[171401] in Hotline Meeting
APPROVED - Bldg. E34-All - Heating Hot Water Shutdown - New Date/
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu Aug 8 13:25:56 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "jdoughty@mit.edu" <jdoughty@mit.edu>, "swade@mit.edu" <swade@mit.edu>,
"mkaratza@MIT.EDU" <mkaratza@mit.edu>,
"craigp@MIT.EDU" <craigp@mit.edu>, "kirky@MIT.EDU" <kirky@mit.edu>,
OPS RM Campus Services East
<rm-ecs@mit.edu>,
"brig@med.mit.edu" <brig@med.mit.edu>,
"fris@med.mit.edu"
<fris@med.mit.edu>,
"scottide@MIT.EDU" <scottide@mit.edu>,
"heatherg@mit.edu"
<heatherg@mit.edu>,
"lhill@mit.edu" <lhill@mit.edu>,
"whomeyer@mit.edu"
<whomeyer@mit.edu>,
"ksemerj@mit.edu" <ksemerj@mit.edu>,
Gary Saffie
<gsaffie@plant.mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"Ops RM
Shutdown" <rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
"cp-command@mit.edu" <cp-command@mit.edu>,
"safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
DOF Customer Service Center
<dof-csc@mit.edu>,
Ops Custodial Admin & Support Staff <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "janb@mit.edu" <janb@mit.edu>
Date: Thu, 8 Aug 2013 13:25:50 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C687EA96@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C687EA96dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EA96dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following Approved Heating Hot Water Shutdown is for bldg. E34 - All o=
n Friday, August 9, 2013 from 5:00am - 8:00am is for your information. Any=
questions please contact Billy Homeyer x8-0432.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 6, 2013/// Now August 9, 2013
Day: Tuesday/// FRIDAY
Time: 5:00am - 8:00am
Building(s): E34
Room(s): All
System: Chilled water (this is just for the Chilled Water Shutdown)
Duration: 3 hrs 5:00am - 8:00am
Reason:
** UPDATED: We would like to modify the bldg E34-all for only the heating =
hot water shutdown (chilled water shutdown has been eliminated) from 5 AM t=
o 8 AM on Friday, August 9th, 2013 for AHC (Guy Fossiano 781-844-7815/Al Ca=
irns 781-844-7817) to tie-in (2) fan coil units as part of the Copy Tech re=
novation project by MetroWest (Art Alfano 781-706-9705). Both the shutdown=
request form and work order # 5201689 have been changed to reflect this ch=
ange on behalf of Billy Homeyer.
We request bldg E34-all chilled water shutdown and heating hot water shutdo=
wn from 5 AM to 8 AM on Tuesday, August 6th, 2013 to tie-in (2) fan coil un=
its as part of the Copy Tech renovation project by MetroWest (Art Alfano 78=
1-706-9705). Jan Burke 8-5463 is the MIT project manager on behalf of Bil=
ly Homeyer.
Effect:
Loss of chilled water and heating hot water for the duration of this shutdo=
wn.
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EA96dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <font color=3D"#1F497D">Approved</font><b> Heating Hot W=
ater Shutdown</b> is for bldg. E34 - All on Friday, August 9, 2013 fr=
om 5:00am - 8:00am is for <b>your information</b>. Any questions plea=
se contact Billy Homeyer x8-0432.</div>
<div> </div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 6, 2013/// Now August 9, 2013</div>
<div>Day: Tuesday/// FRIDAY</div>
<div>Time: 5:00am - 8:00am</div>
<div>Building(s): E34</div>
<div>Room(s): All</div>
<div>System: Chilled water (this is just for the Chilled Water Shutdo=
wn)</div>
<div>Duration: 3 hrs 5:00am - 8:00am </div>
<div>Reason: </div>
<div>** UPDATED: <font color=3D"#1F497D">We would like to modify the =
bldg E34-all for </font><font color=3D"#1F497D"><u><i><b>only</b></i></u></=
font><font color=3D"#1F497D"><b> the heating hot water shutdown</b></font><=
font color=3D"#1F497D"> (chilled water shutdown
has been eliminated) from </font><font color=3D"#1F497D"><u><b>5 AM to 8 AM=
</b></u></font><font color=3D"#1F497D"><b> on Friday, August 9</b></font><f=
ont size=3D"1" color=3D"#1F497D"><sup><b>th</b></sup></font><font color=3D"=
#1F497D"><b>, 2013</b></font><font color=3D"#1F497D">
for AHC (Guy Fossiano 781-844-7815/Al Cairns 781-844-7817) to tie-in (2) fa=
n coil units as part of the Copy Tech renovation project by MetroWest (Art =
Alfano 781-706-9705). Both the shutdown request form and work order #=
5201689 have been changed to reflect
this change on behalf of Billy Homeyer.</font></div>
<div> </div>
<div>We request bldg E34-all chilled water shutdown and heating hot water s=
hutdown from 5 AM to 8 AM on Tuesday, August 6th, 2013 to tie-in (2) fan co=
il units as part of the Copy Tech renovation project by MetroWest (Art Alfa=
no 781-706-9705). Jan Burke 8-5463
is the MIT project manager on behalf of Billy Homeyer.</div>
<div> </div>
<div>Effect: </div>
<div>Loss of chilled water and heating hot water for the duration of this s=
hutdown. </div>
<div> </div>
<div> </div>
</font>
</body>
</html>
--_000_4EEA516695C10541B7CB963FF54A56AF13C687EA96dofexchmbx01f_--