[46243] in Hotline Meeting

home help back first fref pref prev next nref lref last post

RE: Bldg. 68 - All Emergency Power System - 2/17 Shutdown Request

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Wed Dec 30 13:07:14 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'jfucillo@mit.edu'" <jfucillo@MIT.EDU>,
        "'jmganno@mit.edu'"
	 <jmganno@MIT.EDU>,
        "'tomlynch@mit.edu'" <tomlynch@MIT.EDU>,
        "'shyoung@mit.edu'" <shyoung@MIT.EDU>
Cc: Shutdown <Shutdown@PLANT.MIT.EDU>,
        "'shutdowns@mit.edu'"
	 <shutdowns@MIT.EDU>,
        "'opsnote@mit.edu'" <opsnote@MIT.EDU>
Date: Wed, 30 Dec 1998 13:04:59 -0500

Update --
I just found out that the "momentary" outage will occur at the beginning
of this shutdown and at the end as well. This means that all of the
services that will be affected below -- will be affected on a momentary
basis only. Otherwise --everything will be operating as usual during the
shutdown.

I hope this clarifies the matter. If not, please feel free to contact
me.
Thanks again.

Andrea Nichols
>  
> The following shutdown request for Bldg. 68 - All on 2/17 is for your
> review and comment. Would you please let me know whether or not this
> has
> your approval.
> 
> Thank you.
> 
> Andrea Nichols
> Operations Center
> 8-7872
> 
> > Status: Normal
> > Building: 68 - Entire Building Including Animal Quarters
> > Date: 2/17/98
> > Day: Wednesday
> > Time: 7 AM - 3 PM
> > System: Emergency Power (emergency lighting, elevators, animal care
> > area, HVAC equipment, exhaust fans, outlets in labs.
> > Duration: 8 hours (outages - one at around 7 AM and the other at
> around 3 PM)
> > Reason: 
> > To test emergency generator - which will be momentary during the
> > 8-hour shutdown.
> > 
> > Effect: 
> > The effect will be a momentary loss of emergency power as the
> > automatic transfer switch (ATS) transfers from Normal power to
> > Emergency power at the beginning of the test.
> > There will be another identical momentary shutdown at the end of the
> > test as the ATS transfers back to Normal power.
> > The effects to the Animal care Facility in the sub-basement will be
> > more lengthy as HVAC equipment cycles through programs that keep it
> > off longer.
> > There are many labs throughout the building with emergency outlets
> > that will have the momentary outages described above. (Loss of
> Power:
> > Emergency Generator, emergency power, elevators, telephones and
> > corridors/stairs; Water: heating hot water; air:  Supply cooling,
> > supply heating, exhaust general air to entire building including
> > Animal Quarters.
> 
> 