Bldgs. 50 and 51 Electric Power and Lighting Shutdown Request for
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Fri Nov 20 11:50:12 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mwf@mit.edu'" <mwf@MIT.EDU>, "'shutdowns@mit.edu'"
<shutdowns@MIT.EDU>,
"'pdc@mit.edu'" <pdc@MIT.EDU>,
"'management@wmbr.mit.edu'" <management@TURNTABLE.MIT.EDU>,
"'eisenmann@mit.edu'" <eisenmann@MIT.EDU>,
"'sailing@mit.edu'"
<sailing@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'opsnote@mit.edu'" <opsnote@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Fri, 20 Nov 1998 11:49:04 -0500
> To: mwf@mit.edu; shutdowns@mit.edu; pdc@mit.edu;
> management@wmbr.mit.edu; eisenmann@mit.edu; sailing@mit.edu;
> shutdowns@mit.edu; opsnote@mit.edu
> Cc: shutdown@plant.mit.edu
> Subject: Bldgs. 50 and 51 Electric Power and Lighting Shutdown
> Request for 12/1
>
>
The following electric power and lighting for Bldgs. 50 and 51 on 12/1
is for your information and comment. Would you please let me know
whether or not this meets with your approval.
Thanks very much.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: 50 and 51
> Date: 12/1/98
> Day: Tuesday
> Time: 3:30 AM - 5:00 AM
> System: All Electric Power & Lighting
> Duration: 1 1/2 hours
> Reason:
> To install new main breaker and perform metering upgrades.
>
> Effect:
> Loss of Power: access controls, building power, elevators, computers,
> telephones, lighting; Water: hot domestic water pumps (water for
> kitchen and bathroom sinks), heating hot water pumps (heating); Air:
> supply ventilation, supply cooling, supply heating,
> exhaust-laboratory, exhaust-general, exhaust-toilet and compressed
> control air.
>
>