[27968] in Hotline Meeting
ELECTRICAL SHUTDOWN
daemon@ATHENA.MIT.EDU (OPCTEMP%MITPPL.BITNET@mitvma.mit.e)
Thu Apr 20 12:02:49 1995
Date: Thu, 20 Apr 1995 12:00 EDT
From: OPCTEMP%MITPPL.BITNET@mitvma.mit.edu
To: DCARLSON@MIT.EDU, CAPPUCCI@MIT.EDU, SHUTDOWNS@MIT.EDU, TELECOMM@MIT.EDU
Cc: SDVERIFY@MIT.EDU
X-Envelope-To: CAPPUCCI@MIT.EDU, DCARLSON@MIT.EDU, SDVERIFY@MIT.EDU,
SHUTDOWNS@MIT.EDU, TELECOMM@MIT.EDU
X-Vms-To:
IN%"DCARLSON@MIT.EDU",IN%"CAPPUCCI@MIT.EDU",IN%"SHUTDOWNS@MIT.EDU",IN%"TELECOMM
@MIT.EDU"
THE FOLOWING IS AN ELECTRICAL SHUTDOWN
ROUTINE
BLDG: 12 ROOM 056
SYSTEM: POWER TO LAB EQUIPMENT
DATE: 4/21/95
DAY: FRIDAY
TIME: 8:00 AM - 12:00 PM
DURATION: 4 HOURS
REASON: CONSTRUCTION
EFFECT: POWER TO LAB EQUIPMENT WILL BE DOWN FOR
4 HOURS