[171301] in Hotline Meeting

home help back first fref pref prev next nref lref last post

APPROVED -: EXTENDED - Bldg W20 - All Medium Pressure/Low Pressure

daemon@ATHENA.MIT.EDU (Jennifer Garland)
Mon Aug 5 14:44:58 2013

From: Jennifer Garland <jennygar@plant.mit.edu>
To: "mwf@mit.edu" <mwf@mit.edu>, "liscott@mit.edu" <liscott@mit.edu>,
        "myersm@MIT.EDU" <myersm@mit.edu>, "sdimond@mit.edu" <sdimond@mit.edu>,
        "OPS
 RM Campus Services West" <rm-wcs@mit.edu>,
        "ois-plant-notify@mit.edu"
	<ois-plant-notify@mit.edu>,
        "lsc-chairman@mit.edu" <lsc-chairman@mit.edu>,
        "lsc@mit.edu" <lsc@mit.edu>, "mreagan@mit.edu" <mreagan@mit.edu>,
        "lrbrutti@mit.edu" <lrbrutti@mit.edu>, "rcruz@mit.edu" <rcruz@mit.edu>,
        "semo-admin@mit.edu" <semo-admin@mit.edu>,
        "tenman@the-tech.mit.edu"
	<tenman@the-tech.mit.edu>,
        "shutdowns@the-tech.mit.edu"
	<shutdowns@the-tech.mit.edu>,
        "shutdowns@mit.edu" <shutdowns@mit.edu>,
        "whomeyer@mit.edu" <whomeyer@mit.edu>,
        "ksemerj@mit.edu" <ksemerj@mit.edu>,
        "mmcorrei@mit.edu" <mmcorrei@mit.edu>,
        Ops RM Shutdown <rm-shutdown@mit.edu>,
        Ops RM Shutdown <rm-shutdown@mit.edu>, DOF EHS <dof-ehs@mit.edu>,
        "cp-command@mit.edu" <cp-command@mit.edu>,
        "safety@mit.edu" <safety@mit.edu>, Operators <Operators@plant.mit.edu>,
        DOF Customer Service Center
	<dof-csc@mit.edu>,
        Ops Custodial Admin & Support Staff <cust-staff@mit.edu>
CC: "jennygar@mit.edu" <jennygar@mit.edu>, "sudy@mit.edu" <sudy@mit.edu>
Date: Mon, 5 Aug 2013 14:44:37 -0400
Message-ID: <4EEA516695C10541B7CB963FF54A56AF13C678FDC9@dof-exchmbx01.facilities.ms.mit.edu>
Content-Language: en-US
Content-Type: multipart/alternative;
	boundary="_000_4EEA516695C10541B7CB963FF54A56AF13C678FDC9dofexchmbx01f_"
MIME-Version: 1.0

--_000_4EEA516695C10541B7CB963FF54A56AF13C678FDC9dofexchmbx01f_
Content-Type: text/plain; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

The following  EXTENDED  Medium Pressure/Low Pressure Steam Shutdown is for=
 Bldg. W20 on Thursday, August 1, 2013 from 9:00PM til 6:00am on Friday, Au=
gust 2, 2013  **EXTENDED to also include Tuesday, August 6, 2013 from 9:00P=
M til 6:00am on Wednesday, August 7, 2013  is for you information.  Any que=
stions please contact Billy Homeyer x8-0432.



Thank you,

Jennifer M. Garland
Repair and Maintenance
4-4350

Type: Normal
Date: August 1, 2013/// ** EXTENDED to include Tuesday, August 6, 2013 til =
Wednesday, August 7, 2013
Day: Thursday
Time: 9:00PM (Thu) - 6:00AM (Fri)///** EXTENDED to include 9:00PM (Tue) - 6=
:00AM (Wed)
Building(s): W20
Room(s): bldg.
System: medium/low pressure steam
Duration: 9:00PM (Thu) - 6:00AM (Fri) 9 hrs
Reason:
*** EXTENDED - We would like to extend the bldg W20-all medium pressure/low=
 pressure steam shutdowns from 9 PM to 6 AM on Tuesday evening, August 6th,=
 2013 (into Wednesday morning) for re-routing the medium/low pressure steam=
 line to provide access for new ductwork as part of the W20-019 catering ki=
tchen renovation project by Elaine Construction (Robin Lorscheider 781-727-=
8835).  Both the shutdown request form and w.o. #5204188 have been modified=
 to reflect this extension.

We request bldg W20-all medium pressure/low pressure steam shutdowns from 9=
 PM to 6 AM on Thursday evening, August 1st, 2013 (into Friday morning) for=
 re-routing the medium/low pressure steam line to provide access for new du=
ctwork as part of the W20-019 catering kitchen renovation project by Elaine=
 Construction (Robin Lorscheider 781-727-8835). Sudy Nally 8-8010 and Jason=
 Mullen 4-7232 on behalf of Billy Homeyer.

Effect:
Loss of medium/low pressure steam for the duration of this shutdown.



--_000_4EEA516695C10541B7CB963FF54A56AF13C678FDC9dofexchmbx01f_
Content-Type: text/html; charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<html>
<head>
<meta http-equiv=3D"Content-Type" content=3D"text/html; charset=3Dus-ascii"=
>
<meta name=3D"Generator" content=3D"Microsoft Exchange Server">
<!-- converted from rtf -->
<style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left:=
 #800000 2px solid; } --></style>
</head>
<body>
<font face=3D"Calibri, sans-serif" size=3D"2">
<div>The following&nbsp; <b>EXTENDED&nbsp; </b>Medium Pressure/Low Pressure=
 Steam Shutdown is for Bldg. W20 on Thursday, August 1, 2013 from 9:00PM ti=
l 6:00am on Friday, August 2, 2013&nbsp; **EXTENDED to also include Tuesday=
, August 6, 2013 from 9:00PM til 6:00am on Wednesday,
August 7, 2013&nbsp; is for you i<b>nformation</b>.&nbsp; Any questions ple=
ase contact Billy Homeyer x8-0432.</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>&nbsp;</div>
<div>Thank you,</div>
<div>&nbsp;</div>
<div>Jennifer M. Garland</div>
<div>Repair and Maintenance</div>
<div>4-4350</div>
<div>&nbsp;</div>
<div>Type: Normal</div>
<div>Date: August 1, 2013/// ** <b>EXTENDED</b> to include Tuesday, August =
6, 2013 til Wednesday, August 7, 2013</div>
<div>Day: Thursday</div>
<div>Time: 9:00PM (Thu) - 6:00AM (Fri)///** EXTENDED to include 9:00PM (Tue=
) - 6:00AM (Wed)</div>
<div>Building(s): W20</div>
<div>Room(s): bldg.</div>
<div>System: medium/low pressure steam</div>
<div>Duration: 9:00PM (Thu) - 6:00AM (Fri) 9 hrs</div>
<div>Reason: </div>
<div>*** <b>EXTENDED - We would like to extend the bldg W20-all medium pres=
sure/low pressure steam shutdowns from 9 PM to 6 AM on Tuesday evening, Aug=
ust 6th, 2013 (into Wednesday morning) for re-routing the medium/low pressu=
re steam line to provide access
for new ductwork as part of the W20-019 catering kitchen renovation project=
 by Elaine Construction (Robin Lorscheider 781-727-8835).&nbsp; Both the sh=
utdown request form and w.o. #5204188 have been modified to reflect this ex=
tension.</b></div>
<div>&nbsp;</div>
<div>We request bldg W20-all medium pressure/low pressure steam shutdowns f=
rom 9 PM to 6 AM on Thursday evening, August 1st, 2013 (into Friday morning=
) for re-routing the medium/low pressure steam line to provide access for n=
ew ductwork as part of the W20-019
catering kitchen renovation project by Elaine Construction (Robin Lorscheid=
er 781-727-8835). Sudy Nally 8-8010 and Jason Mullen 4-7232 on behalf of Bi=
lly Homeyer.</div>
<div>&nbsp;</div>
<div>Effect: </div>
<div>Loss of medium/low pressure steam for the duration of this shutdown. <=
/div>
<div>&nbsp;</div>
<div>&nbsp;</div>
</font>
</body>
</html>

--_000_4EEA516695C10541B7CB963FF54A56AF13C678FDC9dofexchmbx01f_--

home help back first fref pref prev next nref lref last post