[171414] in Hotline Meeting
*Revised - Bldg. 46 - All, Fire Alarm Shutdown Notification and
daemon@ATHENA.MIT.EDU (Janine Findlay)
Fri Aug 9 10:14:40 2013
From: Janine Findlay <jfindlay@plant.mit.edu>
To: "graham@mit.edu" <graham@mit.edu>, "abm@mit.edu" <abm@mit.edu>,
"Gerry
Desmond" <gdesmond@mit.edu>,
"rqsmith@mit.edu" <rqsmith@mit.edu>,
"macdonaj@mit.edu" <macdonaj@mit.edu>,
OPS RM Campus Services Main
<rm-mcs@mit.edu>,
Ops CSG All <csg-all@mit.edu>, "liberman@mit.edu"
<liberman@mit.edu>,
"heatherg@mit.edu" <heatherg@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"whomeyer@mit.edu"
<whomeyer@mit.edu>,
"ksemerj@mit.edu" <ksemerj@mit.edu>,
"wradochi@mit.edu"
<wradochi@mit.edu>,
"sgilliga@mit.edu" <sgilliga@mit.edu>,
"Ops RM Fire
Protection Team" <rm-fire-prot-team@mit.edu>,
Ops RM Shutdown
<rm-shutdown@mit.edu>
CC: "sudy@mit.edu" <sudy@mit.edu>
Date: Fri, 9 Aug 2013 10:14:19 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C687EEC1@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following *revised fire alarm shutdown notification for Bldg. 46 - All,=
on Tuesday, August 13, 2013, 6:00am - *6:00pm, and Wednesday, August 14, 2=
013, 6:00am - 2:00pm, with *intermittent live audible testing to take place=
on Floors 1 through 3, on *Wednesday only, August 14, 2013, 6:00am - 8:00a=
m, is for your information and response. Any questions, please contact Sud=
y Nally, x8-8010.
Please let us know whether this does or does not have your approval.
Thank you,
Jani Findlay
Comprehensive Stewardship Group
Dept. of Facilities
x3-6381
Type: Normal
Date: August 13, 2013
Day: Tuesday
Time: 6:00am - 2:00pm each day; *intermittent live testing 6:00am - 8:00am =
each day 6:00am - 6:00pm (Tues.), 6:00am - 2:00pm (Wed.), and *intermitten=
t live testing 6:00am - 8:00am (*Wed only)
Building(s): 46
Room(s): All and *intermittent live testing on Floors 1 - 3
System: Fire Alarm and *Intermittent Live Audible Testing
Duration: 8 hours/day 12 hours/8 hours
Reason:
We request bldg 46-all fire alarm shutdowns from 6 AM to 2 PM on Tuesday, A=
ugust 13th and Wednesday, August 14th, 2013 with *live testing on the 1st, =
2nd & 3rd floors intermittently from 6 AM to 8 AM* for Simplex (Rich Perron=
) and Fire Command Systems to program the 46-1150 notifier pre-action syste=
m panel into the Simplex system and to expand the # of DGP points as part o=
f the 46-MRI lab renovation project by Wise Construction (Chris Luongo 781-=
389-5749). Sudy Nally 8-8010 and Biss Teelucksingh are the MIT project ma=
nagers on behalf of Billy Homeyer.
*Revised - We would like to modify the 46-all fire alarm shutdowns as follo=
ws: from 6 AM to 6 PM on Tuesday, August 13th and from 6 AM to 2 PM on Wed=
nesday, August 14th, 2013, w/*live testing on the 1st, 2nd & 3rd floors int=
ermittently from 6 AM to 8 AM* on Wednesday, for Simplex (Rich Perron) and =
Fire Command Systems to program the 46-1150 notifier pre-action system pane=
l into the Simplex system and to expand the # of DGP points as part of the =
46-MRI lab renovation project by Wise Construction (Chris Luongo 781-389-57=
49).
Effect:
Loss of fire alarms for the duration of the shutdown and *intermittent live=
audble testing from 6am - 8am *on Wednesday only.
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html xmlns:v=3D"urn:schemas-microsoft-com:vml" xmlns:o=3D"urn:schemas-micr=
osoft-com:office:office" xmlns:w=3D"urn:schemas-microsoft-com:office:word" =
xmlns:m=3D"http://schemas.microsoft.com/office/2004/12/omml" xmlns=3D"http:=
//www.w3.org/TR/REC-html40"><head><meta http-equiv=3DContent-Type content=
=3D"text/html; charset=3Dus-ascii"><meta name=3DGenerator content=3D"Micros=
oft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
{font-family:Calibri;
panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
{margin:0in;
margin-bottom:.0001pt;
font-size:11.0pt;
font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
{mso-style-priority:99;
color:blue;
text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
{mso-style-priority:99;
color:purple;
text-decoration:underline;}
p.MsoPlainText, li.MsoPlainText, div.MsoPlainText
{mso-style-priority:99;
mso-style-link:"Plain Text Char";
margin:0in;
margin-bottom:.0001pt;
font-size:11.0pt;
font-family:"Calibri","sans-serif";}
span.PlainTextChar
{mso-style-name:"Plain Text Char";
mso-style-priority:99;
mso-style-link:"Plain Text";
font-family:"Calibri","sans-serif";}
.MsoChpDefault
{mso-style-type:export-only;
font-family:"Calibri","sans-serif";}
@page WordSection1
{size:8.5in 11.0in;
margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext=3D"edit" spidmax=3D"1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext=3D"edit">
<o:idmap v:ext=3D"edit" data=3D"1" />
</o:shapelayout></xml><![endif]--></head><body lang=3DEN-US link=3Dblue vli=
nk=3Dpurple><div class=3DWordSection1><p class=3DMsoPlainText>The following=
*revised fire alarm shutdown notification for Bldg. 46 - All, on Tuesday, =
August 13, 2013, 6:00am - *6:00pm, and Wednesday, August 14, 2013, 6:00am &=
#8211; 2:00pm, with *intermittent live audible testing to take place on Flo=
ors 1 through 3, on *Wednesday only, August 14, 2013, 6:00am - 8:00am, is f=
or your information and response. Any questions, please contact Sudy =
Nally, x8-8010.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></p>=
<p class=3DMsoPlainText>Please let us know whether this does or does not ha=
ve your approval.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></=
p><p class=3DMsoPlainText>Thank you,<o:p></o:p></p><p class=3DMsoPlainText>=
<o:p> </o:p></p><p class=3DMsoPlainText>Jani Findlay<o:p></o:p></p><p =
class=3DMsoPlainText>Comprehensive Stewardship Group<o:p></o:p></p><p class=
=3DMsoPlainText>Dept. of Facilities<o:p></o:p></p><p class=3DMsoPlainText>x=
3-6381<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></p><p class=
=3DMsoPlainText>Type: Normal<o:p></o:p></p><p class=3DMsoPlainText>Date: Au=
gust 13, 2013<o:p></o:p></p><p class=3DMsoPlainText>Day: Tuesday<o:p></o:p>=
</p><p class=3DMsoPlainText>Time: <s>6:00am - 2:00pm each day; *intermitten=
t live testing 6:00am - 8:00am each day</s> 6:00am - 6:00pm (Tues.), =
6:00am - 2:00pm (Wed.), and *intermittent live testing 6:00am - 8:00am (*We=
d only) <o:p></o:p></p><p class=3DMsoPlainText>Building(s): 46<o:p></o:p></=
p><p class=3DMsoPlainText>Room(s): All and *intermittent live testing on Fl=
oors 1 - 3<o:p></o:p></p><p class=3DMsoPlainText>System: Fire Alarm and *In=
termittent Live Audible Testing<o:p></o:p></p><p class=3DMsoPlainText>Durat=
ion: <s>8 hours/day</s> 12 hours/8 hours<o:p></o:p></p><p class=3DMso=
PlainText>Reason: <o:p></o:p></p><p class=3DMsoPlainText>We request bldg 46=
-all fire alarm shutdowns from 6 AM to 2 PM on Tuesday, August 13th and Wed=
nesday, August 14th, 2013 with *live testing on the 1st, 2nd & 3rd floo=
rs intermittently from 6 AM to 8 AM* for Simplex (Rich Perron) and Fire Com=
mand Systems to program the 46-1150 notifier pre-action system panel into t=
he Simplex system and to expand the # of DGP points as part of the 46-MRI l=
ab renovation project by Wise Construction (Chris Luongo 781-389-5749).&nbs=
p; Sudy Nally 8-8010 and Biss Teelucksingh are the MIT project manage=
rs on behalf of Billy Homeyer.<o:p></o:p></p><p class=3DMsoPlainText><o:p>&=
nbsp;</o:p></p><p class=3DMsoPlainText><span style=3D'color:black'>*Revised=
- We would like to modify the 46-all fire alarm shutdowns as follows: =
; from 6 AM to 6 PM on Tuesday, August 13th and from 6 AM to 2 PM on Wednes=
day, August 14th, 2013, w/*live testing on the 1st, 2nd & 3rd floors in=
termittently from 6 AM to 8 AM* on Wednesday, for Simplex (Rich Perron) and=
Fire Command Systems to program the 46-1150 notifier pre-action system pan=
el into the Simplex system and to expand the # of DGP points as part of the=
46-MRI lab renovation project by Wise Construction (Chris Luongo 781-389-5=
749). <o:p></o:p></span></p><p class=3DMsoPlainText><span style=3D'co=
lor:black'><o:p> </o:p></span></p><p class=3DMsoPlainText>Effect: <o:p=
></o:p></p><p class=3DMsoPlainText>Loss of fire alarms for the duration of =
the shutdown and *intermittent live audble testing from 6am - 8am *on Wedne=
sday only.<o:p></o:p></p><p class=3DMsoPlainText><o:p> </o:p></p><p cl=
ass=3DMsoPlainText><o:p> </o:p></p></div></body></html>=
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EEC1dofexchmbx01f_--