Shutdowns
daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Thu Feb 29 14:06:21 1996
Date: Thu, 29 Feb 1996 14:05 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU, sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, sdverify@mit.edu,
shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, dcarlson@mit.edu, cappucci@mit.edu, sdverify@mit.edu"
The following information pertains to upcoming shutdowns.
Building: 42 (FCS Computer Room)
System: Supply ventilation, supply cooling and supply heating
Date: 3/25/96
Day: Monday
Time: 8:00 AM - 9:00 AM
Duration: 1 hour
Reason: Change final filters
Effect: Loss of supply ventilation, supply cooling and supply
heating for 1 hour.
Critical Shutdown
Building: 3 - 155
System: Exhaust Hood (#703399--PM states it is a general
exhaust -this is not correct
Date: 3/4/96
Day: Monday
Time: 8:00 AM - 12 noon
Duration: 4 hours
Reason: Replace bearings
Effect: Loss of Exhaust-laboratory air.
Critical Shutdown
Building: NW10
System: Perimeter heating + boilers + pumps.
Date: 3\5\96
Day: Tuesday
Time: 7:30 AM - 10:30 AM
Duration: 3 hours
Reason: To repair or replace leaking 3-way control valve on
boiler modulating valve.
Effect: Loss of heat to corridors only. Student rooms/suites
not affected.
Building: Campus
System: FCS-2
Date: 3/5/96
Day: Tuesday
Time: 10:00 AM - 12 noon
Duration: 2 hours
Reason: Backup of data
Effect: Loss of monitoring alarms.
Building: Campus
System: FCS-3
Date: 3/4/96
Day: Monday
Time: 10:00 AM- 12 noon
Duration: 2 hours
Reason: Backup of data