[34554] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Requested Shutdown - Bldg. 66 - Floors 1 through 5 North

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Aug 30 11:26:51 1996

Date: Fri, 30 Aug 1996 11:21 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, lindlore@MIT.EDU
X-Envelope-To: lindlore@mit.edu, schedule@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, schedule@mit.edu, lindlore@mit.edu"

The following information which pertains to the requested shutdown of Bldg.
66 - Labs floors 1 through 5 North is for your review. Would you please
let me know if this shutdown is either acceptable or unacceptable.

Thanks very much.

Andrea Nichols
Operations Center
8-6651

Building:       66 - Labs - floors 1 through 5 North
System:         Air handler 1 and 1A
Date:           9/5/96
Day:            Thursday
Time:           8:00 AM - 12 noon
Duration:       4 hours
Reason:         To repair variable speed drive
Effect:         Loss of supply ventilation, cooling and heating in
                rooms - 125, 153, 157, 165; 221, 225, 229, 257, 263
                and 265; 321, 325, 353 and 357; 408, 421, 425, 453,
                457, 463 and 465; 508, 519, 521, 525, 553, 557 and
                565.


home help back first fref pref prev next nref lref last post