| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
To: sapr3-soft@MIT.EDU Date: 09 Jan 1997 From: piraccim@aol.com (PIRACCIM) (by way of SAP Moderator <piraccim@aol.com>) If you mean can SAP handle dates in the year 2000, the answer I believe is yes. However, I can't speak for SAP R/2 (mainframe I believe), but a four digit year is available with SAP R/3.
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |