[5] in Athena_Backup_System
WBS for backup system
daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Thu Jun 30 16:38:16 1994
To: athena-backup-mtg@menelaus.MIT.EDU
Date: Thu, 30 Jun 1994 16:38:08 EDT
From: Jonathon Weiss <jweiss@MIT.EDU>
Originally sent on: Fri, 1 Apr 1994 16:33:29 -0500
Here's a transcription of my Post-it's of the WBS for the backup
system. It's not an absolute transcription, I refined a couple of
parts, but I suspect that's a good thing. I'm connerned that there
may be a component or two missing from the low level design and coding
phases. Anyway here it is.
Jonathon
- ----------------------
AFS Backup System Work Breakdown Structure
project management
create scope statement
write WBS
report on status
hold meetings
allocate time for staffing changes
requirements list
interview people
draft req.
solicit feedback (hold req. review)
incorporate changes
iterate drafts feedback and incorporation
deliver requirements
high level design
research and chose technology
create conceptual model
create data flow diagrams
draft doc.
solicit feedback
incorporate chances
iterate draft/feedback/incorporate
deliver high level design
low level design
refine models
design API
client/coordinator protocol
coordinator/dump-server protocol
design clients
client A
client B
client C
???
design coordinating server
design DB
design scheduler
design dump server
demo-able prototype
determine prototype function
plan prototype
code prototype
client/coord. comm. protocol
coord./d-s protocol
client A
scheduler
dump server
test prototype
plan/setup demo
demo prototype
solicit feedback
incorporate changes
coded system
code
client B
client C
database
re-visit prototype code
debugging
clients
protocols
servers
tested system
create test plan
write test suites
internal testing
unit testing
clients
coord server
dump server
system testing
customer testing
documentation
write operator documentation (man pages)
write tech. overview
training
design training
conduct training