Requested Shutdown - Bldg.4 - 034 through 040 - 9/19 & 9/20

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Mon Sep 16 16:08:36 1996

Date: Mon, 16 Sep 1996 16:02 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, nhannulla@mitvaps.mit.edu
X-Envelope-To: shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, nhannulla@mitvaps.mit.edu"

The following information is for your review. Would you please let me
know if this shutdown is acceptable or unacceptable.

Thanks very much.

Andrea Nichols
Operations Center
8-6651

Building:       4-034 through 040
System:         Sprinkler
Date:           9/19 & 9/20
Day:            Thursday and Friday
Time:           7:30 AM - 2:00 PM each day
Duration:       6 1/2 hours each day
Reason:         Tie into existing sprinkler system
Effect:         Loss of fire protection water during the shutdown
                period. The Safety Office will be notified of this. This
                office will then notify the Cambridge Fire Department.