Request for Shutdown for NW-21 - entire building

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Tue Mar 26 10:20:02 1996

Date: Tue, 26 Mar 1996 10:19 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, Opsnote@MIT.EDU
X-Envelope-To: Opsnote@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, Opsnote@mit.edu"

The following is information pertaining to the request for a shutdown
for NW-21 for this coming Saturay.  Please advise if this is all right
via return email with a copy fo IN%"sdverify@mit.edu".

Thanks, Andrea

Building:       NW-21 - entire building
System:         Control air system.
Date:           3/3096
Day:            Saturday
Time:           8:00 AM - 10:00 AM
Duration:       2 hours
Reason:         To repair leak on control air, dryer.
Effect:         Ventilation systems will run - no cooling will be
                available however.