Bldg 16 shutdown
daemon@ATHENA.MIT.EDU (elliot@MIT.EDU)
Wed Oct 19 10:20:44 1994
From: elliot@MIT.EDU
To: shutdowns@MIT.EDU
Date: Wed, 19 Oct 94 10:20:32 EDT
Type of utility (or utilities) to be shutdown: Hot and Cold water for bldg 16
Location of shutdown: Basement mains (no water in bldg on days of work),
(no DHW + DCW to entire bldg)
Length of time down: 10 hrs What day(s): 10/22/94
Hours: Start at 6 am back on at 4:30 pm Date 10/22/94
Reason for shutdown: Pipe sampling for renovation work
Shutdown requested by: Contractor Beacon Const
Shop -
Person requesting shutdown: Ben Huffard
Job number W717481-01 Account number 11275
Comments: Shut off DCW pmp (701274) DHW cinc 701266, converter steam DCW and
bldg 26 isolation valve. Start DCW pmp 701617 in 26-004MR. Check for water
pressure + flow before draining bldg 16.