[68675] in Hotline Meeting
Bldg. 56 - Emergency Heating Hot Water Shutdown
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Oct 2 13:07:08 2003
Message-ID: <568F0AEE7A57D511923900508B55645103D71AB2@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@plant.mit.edu>
To: "'swetzel@mit.edu'" <swetzel@mit.edu>,
"'haverty@mit.edu'"
<haverty@mit.edu>,
"'sorrento@mit.edu'" <sorrento@mit.edu>,
"'shutdowns@mit.edu'" <shutdowns@mit.edu>,
"'dcosta@mit.edu'"
<dcosta@mit.edu>,
"'johnnyd@mit.edu'" <johnnyd@mit.edu>,
Shawn Smith
<SJSmith@plant.mit.edu>,
"'crendog@mit.edu'" <crendog@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
"'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
Operators
<Operators@plant.mit.edu>, A-Zone <A-Zone@mit.edu>
Date: Thu, 2 Oct 2003 13:05:00 -0400
> To: swetzel@mit.edu; haverty@mit.edu; sorrento@mit.edu;
> shutdowns@mit.edu; dcosta@mit.edu; johnnyd@mit.edu; Shawn Smith;
> crendog@mit.edu
> Cc: shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators; A-Zone
> Subject: Bldg. 56 - Emergency Heating Hot Water Shutdown
>
>
The following emergency heating hot water shutdown for Bldg. 56 - 3rd floor
on Friday, October 3 is for your information.
Thank you.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Emergency
> Building: 56 - 3rd floor
> Date: 10/3/2003
> Day: Friday
> Time: 7 AM - 3 PM
> System: Heating Hot Water
> Duration: 8 hours
> Reason:
> Leak in Main.
>
> Effect:
> Loss of heating hot water (perimeter building heat - where radiators are
> located) in Bldg. 56 - 3rd floor only during the 8-hour emergency shutdown
> period.
>
>