[54962] in Hotline Meeting
Bldgs. E19, E18 and E18 - Elevator Service
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu May 10 13:14:08 2001
Message-ID: <82F0D564C5ADD31180EF00508B556451BD2412@PLANT.MIT.EDU>
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'bengel@mit.edu'" <bengel@mit.edu>,
"'cschultz@mit.edu'"
<cschultz@mit.edu>,
"'dcairns@mit.edu'" <dcairns@mit.edu>,
"'dlking@mit.edu'" <dlking@mit.edu>, "'dshea@mit.edu'" <dshea@mit.edu>,
"'dturn@mit.edu'" <dturn@mit.edu>, E-Zone <E-Zone@mit.edu>,
"'e19site@mit.edu'" <e19site@mit.edu>,
"'elsagt@mit.edu'"
<elsagt@mit.edu>,
"'esico@mit.edu'" <esico@mit.edu>,
"'hallisey@mit.edu'" <hallisey@mit.edu>,
"'honiker@mit.edu'"
<honiker@mit.edu>,
"'joconor@mit.edu'" <joconor@mit.edu>,
"'kelley@mit.edu'" <kelley@mit.edu>,
"'kshooter@mit.edu'"
<kshooter@mit.edu>,
"'lambert@mitvma.mit.edu'" <lambert@mitvma.mit.edu>,
"'mbowers@mit.edu'" <mbowers@mit.edu>,
Michael Sherman
<MSherman@PLANT.MIT.EDU>,
Mary Tobin <mtobin@PLANT.MIT.EDU>,
"'narbonne@MIT.EDU'" <narbonne@mit.edu>,
"'opsnote@mit.edu'"
<opsnote@mit.edu>,
"'rberlin@mit.edu'" <rberlin@mit.edu>,
"'safety@mit.edu'" <safety@mit.edu>,
"'sfalconi@mit.edu'"
<sfalconi@mit.edu>,
Steve Miscowski <SMiscows@PLANT.MIT.EDU>,
"'tdalton@mit.edu'" <tdalton@mit.edu>,
"'tmeehan@mit.edu'"
<tmeehan@mit.edu>,
"'wbarrett@mit.edu'" <wbarrett@mit.edu>,
"'wganger@mit.edu'" <wganger@mit.edu>,
"'shutdowns@mit.edu'"
<shutdowns@mit.edu>,
"'opsnote@mit.edu'" <opsnote@mit.edu>,
"'lsanto@mit.edu'" <lsanto@mit.edu>,
Operators <Operators@PLANT.MIT.EDU>,
"'cp-command@mit.edu'" <cp-command@mit.edu>
Cc: "'rm-shutdown@mit.edu'" <rm-shutdown@mit.edu>,
"'mmahoney@mit.edu'"
<mmahoney@mit.edu>,
"'shutdown@plant.mit.edu'" <shutdown@PLANT.MIT.EDU>,
RM-Support <RM-Support@mit.edu>
Date: Thu, 10 May 2001 13:13:50 -0400
MIME-Version: 1.0
Content-Type: text/plain;
charset="iso-8859-1"
Dear Everyone:
This is to inform you that due to the asbestos removal work being done in
E19 - 6th floor on Friday, 5/11 up to and including Sunday, 5/13 (from 5 PM
to 12 noon) the Main Street elevator in Bldg. E19 will be closed during that
time period. The elevators in E18 and E17 (Ames Street side) will be
operational however. Signs will be posted at the elevators prior to the
shutdown.
Thank you.
Paul Motroni
Facilities Department
Supervisor/Coach
Repair and Maintenance/E-Zone
pmotroni@plant.mit.edu;