[26011] in Hotline Meeting

home help back first fref pref prev next nref lref last post

RE:Boiler shutdown

daemon@ATHENA.MIT.EDU (jjmorey@MIT.EDU)
Mon Dec 12 14:33:56 1994

From: jjmorey@MIT.EDU
To: shutdowns@MIT.EDU
Date: Mon, 12 Dec 1994 14:33:47 EST


------- Forwarded Message

Received: from PACIFIC-CARRIER-ANNEX.MIT.EDU by po8.MIT.EDU (5.61/4.7) id AA13145; Mon, 12 Dec 94 14:15:59 EST
Received: from MITVMA.MIT.EDU by MIT.EDU with SMTP
	id AA02630; Mon, 12 Dec 94 14:15:22 EST
Received: from MITVMA.MIT.EDU by mitvma.mit.edu (IBM VM SMTP V2R2)
   with BSMTP id 7872; Mon, 12 Dec 94 14:15:15 EST
Received: from MITPPL.BITNET (NJE origin MTOBIN@MITPPL) by MITVMA.MIT.EDU
 (LMail V1.2a/1.8a) with BSMTP id 1961; Mon, 12 Dec 1994 14:15:15 -0500
Received: from MITPPL.BITNET by MITPPL.BITNET (PMDF #12255) id
 <01HKK4MT4ZM88WWPQY@MITPPL.BITNET>; Mon, 12 Dec 1994 14:10 EDT
Date: Mon, 12 Dec 1994 14:10 EDT
From: MTOBIN%MITPPL.BITNET@mitvma.mit.edu
Subject: UPDATE ON MAIN BOILER PROBLEM
To: PLANT-NOTIFY@MIT.EDU
Message-Id: <01HKK4MT4ZM88WWPQY@MITPPL.BITNET>
X-Envelope-To: PLANT-NOTIFY@MIT.EDU
X-Vms-To: IN%"PLANT-NOTIFY@MIT.EDU"
X-Vms-Cc: MTOBIN,MTOBIN

The Central Utilities Plant is slowley recovering from the boiler
problems that began abouit 8:00 this morning.  At this time Physical
Plant is bringing heating systems back on line as quickly as the steam
system can handle the increasing load.

Please bear with us as this process continues. It is not expected that
the Central Utilities Plant boiler system operation will be totally
back to normal before 6:00 pm this evening.

If you do not have heat by that time, please call the Operations Center
at 3-4948 (FIXIT).