[60373] in Hotline Meeting
Power outage in bldgs. 11,1,3,10.
daemon@ATHENA.MIT.EDU (Christopher Gilbert)
Thu Jul 18 21:20:06 2002
Message-ID: <568F0AEE7A57D511923900508B55645101A83D98@PLANT.MIT.EDU>
From: Christopher Gilbert <cgilbert@PLANT.MIT.EDU>
To: "'plant-notify@mit.edu'" <plant-notify@mit.edu>
Date: Thu, 18 Jul 2002 21:18:40 -0400
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
At approximately 1834 on 7/18. there was a power outage in the following
bldgs. 11,1,3, and 10. Eupremio Piccinonno was called in to assist as a
high voltage electrician. At 2040, power was restored to the buildings.
Cause of the power interruption was a tripped breaker ( 400 Amp Main ) in
the new switchgear high voltage room. Refer to Maximo # 175758
@1834, DGP Trouble came in to alarm. Power interruption
@1834, Broadcast all via radio and paging interface.
@1835, Units 70, 33 , and 4 responding.
@1840, Unit 70 reports that the trouble on the panel in Bldg.10
@1840, Called power plant and they stated that there had not been a problem
on their end.
@1840, Called N Star and they stated that they had not had a problem on
their end..
@1915, Unit 4 requests high voltage electrician called in, Eupo is coming
in.
@1958, Eupo on site.
@2040, Power has been restored/ Cause of outage was a tripped breaker ( 400
Amp Main ) in the new switchgear high voltage room.
Ops Ctr.