[38093] in Hotline Meeting
Requested Shutdowns - Bldg. 66 - 5/5
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Wed Apr 30 13:25:21 1997
Date: Wed, 30 Apr 1997 13:24 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: lindlore@MIT.EDU, shutdowns@MIT.EDU
X-Envelope-To: lindlore@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"lindlore@mit.edu, shutdowns@mit.edu"
The following requested shutdowns for Bldg. 66 on 5/5 are for your
information and comment. Would you please let me know if these have
your approval or not.
Thanks very much.
Andrea Nichols
Operations Center
8-7872
Building: 66 - all rooms in basement and subbasement
System: Air Handler 7 (supply ventilation and cooling)
Date: 5/5
Day: Monday
Time: 8:00 AM - 2:00 PM
Duration: 6 hours
Reason: Repairs to chill (air conditiong) coil
Effect: Loss of supply ventilation and cooling during shutdown
period
Building: 66 - all labs on floors 1 thru 5 North
System: Air Handler 1 (supply ventilation and cooling)
Date: 5/5
Day: Monday
Time: 4:00 PM - 9:00 PM
Duration: 5 hours
Reason: Remove air and moisture deflector - repair coil.
Effect: Loss of supply ventilation and cooling during shutdown
period.