The following information is for your review. Would you please let me
know if this critical shutdown is acceptable or unacceptable.
Thanks.
Andrea Nichols
Operations Center
8-6651 or return
e-mail
Building: 66 - Floors 1-5 North - Room Nos. 125 to 165A; 221A to
217, 225A to 265A; 317, 321, 319, 325 to 369; 408, 421, 419,
425 to 471; 508 to 521, 519, 525 to 571
System: Air Handler 1 - Supply Fan 1A
Date: 8/19/96
Day: Monday
Time: 7:00 AM - 3:00 PM
Duration: 8 hours
Reason: Motor bearings to be replaced. Heavy motor rattling.
Effect: Air Handler 1 and Supply Fan 1A has two fans. Partial
ventilation will be maintained (Supply Fan 1B will
remain on.)