[36086] in Hotline Meeting
Rescheduled Requested Critical Shutdown - Bldg. W20 - 5th floor -12/14
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Dec 6 15:24:48 1996
Date: Fri, 6 Dec 1996 15:22 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, mwf@MIT.EDU, jweiss@MIT.EDU, dcns-cluster@MIT.EDU,
ops@MIT.EDU, network@MIT.EDU
X-Envelope-To: dcns-cluster@mit.edu, jweiss@mit.edu, mwf@mit.edu,
network@mit.edu, ops@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, mwf@mit.edu, jweiss@mit.edu, dcns-cluster@mit.edu, ops@m
it.edu, network@mit.edu"
The following rescheduled critical shutdown request for W20 for 12/14
or 12/21 is for your information and comment. Would you please let me know if
this has your approval or not.
I spoke with Mr. Murphy about this, he said that if someone were on
site such as JJ, he would have no problem with this. It would also be
very helpful if Physical Plant brought in a huge fan to assist with the
cooling of W20-575. But he would go along with what "operations" was
comfortable with.
Thanks very much and I look forward to hearing from you.
Andrea Nichols
Operations Center
8-7872
Building: W20 - 5th Floor East & 5th Floor Athena Room
System: Air Handler 9
Date: 12/14 or 21/96
Day: Saturday
Time: 6:00 AM - 2:00 PM
Duration: 8 hours or less
Reason: Repair steam leak of reheat and preheat coil system
Effect: Loss of supply ventilation, cooling and heating during
shutdown period.