[29356] in Hotline Meeting

home help back first fref pref prev next nref lref last post

[VP] Electrical 1,3,11

daemon@ATHENA.MIT.EDU (John J Morey)
Thu Aug 3 10:24:19 1995

To: hotline@MIT.EDU
Date: Thu, 03 Aug 1995 10:24:16 EDT
From: John J Morey <jjmorey@MIT.EDU>


Please leave in hotline untill complete.

JJ


BUILDINGS       -       1, 3 AND 8
SYSTEM          -       ELEC. POWER AND LIGHTING
DATE            -       08-12-95 AND 08-19-95 (SAME SHUTDOWN BOTH DAYS)
DAY             -       SATURDAY
TIME            -       7AM UNTIL 11PM
DURATION        -       16 HOURS
REASON          -       CONSTRUCTION
EFFECT          -       *BUILDING 1 - ALL POWER AND LIGHTING
                        *BUILDING 3 - ALL POWER AND LIGHTING
                        *BUILDING 8 - 480 VOLT LAB POWER ONLY
----------------------------
BUILDINGS:      3 (NORTH AND SOUTH WING)
                1 (ENTIRE BUILDING)
SYSTEM:         ELECTRIC POWER AND LIGHTING
DATE:           08-11-95 UNTIL 08-13-95
DAY:            FRIDAY, SATURDAY AND SUNDAY
TIME:           7PM FRIDAY EVENING UNTIL MIDNIGHT SUNDAY
DURATION:       53 HOURS
REASON:         CONSTRUCTION
EFFECT:         BUILDING 3, NORTH AND SOUTH WINGS WILL HAVE NO POWER.
                ALL POWER AND LIGHTING IN BUILDING 1.  EMERGENCY POWER
                WILL REMAIN ON (SOME LIGHTING, EXIT SIGNS, ETC...)
                THERE WILL BE NO ELEVATORS, COMPUTERS,
                CHILLED WATER (COOLING), VENTILATION OR EXHAUST.

----------------------------
*THIS NEXT SHUTDOWN IS FOR TWO CONSECUTIVE SATURDAYS 08-12-95 AND
 08-19-95*
BUILDINGS:      1, 3 AND 8
SYSTEMS:        ELECTRIC POWER, LIGHTING AND 480 VOLT LAB POWER
DATE:           08-12-95
DAY:            SATURDAY
TIME:           7AM UNTIL 11PM
DURATION:       16 HOURS
REASON:         CONSTRUCTION
EFFECT:         ALL POWER AND LIGHTING IN BUILDINGS 1 AND 3.  INCLUDES
                ALL MECHANICAL EQUIPMENT.  ELEVATORS, COMPUTERS,
                CHILLED WATER (AC COOING), SUPPLY VENTILATION AND
                EXHAUST WILL ALL BE AFFECTED.  NOTE ON THE ABOVE TWO
                SHUTDOWNS THAT BUILDING 1 WILL BE DOWN ALL WEEKEND
                (8/11 - 08/13) AND BUILDING 3 (NORTH AND SOUTH WINGS).
                ALL OF BUILDING 3 WILL BE DOWN ON SATURDAY 8/12 FROM
                7AM-11PM.  BUILDING 8 (480 VOLT LAB POWER) WILL ALSO BE
                DOWN ON SATURDAY FROM 7AM-11PM.
--------------------------
BUILDINGS:      11 AND 3
SYSTEMS:        ALL ELECTRIC POWER AND LIGHTING
DATE:           08-11-95 UNTIL 08-12-95
DAY:            FRIDAY AND SATURDAY
TIME:           7PM FRIDAY UNTIL 7AM SATURDAY
DURATION:       12 HOURS
REASON:         CONSTRUCTION
EFFECT:         ALL POWER IN THE BASEMENT OF BUILDING 11, INCLUDING
                LIGHTS ONLY ON THE 2ND AND 3RD FLOORS.  ALL POWER IN
                MAIN CORRIDOR WING OF BUILDING 3.  ALL POWER INCLUDES
                ACCESS CONTROLS, ELEVATORS, COMPUTERS, LIGHTING,
                CHILLED WATER (AC COOLING), SUPPLY VENTILATION AND
                EXHAUST.

home help back first fref pref prev next nref lref last post