Approved Shutdown - W13, W15, 41, 41A, 17, 35 and 31
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Jun 28 13:35:01 1996
Date: Fri, 28 Jun 1996 13:29 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsote@MIT.EDU, dcarlson@MIT.EDU, cappuci@MIT.EDU,
mmahoney@MIT.EDU, cust-coach@MIT.EDU, pwalsh@MIT.EDU, wpwohlfa@MIT.EDU,
d-zone@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: cappuci@mit.edu, cust-coach@mit.edu, d-zone@mit.edu,
dcarlson@mit.edu, mmahoney@mit.edu, opsote@mit.edu, pwalsh@mit.edu,
sdverify@mit.edu, shutdowns@mit.edu, wpwohlfa@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, opsote@mit.edu, dcarlson@mit.edu, cappuci@mit.edu, mmaho
ney@mit.edu, cust-coach@mit.edu, pwalsh@mit.edu, wpwohlfa@mit.edu, d-zone@mit
.edu, sdverify@mit.edu"
The following approved shutdown is for your information.
Andrea Nichols
Operations Center
8-6651
Building: W13, W15, 41, 41A, 17, 35 and 31
System: All normal electrical power; steam will need to be
secured in affected buildings
Date: 7/12 PM - 7/13 AM
Day: Friday PM and Saturday AM
Time: 6:30 PM (7/12) - 4:30 AM (7/13)
Duration: 10 hours
Reason: Replacment of old high voltage switch that affects
all of the above-named buildings.
Effect: Loss of all power (access controls, bldg. power,
elevators, computers, telephones, lighting and corridors/
stairs); chilled water;(Air) supply ventilation, supply
cooling, supply heating, exhaust laboratory, exhaust
general, exhaust toilet and compressed control;(Steam) high,