Rescheduled W20-204 thru 206 and 316 thru 326 Shutdown Request fo

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Aug 20 11:11:52 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'mwf@mit.edu'" <mwf@MIT.EDU>, "'pdc@mit.edu'" <pdc@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Thu, 20 Aug 1998 11:05:34 -0400

> To: 	mwf@mit.edu; pdc@mit.edu; shutdowns@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Rescheduled W20-204 thru 206 and 316 thru 326 Shutdown
> Request for 8/25
> 
> 
The following revised shutdown for Bldg. W20 - 204 thru 206 and 316 thru
326 on 8/25 is for your information and comment. This shutdown applies
to the above listed rooms only - this will not affect Athena and the
entire building does not have to be drained down. Kevin Connolly would
like to do this work during the day if at all possible.

Would you please let me know if this meets with your approval or not.

Thanks very much.

Andrea Nichols
Operations Center
8-7872

> Status: Normal
> Building: W20-204 thru 206 & 316 thru 326
> Date: 8/25/98
> Day: Tuesday
> Time: 7:00 AM - 11:00 AM
> System: Chilled Water
> Duration: 4 hours
> Reason: 
> Repair leak on pipe in main computer cell.
> 
> Effect: 
> Loss of chilled water (air conditioning) in the above listed rooms
> (networks, Toscanini's, Lobdell Dining Hall and 3rd Floor Southeast.
> 
> 