[29376] in Hotline Meeting
SHUTDOWNS
daemon@ATHENA.MIT.EDU (CVENEZIA%MITPPL.bitnet@mitvma.mit.)
Fri Aug 4 09:35:56 1995
Date: Fri, 4 Aug 1995 09:31 EDT
From: CVENEZIA%MITPPL.bitnet@mitvma.mit.edu
To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, SHUTDOWNS@MIT.EDU, SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, SDVERIFY@MIT.EDU,
SHUTDOWNS@MIT.EDU
X-Vms-To:
IN%"CAPPUCCI@MIT.EDU",IN%"DCARLSON@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"SDVERIFY
@MIT.EDU"
ROUTINE
BUILDING: E40
SYSTEM: AIR HANDLER #1
DATE: 08-11-95
DAY: FRIDAY
TIME: 10AM UNTIL 10:30AM
DURATION: 1/2 HOUR
REASON: REPLACING AIR FILTERS
EFFECT: SUPPLY VENTILATION AND SUPPLY COOLING THROUGHOUT ENTIRE
BUILDING.