[68675] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Bldg. 56 - Emergency Heating Hot Water Shutdown

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Oct 2 13:07:08 2003

Message-ID: <568F0AEE7A57D511923900508B55645103D71AB2@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@plant.mit.edu>
To: "'swetzel@mit.edu'" <swetzel@mit.edu>,
        "'haverty@mit.edu'"
	 <haverty@mit.edu>,
        "'sorrento@mit.edu'" <sorrento@mit.edu>,
        "'shutdowns@mit.edu'" <shutdowns@mit.edu>,
        "'dcosta@mit.edu'"
	 <dcosta@mit.edu>,
        "'johnnyd@mit.edu'" <johnnyd@mit.edu>,
        Shawn Smith
	 <SJSmith@plant.mit.edu>,
        "'crendog@mit.edu'" <crendog@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
        "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
        Operators
	 <Operators@plant.mit.edu>, A-Zone <A-Zone@mit.edu>
Date: Thu, 2 Oct 2003 13:05:00 -0400 

> To: 	swetzel@mit.edu; haverty@mit.edu; sorrento@mit.edu;
> shutdowns@mit.edu; dcosta@mit.edu; johnnyd@mit.edu; Shawn Smith;
> crendog@mit.edu
> Cc: 	shutdown@plant.mit.edu; rm-shutdown@mit.edu; Operators; A-Zone
> Subject: 	Bldg. 56 - Emergency Heating Hot Water Shutdown
> 
> 
The following emergency heating hot water shutdown for Bldg. 56 - 3rd floor
on Friday, October 3 is for your information.

Thank you.

Andrea Nichols
Repair and Maintenance
8-7872

> Status: Emergency
> Building: 56 - 3rd floor
> Date: 10/3/2003
> Day: Friday
> Time: 7 AM - 3 PM
> System: Heating Hot Water
> Duration: 8 hours
> Reason: 
> Leak in Main.
> 
> Effect: 
> Loss of heating hot water (perimeter building heat - where radiators are
> located) in Bldg. 56 - 3rd floor only during the 8-hour emergency shutdown
> period.
> 
> 

home help back first fref pref prev next nref lref last post