NEED APPROVAL - EXTENDED: Approved: Bldg. 1- All Fire Alarm
daemon@ATHENA.MIT.EDU (Jennifer Garland)
Thu Aug 8 12:34:50 2013
From: Jennifer Garland <jennygar@plant.mit.edu>
To: "mbuehler@MIT.EDU" <mbuehler@mit.edu>,
"patdixon@mit.edu"
<patdixon@mit.edu>,
"jgermain@mit.edu" <jgermain@mit.edu>,
"ghavidel@MIT.EDU"
<ghavidel@mit.edu>,
"savicki@mit.edu" <savicki@mit.edu>,
"OPS RM Campus
Services Main" <rm-mcs@mit.edu>,
"sbghosh@MIT.EDU" <sbghosh@mit.edu>, "fenner@mit.edu" <fenner@mit.edu>,
MIT Schedules Office <schedules@mit.edu>,
"shutdowns@mit.edu" <shutdowns@mit.edu>,
"whomeyer@mit.edu"
<whomeyer@mit.edu>,
"ksemerj@mit.edu" <ksemerj@mit.edu>,
Ops RM Shutdown
<rm-shutdown@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "healyb@mit.edu" <healyb@mit.edu>
Date: Thu, 8 Aug 2013 12:34:44 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C687E9F9@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C687E9F9dofexchmbx01f_"
MIME-Version: 1.0
--_000_4EEA516695C10541B7CB963FF54A56AF13C687E9F9dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
The following EXTENDED Fire Alarm Shutdown/3rd Party Live Audible Testing i=
s for bldg. 1 - All on Sunday, August 4, 2013 at 11:00pm til Friday, August=
9, 2013/ *EXTENDED to include Sunday, August 11, 2013 til Friday, August =
16, 2013 from 11:00pm til 7:00am is for your information and approval. Any =
questions please contact Billy Homeyer x8-0432.
Would you please let us know if this does or does not have your approval.
Thank you,
Jennifer M. Garland
Repair and Maintenance
4-4350
Type: Normal
Date: August 4, 2013
Day: Sunday<
Time: 11:00pm (Sun) - 7:00am (Fri)
Building(s): 1
Room(s): All
System: Fire Alarm
Duration: 11:00pm (Sun) - 7:00am (Fri)
Reason:
**EXTENDED - We would like to extend the bldg 1-all fire alarm shutdowns fr=
om 11 PM to 7 AM to include Sunday evening, August 11th through Thursday, A=
ugust 15th, 2013 (into Friday morning) to conduct *3rd party live audible t=
esting of the bldg 1 fire alarm system* and to be witnessed by DEI (Phil De=
neault 508-341-4184) as part of the bldg 1 life-safety fire alarm upgrade p=
roject by Tishman Construction (Dennis Ryan 617-594-0664). Both the shutdo=
wn request form and work order #5204362 have been modified to reflect this =
extension.
We request bldg 1-all fire alarm shutdowns from 11 PM to 7 AM on Sunday eve=
ning, August 4th through Thursday, August 8th, 2013 (into Friday morning) t=
o conduct *3rd party live audible testing of the bldg 1 fire alarm system* =
and to be witnessed by DEI Systems (Phil Deneault 508-341-4184) as part of =
the bldg 1 life-safety fire alarm upgrade project by Tishman Construction (=
Dennis Ryan 617-594-0664). Brian Healy 8-8565 is the MIT project manager on=
behalf of Billy Homeyer.
Effect:
Loss of fire alarms for the duration of this shutdown.
--_000_4EEA516695C10541B7CB963FF54A56AF13C687E9F9dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
#800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following <b>EXTENDED</b> Fire Alarm Shutdown/3rd Party Live Audib=
le Testing is for bldg. 1 - All on Sunday, August 4, 2013 at 11:00pm til Fr=
iday, August 9, 2013/ *EXTENDED to include Sunday, August 11, 2013 til Frid=
ay, August 16, 2013 from 11:00pm
til 7:00am is for your <b>information</b><b> and approval</b>. Any question=
s please contact Billy Homeyer x8-0432.</div>
<div> </div>
<div><b>Would you please let us know if this does or does not have your app=
roval.</b></div>
<div> </div>
<div>Thank you,</div>
<div> </div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div> </div>
<div>Type: Normal</div>
<div>Date: August 4, 2013</div>
<div>Day: Sunday<</div>
<div>Time: 11:00pm (Sun) - 7:00am (Fri)</div>
<div>Building(s): 1</div>
<div>Room(s): All</div>
<div>System: Fire Alarm</div>
<div>Duration: 11:00pm (Sun) - 7:00am (Fri)</div>
<div>Reason: </div>
<div> </div>
<div>**<b>EXTENDED - </b><b>We would like to extend the bldg 1-all fire ala=
rm shutdowns from 11 PM to 7 AM to include Sunday evening, August 11th thro=
ugh Thursday, August 15th, 2013 (into Friday morning) to conduct *3rd party=
live audible testing of the bldg
1 fire alarm system* and to be witnessed by DEI (Phil Deneault 508-341-4184=
) as part of the bldg 1 life-safety fire alarm upgrade project by Tishman C=
onstruction (Dennis Ryan 617-594-0664). Both the shutdown request for=
m and work order #5204362 have been modified
to reflect this extension.</b></div>
<div> </div>
<div> </div>
<div>We request bldg 1-all fire alarm shutdowns from 11 PM to 7 AM on Sunda=
y evening, August 4th through Thursday, August 8th, 2013 (into Friday morni=
ng) to conduct *3rd party live audible testing of the bldg 1 fire alarm sys=
tem* and to be witnessed by DEI
Systems (Phil Deneault 508-341-4184) as part of the bldg 1 life-safety fire=
alarm upgrade project by Tishman Construction (Dennis Ryan 617-594-0664). =
Brian Healy 8-8565 is the MIT project manager on behalf of Billy Homeyer.</=
div>
<div> </div>
<div>Effect: </div>
<div>Loss of fire alarms for the duration of this shutdown.</div>