Requested Critical Shutdown - Bldg. NW21 - TARA - 5/6
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon May 5 11:41:19 1997
Date: Mon, 5 May 1997 11:39 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: fulton@psfc.mit.edu, shutdowns@MIT.EDU, d-zone@MIT.EDU
X-Envelope-To: d-zone@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"fulton@psfc.mit.edu, shutdowns@mit.edu, d-zone@mit.edu"
The following requested critical shutdown for Bldg. NW21 - TARA on 5/6
is for your information and comment. Would you please let me know if
this has your approval or not.
Thank you.
Andrea Nichols
Operations Center
8-7872
Building: NW21 - TARA - entire building with exception of
labs/rooms with dedicated cooling units.
System: Air Handler 1, Supply Fans 1 and 2
Date: 5/6
Day: Tuesday
Time: 4:00 PM - 9:00 AM
Duration: 5 hours
Reason: To repair chilled water coils (continuation of cooling
coil repairs)
Effect: Loss of air conditioning and ventilation for entire
building with exception of labs/rooms with dedicated cooling
units. This should be final phase of work. Air
conditioning and supply ventilation should be fully operational
on 5/7.