[29126] in Hotline Meeting
Shutdown bldgs. W34, W45, W53
daemon@ATHENA.MIT.EDU (Jason M. Roush)
Thu Jul 13 15:33:13 1995
Date: Thu, 13 Jul 1995 15:29 EDT
From: "Jason M. Roush" <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU
Cc: sdverify@MIT.EDU
X-Envelope-To: sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu"
Following is a shutdown notification:
Emergency
Buildings: W34, W45, W53
System: Electrical power
Date: 7/14/95
Day: Friday
Time: 6:30 a.m - 7:00 a.m.
Duration: 30 minutes
Reason: Change fuses to provide a second
reliable source of power to W91
Effect: No electrical power to bldg. for
30 minutes, affecting elevators,
lighting, air supply ventilation,
air supply cooling (not chilled
water cooling), general and toilet
exhaust, and compressed air control.