[36088] in Hotline Meeting
Re: Rescheduled Requested Critical Shutdown - Bldg. W20 - 5th floor -12/14
daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Fri Dec 6 18:56:02 1996
From: Jonathon Weiss <jweiss@MIT.EDU>
To: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
Cc: shutdowns@MIT.EDU, mwf@MIT.EDU, jweiss@MIT.EDU, dcns-cluster@MIT.EDU,
ops@MIT.EDU, network@MIT.EDU
In-Reply-To: Your message of "Fri, 06 Dec 1996 15:22:00 EDT."
<01ICP0G6LC008X773L@MITPPL.BITNET>
Date: Fri, 06 Dec 1996 18:55:54 EST
> The following rescheduled critical shutdown request for W20 for 12/14
> or 12/21 is for your information and comment. Would you please let me know if
> this has your approval or not.
I still need to know if this is going to affect w20-575a. Since that
room ahs 2 large units in it, aand you are talking about shuting down
an air Handeler, not chilled water, I suspect it isn't, but I need you
to confirm that. If that room is affected, things are more
complicated. If the units in that room will continue to function,
then I will defer to Brian Murphy (although I suspect usage of the
room will be significantly lower, on the 21st, since most students
will have left for break). If w20-575a is going to be affected, I
need to remain in the loop.
Jonathon
>
> I spoke with Mr. Murphy about this, he said that if someone were on
> site such as JJ, he would have no problem with this. It would also be
> very helpful if Physical Plant brought in a huge fan to assist with the
> cooling of W20-575. But he would go along with what "operations" was
> comfortable with.
>
> Thanks very much and I look forward to hearing from you.
>
> Andrea Nichols
> Operations Center
> 8-7872
>
> Building: W20 - 5th Floor East & 5th Floor Athena Room
> System: Air Handler 9
> Date: 12/14 or 21/96
> Day: Saturday
> Time: 6:00 AM - 2:00 PM
> Duration: 8 hours or less
> Reason: Repair steam leak of reheat and preheat coil system
> Effect: Loss of supply ventilation, cooling and heating during
> shutdown period.
>
>