![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
To: athena-backup-mtg@menelaus.MIT.EDU Date: Thu, 30 Jun 1994 16:43:07 EDT From: Jonathon Weiss <jweiss@MIT.EDU> The WBS tim refers to is transaction 5 of this meeting. ------- Forwarded Message Received: from MIT.MIT.EDU by e40-po.MIT.EDU (5.61/4.7) id AA21118; Thu, 30 Jun 94 16:26:02 EDT Received: from NEGRIL.MIT.EDU by MIT.EDU with SMTP id AA09074; Thu, 30 Jun 94 16:26:01 EDT Message-Id: <9406302026.AA09074@MIT.EDU> Date: Thu, 30 Jun 94 16:25:33 From: tjm@MIT.EDU (Tim McGovern) To: jweiss@MIT.EDU, delgado@MIT.EDU, dkk@MIT.EDU, salemme@MIT.EDU Subject: Re-starting the Athena Backup System Project... Cc: kim@MIT.EDU [JW: Once the discuss meeting is up, this can go in as well...] Today, we re-constituted the team for the project that we now call the Athena Backup System project. We assessed where we were, and then mapped out where we are going in the short-term. Here are the results of our first meeting. 1. The Team... Project Leader: Tim McGovern Sr. Technical/Designer: Diane Delgado Programmer: Jonathon Weiss Customer Representatives: Anne Salemme David Krikorian (not present) For lack of anything better, we agreed to use the Work Breakdown Structure (WBS) that Jonathon had previously developed, and which has been posted to the discuss meeting as transaction [0000]. 2. Where are we... Using the WBS, we determined that we have - completed the REQUIREMENTS phase - written a HIGH LEVEL DESIGN document, but it needs to be reviewed again by the team, and then with key DCNS technical experts. In the course of coming to this conclusion, we identified a number of the key issues that we need to resolve. The action items that resulted from that discussion are listed below. 3. Where are we going (short-term)... Our goal is to produce a demo-able prototype of the new system as soon as possible. To do that, we first need to finalize a HIGH LEVEL DESIGN document. With that done, we will be able to fine-tune the WBS in the area of LOW LEVEL DESIGN and then move quickly to code the prototype. 4. Action Items a1. Anne will provide a demo of the current system to Diane a2. Anne will provide information on the Sun backup product Co-Pilot to the team...as background for our own work. We are NOT opposed to a purchased solution, but don't expect there will be a good fit with our requirements. a3. Diane will review the existing draft of the HIGH LEVEL DESIGN, and produce for the team's review a revised DESIGN before our next meeting. a4. Jonathon will establish a mailing list/discuss meeting for this project, and populate the the discuss meeting with the documents that have already been created. a5. Anne will ask the net about tools that might be more versative than dbm, but still not in the Ingres/Oracle class of products, for storing the various kinds of dbs that we need for this service. a6. Anne will brief David on the results of the meeting. 5. Next Meeting July 14, 1994 1:30 E40-316. ------- End of Forwarded Message
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
home | help | back | first | fref | pref | prev | next | nref | lref | last | post |