Bldgs. E17, E19 and E18 Rescheduled Critical Sul-Air Control Air
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Jan 4 14:51:01 2002
Message-ID: <568F0AEE7A57D511923900508B5564511561B0@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'kshooter@mit.edu'" <kshooter@mit.edu>,
"'kmillign@mit.edu'"
<kmillign@mit.edu>,
"'lsanto@mit.edu'" <lsanto@mit.edu>,
"'schedule@mit.edu'" <schedule@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'wardd@mit.edu'" <wardd@mit.edu>,
"'jmganno@mit.edu'" <jmganno@mit.edu>,
"'lombardo@mit.edu'"
<lombardo@mit.edu>,
"'sdalton@mit.edu'" <sdalton@mit.edu>
Cc: "'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
E-Zone
<E-Zone@mit.edu>, Mary Tobin <mtobin@PLANT.MIT.EDU>
Date: Fri, 4 Jan 2002 14:50:57 -0500
MIME-Version: 1.0
Content-Type: text/plain
> To: kshooter@mit.edu; kmillign@mit.edu; lsanto@mit.edu;
> schedule@mit.edu; shutdowns@mit.edu; wardd@mit.edu; jmganno@mit.edu;
> lombardo@mit.edu; sdalton@mit.edu
> Cc: shutdown@plant.mit.edu; E-Zone; Mary Tobin
> Subject: Bldgs. E17, E19 and E18 Rescheduled Critical Sul-Air Control
> Air Shutdown Request
>
>
The following rescheduled Critical shutdown request for Bldgs. E17 - all
floors, E18-CRC only and E19 - 4th floor only now on Thursday, 1/10 is for
your information and comment. Would you please let me know whether this
does or does not meet with your approval.
Thanks very much.
Andrea Nichols
Repair and Maintenance
8-7872
> Status: Critical
> Building: E17, E19 - 4th floor only and E18 - CRC only
> Date: 1/10/2002
> Day: Thursday
> Time: 8 AM - 9 AM
> System: Sul-Air Control Air
> Duration: 1 hour
> Reason:
> High pressure air leak.
>
> Effect:
> Loss of chilled water (air conditioning) heating hot water (for
> buildings), supply ventilation (air from outside), supply cooling (from
> ceiling supply fans), supply heating (from ceiling supply fans),
> compressed control air which affects all of the afore-mentioned systems
> and buildings during the 1-hour shutdown period.
>
>