[171414] in Hotline Meeting

home help back first fref pref prev next nref lref last post

*Revised - Bldg. 46 - All, Fire Alarm Shutdown Notification and

daemon@ATHENA.MIT.EDU (Janine Findlay)
Fri Aug 9 10:14:40 2013

From: Janine Findlay <jfindlay@plant.mit.edu>
To: "graham@mit.edu" <graham@mit.edu>, "abm@mit.edu" <abm@mit.edu>,
        "Gerry
 Desmond" <gdesmond@mit.edu>,
        "rqsmith@mit.edu" <rqsmith@mit.edu>,
        "macdonaj@mit.edu" <macdonaj@mit.edu>,
        OPS RM Campus Services Main
	<rm-mcs@mit.edu>,
        Ops CSG All <csg-all@mit.edu>, "liberman@mit.edu"
	<liberman@mit.edu>,
        "heatherg@mit.edu" <heatherg@mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu"
	<whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        "wradochi@mit.edu"
	<wradochi@mit.edu>,
        "sgilliga@mit.edu" <sgilliga@mit.edu>,
        "Ops RM Fire
 Protection Team" <rm-fire-prot-team@mit.edu>,
        Ops RM Shutdown
	<rm-shutdown@mit.edu>
CC: "sudy@mit.edu" <sudy@mit.edu>
Date: Fri, 9 Aug 2013 10:14:19 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C687EEC1@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following *revised fire alarm shutdown notification for Bldg. 46 - All,=
 on Tuesday, August 13, 2013, 6:00am - *6:00pm, and Wednesday, August 14, 2=
013, 6:00am - 2:00pm, with *intermittent live audible testing to take place=
 on Floors 1 through 3, on *Wednesday only, August 14, 2013, 6:00am - 8:00a=
m, is for your information and response.  Any questions, please contact Sud=
y Nally, x8-8010.



Please let us know whether this does or does not have your approval.



Thank you,



Jani Findlay

Comprehensive Stewardship Group

Dept. of Facilities

x3-6381



Type: Normal

Date: August 13, 2013

Day: Tuesday

Time: 6:00am - 2:00pm each day; *intermittent live testing 6:00am - 8:00am =
each day  6:00am - 6:00pm (Tues.), 6:00am - 2:00pm (Wed.), and *intermitten=
t live testing 6:00am - 8:00am (*Wed only)

Building(s): 46

Room(s): All and *intermittent live testing on Floors 1 - 3

System: Fire Alarm and *Intermittent Live Audible Testing

Duration: 8 hours/day  12 hours/8 hours

Reason:

We request bldg 46-all fire alarm shutdowns from 6 AM to 2 PM on Tuesday, A=
ugust 13th and Wednesday, August 14th, 2013 with *live testing on the 1st, =
2nd & 3rd floors intermittently from 6 AM to 8 AM* for Simplex (Rich Perron=
) and Fire Command Systems to program the 46-1150 notifier pre-action syste=
m panel into the Simplex system and to expand the # of DGP points as part o=
f the 46-MRI lab renovation project by Wise Construction (Chris Luongo 781-=
389-5749).   Sudy Nally 8-8010 and Biss Teelucksingh are the MIT project ma=
nagers on behalf of Billy Homeyer.



*Revised - We would like to modify the 46-all fire alarm shutdowns as follo=
ws:  from 6 AM to 6 PM on Tuesday, August 13th and from 6 AM to 2 PM on Wed=
nesday, August 14th, 2013, w/*live testing on the 1st, 2nd & 3rd floors int=
ermittently from 6 AM to 8 AM* on Wednesday, for Simplex (Rich Perron) and =
Fire Command Systems to program the 46-1150 notifier pre-action system pane=
l into the Simplex system and to expand the # of DGP points as part of the =
46-MRI lab renovation project by Wise Construction (Chris Luongo 781-389-57=
49).



Effect:

Loss of fire alarms for the duration of the shutdown and *intermittent live=
 audble testing from 6am - 8am *on Wednesday only.





--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40"><head><meta http-equiv=3DContent-Type content=
=3D"text/html; charset=3Dus-ascii"><meta name=3DGenerator content=3D"Micros=
oft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
	{font-family:Calibri;
	panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
	{margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
	{mso-style-priority:99;
	color:blue;
	text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
	{mso-style-priority:99;
	color:purple;
	text-decoration:underline;}
p.MsoPlainText, li.MsoPlainText, div.MsoPlainText
	{mso-style-priority:99;
	mso-style-link:"Plain Text Char";
	margin:0in;
	margin-bottom:.0001pt;
	font-size:11.0pt;
	font-family:"Calibri","sans-serif";}
span.PlainTextChar
	{mso-style-name:"Plain Text Char";
	mso-style-priority:99;
	mso-style-link:"Plain Text";
	font-family:"Calibri","sans-serif";}
.MsoChpDefault
	{mso-style-type:export-only;
	font-family:"Calibri","sans-serif";}
@page WordSection1
	{size:8.5in 11.0in;
	margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
	{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]--></head><body lang=3DEN-US link=3Dblue vli=
nk=3Dpurple><div class=3DWordSection1><p class=3DMsoPlainText>The following=
 *revised fire alarm shutdown notification for Bldg. 46 - All, on Tuesday, =
August 13, 2013, 6:00am - *6:00pm, and Wednesday, August 14, 2013, 6:00am &=
#8211; 2:00pm, with *intermittent live audible testing to take place on Flo=
ors 1 through 3, on *Wednesday only, August 14, 2013, 6:00am - 8:00am, is f=
or your information and response.&nbsp; Any questions, please contact Sudy =
Nally, x8-8010.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></p>=
<p class=3DMsoPlainText>Please let us know whether this does or does not ha=
ve your approval.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></=
p><p class=3DMsoPlainText>Thank you,<o:p></o:p></p><p class=3DMsoPlainText>=
<o:p>&nbsp;</o:p></p><p class=3DMsoPlainText>Jani Findlay<o:p></o:p></p><p =
class=3DMsoPlainText>Comprehensive Stewardship Group<o:p></o:p></p><p class=
=3DMsoPlainText>Dept. of Facilities<o:p></o:p></p><p class=3DMsoPlainText>x=
3-6381<o:p></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></p><p class=
=3DMsoPlainText>Type: Normal<o:p></o:p></p><p class=3DMsoPlainText>Date: Au=
gust 13, 2013<o:p></o:p></p><p class=3DMsoPlainText>Day: Tuesday<o:p></o:p>=
</p><p class=3DMsoPlainText>Time: <s>6:00am - 2:00pm each day; *intermitten=
t live testing 6:00am - 8:00am each day</s>&nbsp; 6:00am - 6:00pm (Tues.), =
6:00am - 2:00pm (Wed.), and *intermittent live testing 6:00am - 8:00am (*We=
d only) <o:p></o:p></p><p class=3DMsoPlainText>Building(s): 46<o:p></o:p></=
p><p class=3DMsoPlainText>Room(s): All and *intermittent live testing on Fl=
oors 1 - 3<o:p></o:p></p><p class=3DMsoPlainText>System: Fire Alarm and *In=
termittent Live Audible Testing<o:p></o:p></p><p class=3DMsoPlainText>Durat=
ion: <s>8 hours/day</s>&nbsp; 12 hours/8 hours<o:p></o:p></p><p class=3DMso=
PlainText>Reason: <o:p></o:p></p><p class=3DMsoPlainText>We request bldg 46=
-all fire alarm shutdowns from 6 AM to 2 PM on Tuesday, August 13th and Wed=
nesday, August 14th, 2013 with *live testing on the 1st, 2nd &amp; 3rd floo=
rs intermittently from 6 AM to 8 AM* for Simplex (Rich Perron) and Fire Com=
mand Systems to program the 46-1150 notifier pre-action system panel into t=
he Simplex system and to expand the # of DGP points as part of the 46-MRI l=
ab renovation project by Wise Construction (Chris Luongo 781-389-5749).&nbs=
p;&nbsp; Sudy Nally 8-8010 and Biss Teelucksingh are the MIT project manage=
rs on behalf of Billy Homeyer.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&=
nbsp;</o:p></p><p class=3DMsoPlainText><span style=3D'color:black'>*Revised=
 - We would like to modify the 46-all fire alarm shutdowns as follows:&nbsp=
; from 6 AM to 6 PM on Tuesday, August 13th and from 6 AM to 2 PM on Wednes=
day, August 14th, 2013, w/*live testing on the 1st, 2nd &amp; 3rd floors in=
termittently from 6 AM to 8 AM* on Wednesday, for Simplex (Rich Perron) and=
 Fire Command Systems to program the 46-1150 notifier pre-action system pan=
el into the Simplex system and to expand the # of DGP points as part of the=
 46-MRI lab renovation project by Wise Construction (Chris Luongo 781-389-5=
749).&nbsp; <o:p></o:p></span></p><p class=3DMsoPlainText><span style=3D'co=
lor:black'><o:p>&nbsp;</o:p></span></p><p class=3DMsoPlainText>Effect: <o:p=
></o:p></p><p class=3DMsoPlainText>Loss of fire alarms for the duration of =
the shutdown and *intermittent live audble testing from 6am - 8am *on Wedne=
sday only.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&nbsp;</o:p></p><p cl=
ass=3DMsoPlainText><o:p>&nbsp;</o:p></p></div></body></html>=

--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_--

home help back first fref pref prev next nref lref last post