Shutdown bldgs. W34, W45, W53

daemon@ATHENA.MIT.EDU (Jason M. Roush)
Thu Jul 13 15:33:13 1995

Date: Thu, 13 Jul 1995 15:29 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu"

Following is a shutdown notification:

Emergency

        Buildings:              W34, W45, W53
        System:                 Electrical power
        Date:                   7/14/95
        Day:                    Friday
        Time:                   6:30 a.m - 7:00 a.m.
        Duration:               30 minutes
        Reason:                 Change fuses to provide a second
                                reliable source of power to W91
        Effect:                 No electrical power to bldg. for
                                30 minutes, affecting elevators,
                                lighting, air supply ventilation,
                                air supply cooling (not chilled
                                water cooling), general and toilet
                                exhaust, and compressed air control.