pushers," two longer
         classes for financial and non-financial people (acquisitions and=20
catalog people).
         First class may happen by end of February, if so may also add=20
Library queries to
         web page -- the basic set of queries is almost final, Joan was to=
=20
show them to
         everyone last week and then fine-tune, and discuss with me if she=
=20
needed help
         with anything. She is supposed to give me specs for the classes=20
this week-- what
         queries people want for each class, and how different people might=
=20
want to tweak
         the generic versions that will be on the web, so that I build the=
=20
class exercises around
         what they want.
=B7       Continue developing AAUDE release II analysis and implementation=
=20
plans.
=B7       Continue work on EHS
=B7       Continued work with the Project Intersections Team.
=B7       Work on a specification for an inexpensive web server to house and=
=20
run all the
         Data Warehouse web programs (which are currently on BLUE-GOOSE -=20
which
         is old and being phased out, and ELSA - which is a personal and=20
old Athena workstation).
         o       Web/CGI applications from SNOWDROP to BLUE-GOOSE.
=B7       Prepare a demo for Aero and Astro.
=B7       Deliver 2-day training class for AAUDE at AIR Conference in=
 Orlando.
=B7       Continue work on SAP/HR.
=B7       Complete the HR Conceptual data model(s).

Next Community Milestones:
=B7       Rollout of the SAP/HR/CYBORG - September 2003
=B7       Load TLO case data into the DW  Waiting on TLO.
=B7       Load MIT Card Office data (including pictures) into the DW.


--=====================_14783357==_.ALT
Content-Type: text/html; charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<html>
<b>Team Name</b>: Data Warehouse<br>
<b>Team Leader:</b> Scott Thorne<br>
<b>Report Date:</b> February&nbsp; 10, 2002<br>
<b>URL:</b>
<a href=3D"http://web.mit.edu/warehouse/" eudora=3D"autourl"><font=
 color=3D"#0000FF"><u>http://web.mit.edu/warehouse/</a><br>
<br>
</u></font><b>This month's accomplishments (January, 2003)<br>
</b><font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Finished designing tables and loaded data for AAUDE IPEDS Finance.=
 <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Worked with programmer in the Alumni Office to set up access of=
 Alumni biographic, <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>address, and=
 degree data by Course/Major.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Set up the new RCS (Revision Control System) on the new test system=
 (Freewilly). <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Created=
 scripts to check in SQL scripts, table load scripts, shell scripts, perl=
 scripts, <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>C programs,=
 etc. from different directories to the new RCS. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Worked with SSIT to load all subject enrollment data to the Data=
 Warehouse. <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>(i.e. in=
 addition to &quot;registered&quot; subjects, we also load all other subject=
 enrollment <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>records,=
 including: dropped, advanced placement, transfer.)<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Added academic term and financial aid year fields to the TIME MONTH=
 table. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Worked with Maria Fernandez (Graduate Award Simplification Task=
 Force) on <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>analysis of=
 variances between graduate award and payroll (student monthly payroll).=
 <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Tested the new test system (Freewilly).<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Started analysis work on improvements to querying Web hits data.=
 <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Began analyzing and implementing Oracle 8.1.7 functionality.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Began analyzing database performance issues.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Began analyzing and trying to resolve Listener problems.
<dl><font face=3D"Courier New, Courier">
<dd><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o<x-tab>&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab> </font>Analyze and try to=
 resolve hung job problem on orca.=20
</dl><font face=3D"Courier New,=
 Courier"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o=
 </font>Analyzed and resolved snapshot too old error on rollback segments.=
 <br>
<font face=3D"Courier New,=
 Courier"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o=
 </font>Analyze problem with database link to the Libraries machine&nbsp;=
 Grammy. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Worked on creating and populating the Master project History Detail.=
 <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Loaded the=
 amounts for the respective account flags. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Gave two IAP demos on Brio 6<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Working with IS training team to create several classes for Brio 6:=
 there will be at <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>least four=
 different classes:
<dl><font face=3D"Courier New, Courier">
<dd><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o<x-tab>&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font> Migrating to Brio 6=
 for Brio 5 users -- pilot class will be February 14
</dl><font face=3D"Courier New,=
 Courier"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o=
 </font>Basics 1 &amp; 2 for new users<br>
<font face=3D"Courier New,=
 Courier"><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o=
 </font>Advanced class for the more sophisticated new features -- combining=
 queries etc. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued converting the web queries to Brio 6<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Created an &quot;historic chairs&quot; query for Assistant Deans to=
 help DLCs clean up historic <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>HR data if=
 not to be in SAP.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Began modeling, analyzing, loading EHS person data.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue working on the HR Conceptual data model(s)<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued work with the Project Intersections Committee.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Gave a Data Warehouse demo to the Plasma Science Fusion Center.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Prepare 2-day training class for AAUDE at AIR Conference in=
 Orlando.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Designed developed and tested generic problem checking program to=
 automate <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>detection and=
 send email notification of data problems/inconsistencies as a <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>result of=
 data loads.<br>
<br>
<b>Next Month's Plans (February, 2003)<br>
</b><font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Worki=
ng on updating the is_terminated_master_project column in the <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Master project History=
 Detail. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Begin=
 testing and loading samples of employee pictures (as BLOB, Binary <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><x-tab>&nbsp;=
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Large Object, data type)=
 from MIT Card Office to the test database.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued work with SSIT to load pre-registration data to Data=
 Warehouse. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued work with Maria Fernandez on Graduate Award and student=
 monthly payroll.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued work with Alumni Office to load employment information of=
 Alumni to Data Warehouse.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Web Hits: change processing procedure to include a new web browser=
 (Mozilla) <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>and a couple=
 of new browser versions for Netscape in Web Hits reporting. Will <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>also look at=
 why we need to keep two tables which contains the web hit detail <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>data:=
 webhits_detail and webhits_full_detail.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Finish converting queries and create a new set of rotating tips for=
 Brio 6.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>After reviewing feedback from Migration class pilot, plan a user=
 group demo to <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>have ready in=
 addition to W89 classes.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Begin preparation for three Library classes - one for &quot;button=
 pushers,&quot; two longer <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>classes for=
 financial and non-financial people (acquisitions and catalog people). <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>First class=
 may happen by end of February, if so may also add Library queries to <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>web page --=
 the basic set of queries is almost final, Joan was to show them to <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>everyone last=
 week and then fine-tune, and discuss with me if she needed help <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>with=
 anything. She is supposed to give me specs for the classes this week-- what=
 <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>queries=
 people want for each class, and how different people might want to tweak=
 <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>the generic=
 versions that will be on the web, so that I build the class exercises=
 around <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>what they=
 want.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue developing AAUDE release II analysis and implementation=
 plans. <br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue work on EHS<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continued work with the Project Intersections Team.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Work on a specification for an inexpensive web server to house and=
 run all the <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>Data=
 Warehouse web programs (which are currently on BLUE-GOOSE - which <br>
<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>is old and=
 being phased out, and ELSA - which is a personal and old Athena=
 workstation).=20
<dl><font face=3D"Courier New, Courier">
<dd><x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab>o<x-tab>&=
nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab></font>Web/CGI applications=
 from SNOWDROP to BLUE-GOOSE.
</dl><font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Prepare a demo for Aero and Astro.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Deliver 2-day training class for AAUDE at AIR Conference in=
 Orlando.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Continue work on SAP/HR.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Complete the HR Conceptual data model(s).<br>
<br>
<b>Next Community Milestones:<br>
</b><font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Rollout of the SAP/HR/CYBORG - September 2003<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Load TLO case data into the DW&nbsp; Waiting on TLO.<br>
<font=
 face=3D"Symbol">=B7<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab=
></font>Load MIT Card Office data (including pictures) into the DW.<br>