[36461] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Rescheduled Requested Shutdown - Bldg. 2 - Now for 1/25

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Jan 14 09:25:05 1997

Date: Tue, 14 Jan 1997 09:22 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, c-zone@MIT.EDU, duggins@MIT.EDU,
        capozzi@math.mit.edu, nolan@math.mit.edu, var@MIT.EDU, mbj@MIT.EDU,
        daisymae@MIT.EDU
X-Envelope-To: c-zone@mit.edu, daisymae@mit.edu, duggins@mit.edu, mbj@mit.edu,
 schedule@mit.edu, shutdowns@mit.edu, var@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, schedule@mit.edu, c-zone@mit.edu, duggins@mit.edu, capoz
   zi@math.mit.edu, nolan@math.mit.edu, var@mit.edu, mbj@mit.edu, daisymae@mit.e
   du"

The following rescheduled requested shutdown for Bldg. 2 formerly for 1/18
and now for 1/25 is for your information and comment. This is going to
be a huge operation, new pipes will be brought in, laid out, volumes of water
will be flushed through -- all designed to enhance the operation of the
system.   Would you please let me know if this has your approval or not.

Thank you.

Andrea Nichols
Operations Center
8-7872

Building:       2
System:         All chilled water cooling--both process and climate
                control.
Date:           1/25/97 (formerly 1/18)
Day:            Saturday
Time:           6:00 AM - 8:00 PM
Duration:       14 hours
Reason:         Basement chilled water pumping station discharge piping
                alterations within 2-006.
Effect:         Loss of chilled water and cold lab process water via
                chilled/Hx: ex. lasar cooling.



home help back first fref pref prev next nref lref last post